Compare commits

...

144 Commits

Author SHA1 Message Date
overtrue e8847f6f1d test(gateway): assert the store-fault answer names nothing
The 500 answer to a credential-store fault is checked to carry neither the looked-up key, nor a secret, nor a reason for the failed lookup. The test comment records that the earlier pin answered 403.
2026-11-12 04:13:20 +08:00
overtrue ee7523bab6 test(gateway): expect 500 for a credential-store fault on the new pin
The gateway's RustFS authenticator preset now answers a credential-store fault as 500 InternalError (rustfs/gateway#1585, ledger R-068), which is what the legacy stack answers. The two tests that pinned the old 403 InvalidAccessKeyId now expect the fault answer; the assembly itself is unchanged.
2026-11-12 04:12:06 +08:00
overtrue ca8769d7c2 Merge remote-tracking branch 'origin/main' into gw/T2.5-gateway-stack 2026-11-12 01:16:40 +08:00
overtrue 83f3fbf2cd Merge remote-tracking branch 'origin/main' into gw/T2.5-gateway-stack 2026-11-12 00:46:17 +08:00
overtrue f56477eb53 Merge remote-tracking branch 'origin/main' into gw/T2.5-gateway-stack
# Conflicts:
#	rustfs/src/storage/access.rs
#	rustfs/src/storage/storage_api.rs
2026-11-11 22:58:00 +08:00
overtrue 2f55ddb595 Merge remote-tracking branch 'origin/gw/T1.8-access-envelope' into gw/T2.5-gateway-stack
# Conflicts:
#	.config/make/pre-commit.mak
#	.config/test-count-baseline.txt
#	Cargo.lock
#	Cargo.toml
#	crates/gateway-adapter/Cargo.toml
#	crates/gateway-adapter/src/lib.rs
2026-11-11 20:53:15 +08:00
overtrue 44e147e8eb test(gateway): sign the probe request with a declared payload token
The probe request carried no x-amz-content-sha256 and was answered 400 before it reached the handler. It now declares an unsigned payload, and a probe that is not reached reports the answer it got.
2026-11-11 20:01:29 +08:00
overtrue dd760dfa56 fix(app): drop the PutObjectInput re-export main now provides 2026-11-11 19:37:21 +08:00
overtrue 7be29ee088 Merge remote-tracking branch 'origin/main' into gw/T1.8-access-envelope 2026-11-11 19:22:52 +08:00
overtrue 70a0267d01 Merge remote-tracking branch 'origin/gw/T1.8-access-envelope' into gw/T2.5-gateway-stack 2026-11-11 18:03:26 +08:00
overtrue 28ac9de62a fix(auth): keep the test-only credentials rebuild out of the lib build 2026-11-11 17:39:55 +08:00
overtrue da6c626f2a fix(gateway): refuse an empty handed-over secret at the gateway edge
RequestCredentials no longer represents an absent secret as an empty string. The gateway edge maps the new constructor result, and a signed ListBuckets request is shown to reach its handler without the caller's secret, where a reader of it fails closed.
2026-11-11 17:35:13 +08:00
overtrue e2fee7cb2b Merge remote-tracking branch 'origin/gw/T1.8-access-envelope' into gw/T2.5-gateway-stack
# Conflicts:
#	rustfs/src/app/context/envelope.rs
2026-11-11 17:12:17 +08:00
overtrue a115748cda fix(auth): make an absent caller secret unrepresentable as a key
RequestCredentials::secret_key now returns Option<&str>: None when the edge kept the secret, and an empty handed-over secret is refused at construction. Secret comparisons go through secret_key_matches, which never matches an absent secret, and readers that need the value fail closed with an internal error.
2026-11-11 17:08:17 +08:00
overtrue 1f7f5b8532 fix(table-catalog): restore owned request lines the main merge reverted
The merge onto main replaced two lines with main's text: the warehouse location check again wrapped an already owned request in legacy_request_view, and an error conversion was re-added. Restore the branch's version of the file.
2026-11-11 16:44:45 +08:00
overtrue 0721822cfa Merge remote-tracking branch 'origin/gw/T1.8-access-envelope' into gw/T2.5-gateway-stack 2026-11-11 16:03:45 +08:00
overtrue 0b7fd7a367 Merge remote-tracking branch 'origin/gw/T2.5-gateway-stack' into gw/T2.5-gateway-stack 2026-11-11 15:55:44 +08:00
Chris An f3b0806547 fix(gateway): reconcile squashed foundation with main
Merge main after the foundation squash, preserving gateway branch changes
and importing the unchanged scanner prefix fix from main.

Verified exact tree preservation outside the two scanner files, whitespace,
release-boundary guard and self-test, footprint guard, and logging guard.
Rust compile, fmt and scoped tests unavailable locally: no Rust toolchain.
Test-count guard could not run because cargo metadata is unavailable.
2026-11-11 02:55:06 -05:00
overtrue 1fbcacb2b6 test(auth): cover multipart staging in the owned/legacy decision matrix 2026-11-11 15:53:57 +08:00
overtrue 7729e8c337 Merge remote-tracking branch 'origin/gw/T1.8-access-envelope' into gw/T2.5-gateway-stack
# Conflicts:
#	rustfs/src/storage/storage_api.rs
2026-11-11 15:53:25 +08:00
overtrue a537b6ea98 Merge remote-tracking branch 'origin/gw/T2.1-adapter-foundation' into gw/T2.5-gateway-stack 2026-11-11 15:53:11 +08:00
overtrue 3805f2970e Merge remote-tracking branch 'origin/main' into gw/T1.8-access-envelope 2026-11-11 15:42:39 +08:00
overtrue 62f0385769 Merge remote-tracking branch 'origin/gateway/integration' into gw/T1.8-access-envelope 2026-11-11 15:42:39 +08:00
overtrue c312102bab docs(gateway-adapter): state what install guarantees about the provider handle 2026-11-11 15:41:18 +08:00
overtrue 35e6c8077d Merge remote-tracking branch 'origin/main' into gw/T2.1-adapter-foundation 2026-11-11 15:40:56 +08:00
overtrue 007c3b204b Merge remote-tracking branch 'origin/gateway/integration' into gw/T2.1-adapter-foundation 2026-11-11 15:40:56 +08:00
overtrue 1c3fe4747e refactor(server): box the route facts a deferred question carries
A question the table answers by itself is one byte; one that asks the core carries the request facts. Boxing them keeps the common, decided case small.
2026-11-11 15:00:12 +08:00
overtrue 032566507a test(auth): report every decision mismatch in the parity matrix 2026-11-11 14:35:50 +08:00
overtrue 42ab123d69 Merge remote-tracking branch 'origin/gateway/integration' into gw/T2.5-gateway-stack 2026-11-11 14:25:05 +08:00
overtrue 22f6c668da feat(server): wire the owned authorization core into the gateway stack
The route stage's decision core is now the owned authorization entry point: a RouteDecidable row resolves the caller with the function the legacy access check uses and asks authorize_owned_request about the request as it arrived. The host attaches the request line for it, since the gateway hands an authorizer the headers and the query but neither the method nor the target. A core that cannot answer stays Indeterminate.

The gateway stack refuses to start while Keystone is enabled: the pinned gateway admits a request that carries only X-Auth-Token as anonymous, while the RustFS code behind it reads the Keystone identity (rustfs/gateway#1586).

The embedded tests now observe the S3 request counter through the whole stack: one served ListBuckets is counted once under the label the legacy stack uses, and a request refused by authentication once under no operation. The two tests that pin how a failed credential lookup is answered name ledger entry R-068 and rustfs/gateway#1585.
2026-11-11 14:24:59 +08:00
overtrue 9829661a98 Merge remote-tracking branch 'origin/gw/T1.8-access-envelope' into gw/T2.5-gateway-stack
# Conflicts:
#	rustfs/src/storage/access.rs
#	rustfs/src/storage/storage_api.rs
2026-11-11 14:23:10 +08:00
overtrue ee3ef73630 test(gateway): pin how the gateway answers an unavailable credential backend
The pinned gateway's SigV4 authenticator answers a credential provider fault exactly as an unknown access key, so an unavailable IAM or a withdrawn root is 403 InvalidAccessKeyId, not a 5xx as on the legacy stack. The two tests asserted the 5xx this stack cannot answer; they now pin the observed refusal and that nothing is served, and the root rotation test checks the new key is known to the next request.
2026-11-11 13:48:59 +08:00
rustfs-cla-assistant[bot] 4c7cc8a943 Merge remote-tracking branch 'origin/main' into gateway/integration 2026-11-11 05:25:16 +00:00
overtrue 42ee5b151b test(auth): satisfy clippy on the parity test facade 2026-11-11 13:12:38 +08:00
overtrue 3cda284b4c test(auth): owned and legacy entry points reach the same decisions
Decision-level parity over IAM allow and explicit deny, owner, anonymous on private and public buckets, bucket-policy explicit deny, aws:SourceIp from the peer and from a verified client, and one allow and one deny per body-derived input (legal hold, tagging, retention mode and retain-until, resolved copy source, POST form fields).
2026-11-11 12:36:59 +08:00
overtrue fb053dfb85 test(auth): read storage-private parity facts through test accessors
The parity tests moved to the app layer can no longer read ObjectTagConditions and TableDataPlanePublicationGuards fields directly; parity_test_support exposes read-only accessors instead. Drop an unused import.
2026-11-11 12:32:50 +08:00
overtrue 9707aa4f1f ci(gateway): lint and test the gateway stack on every code change
The gateway-stack feature leg becomes its own job on the pull-request path and joins the Test and Lint aggregate, instead of a leg of the nightly-only feature matrix. Operation slices put their handler tests, their authorization census and their end-to-end refusal tests behind the feature, so a leg that ran only on dispatch would let them rot.

The job set changed, so the plan contract marker moves to 4: a plan from a base planner that predates this job is refused and the full matrix runs.
2026-11-11 12:23:02 +08:00
overtrue 197e682488 refactor(server): install the IAM adapters as one pair
The adapter crate now installs its credential provider and policy source together through IamAdapters::install, and takes the live root as a closure. The assembly passes a closure over the root credentials the legacy stack reads, and keeps refusing a missing or too-short configured root.
2026-11-11 12:09:55 +08:00
overtrue 0e0744cb49 Merge remote-tracking branch 'origin/gw/T2.1-adapter-foundation' into gw/T2.5-gateway-stack 2026-11-11 12:08:08 +08:00
overtrue 20872bba63 fix(gateway-adapter): effective secret length and unsplittable pair
Address the confirmation review of the T2.1 adapters
(rustfs/backlog#2760).

- One rule for every secret: its length after trailing NUL bytes are
  removed must be at least MIN_SECRET_KEY_LEN. HMAC zero-pads its key,
  so trailing NULs add nothing; interior NULs count. Applied to the root
  secret, the STS signing key and every looked-up credential.
- IamAdapters keeps both halves private and hands them to a builder
  together through the consuming install(builder, make_authenticator);
  compile-fail doctests show a mixed pair cannot be assembled.
- Any Fn() -> Option<Arc<RootCredentials>> is a RootSource, so the
  binary reads its live root accessor directly; RootCell is now a
  test-only helper.
2026-11-11 12:06:45 +08:00
overtrue 30d8aee534 feat(server): read the live root for the gateway stack on every request
The assembly builds both adapters over one live root source that reads the root credentials where the legacy stack reads them, per request, so a root change reaches both stacks at once. A missing or too-short configured root fails the assembly instead of starting a server without a root.
2026-11-11 11:55:23 +08:00
overtrue 05e6fd2085 Merge remote-tracking branch 'origin/gateway/integration' into gw/T2.5-gateway-stack 2026-11-11 11:52:39 +08:00
overtrue 3f861328d8 Merge remote-tracking branch 'origin/gw/T2.1-adapter-foundation' into gw/T2.5-gateway-stack 2026-11-11 11:52:39 +08:00
overtrue 210e1b214e fix(server): keep the empty Buckets element on the legacy ListBuckets
The compatibility seam writes a listing without buckets as an absent member, where the legacy edge has always answered an empty element. Clients index the answer by it, so the legacy edge restores it. Also drops a re-export the removed legacy output builder was the last user of.
2026-11-11 11:52:39 +08:00
Chris An 55d931353f ci(s3-tests): add reference parity lane against pinned 1.0.5 (#9288) 2026-11-10 22:50:17 -05:00
overtrue 0e1e2e0003 fix(gateway-adapter): share live root and refuse short secrets
Address the security review of the T2.1 adapters (rustfs/backlog#2760).

- Add RootCredentials (validated: root secret and STS signing key at
  least MIN_SECRET_KEY_LEN bytes), the RootSource trait and the settable
  RootCell. IamAdapters::new is now the only constructor of
  IamCredentials and IamPolicySource, so both read one live root source
  per request; no root source answers unavailable.
- A looked-up identity whose secret is shorter than 8 bytes is NotFound
  in the credential provider and DISABLED_PRINCIPAL in the policy
  source, whatever the lookup reports as valid.
- STS claims are read with the STS signing key from the root source
  instead of assuming it equals the root secret.
- Cover the off-status-alone branch, the OIDC owner exclusion, service
  accounts of root, the name live groups are read under, and another
  session's token.
2026-11-11 11:36:11 +08:00
overtrue b3e60a8882 test(auth): move owned parity tests to the app layer
Owned-versus-legacy parity, hoist and fail-closed tests now live in app/owned_authorization_test.rs beside the envelope's facts impl, so storage names no app type in test code either. Private storage steps are reached through a test-only parity_test_support module. Also fix the S3Error conversion CI reported in prepare_owned_authorization.
2026-11-11 11:26:52 +08:00
overtrue e6a1f542a1 Merge remote-tracking branch 'origin/gateway/integration' into gw/T1.8-access-envelope
# Conflicts:
#	.config/test-count-baseline.txt
2026-11-11 10:59:13 +08:00
overtrue 662781e45b Merge remote-tracking branch 'origin/gateway/integration' into gw/T2.5-gateway-stack 2026-11-11 10:59:06 +08:00
overtrue 7aceffc68c ci(gateway): keep gateway-stack out of release builds and lint it
The gateway stack refuses to compile without debug assertions, and a static guard keeps the feature, and any feature that enables it, out of the default and full feature lists and out of every release input. The feature matrix gains a gateway-stack leg for its lints and tests.
2026-11-11 10:58:56 +08:00
overtrue e0b53cc8d9 feat(server): serve ListBuckets on the gateway stack behind a feature
With the gateway-stack feature built in and RUSTFS_S3_STACK=gateway, the S3 service under the middleware is the rustfs-gateway service: the RustFS profile, SigV4 verification against RustFS IAM, an authorizer backed by an explicit per-operation table, explicit deadlines, and one registered handler. Every other S3 operation is answered 501, and admin, console, STS, health and profiling routes stay on the legacy router until they are migrated.

The stack is selected once at startup. An assembly failure fails startup, and a binary without the feature keeps refusing the selection.
2026-11-11 10:58:56 +08:00
overtrue db370e3241 refactor(app): move ListBuckets use case onto the request envelope
The use case takes a RequestEnvelope and the gateway's ListBucketsInput and returns the gateway's ListBucketsOutput, so both S3 stacks call one implementation. The legacy s3s method converts through the compatibility seam and calls it.

The per-request part of the legacy access check (caller resolution, the upload-size capability scoping and the license check) moves into two functions over owned facts, which the legacy check now calls and the gateway handlers will call too.
2026-11-11 10:58:56 +08:00
overtrue ffe6bc86d3 fix(auth): keep owned authorization in the app layer and fail closed
Move the RequestEnvelope impl of AuthorizationRequest and the owned entry points into the app layer so storage depends only on the request-facts trait (layer guard). The owned entry points now hoist signed x-amz-meta-* query parameters like the legacy edge and refuse actions whose decision needs a request-body input the envelope does not carry. Revert unrelated TODO rewording and redact PostObjectPolicyHeaders debug output.
2026-11-11 10:53:07 +08:00
Chris An fc09148f08 chore(gateway): record ignored microbenchmarks merged from main (#9290)
chore(gateway): record the ignored microbenchmarks merged from main

main added three throughput microbenchmarks that are ignored by design
(#9217): one each in rustfs-checksums, rustfs-rio and rustfs-utils. The
test-count ratchet treats a higher ignored count as a failure until the
row is raised, so raise those three rows to 1 and tighten the test rows
to the merged tree with --update.
2026-11-10 21:30:34 -05:00
rustfs-cla-assistant[bot] c9e1464a2a Merge remote-tracking branch 'origin/main' into gateway/integration 2026-11-11 02:06:08 +00:00
overtrue 5d6358a0a5 Merge remote-tracking branch 'origin/gateway/integration' into gw/T2.5-gateway-stack 2026-11-11 09:58:48 +08:00
Chris An 0e3028d29e ci(gateway): make the test-count ratchet a floor, not exact (#9278)
ci(gateway): make the test-count ratchet a floor instead of an exact baseline

Tests below a row still fail; tests above it, a member without a row and ignores below the row now pass with a note. Ignores above a row still fail. Adds contract tests wired into make script-tests.
2026-11-10 20:53:06 -05:00
overtrue dde2169c83 feat(gateway-adapter): add IAM-backed PolicySource
Add IamPolicySource, the gateway PolicySource answered by RustFS IAM
(rustfs/backlog#2760, policy half). One snapshot per request carries a
RustfsPrincipal: principal kind, account, effective username, parent
user, credential groups, live group memberships, token claims and
is_owner.

- Anonymous callers get an empty snapshot without asking IAM.
- IAM not ready, not initialized or failing is PolicyError::unavailable,
  never an empty snapshot.
- Unknown, disabled and session-kind-mismatched principals are refused
  with constant labels; unreadable tokens are malformed.
- Claims are read from the stored token (root secret for STS, the
  account's own secret for service accounts), and is_owner mirrors the
  legacy has_root_access rule.
- RustfsPrincipal holds no secret or session token and has no Debug.
2026-11-11 09:43:47 +08:00
overtrue 0b586c37e9 refactor(auth): share authorization core with owned entry points
Extract the policy decision behind authorize_request into a core that both the legacy s3s request and the RustFS-owned RequestEnvelope feed, and move the zip-create and table-catalog admin callers to the owned entry points (authorize_owned_request, authorize_owned_internal_object_request). Request-body policy inputs added on main since the candidate base (POST form headers, copy source, legal hold and tagging bodies) become named envelope fields so both edges reach the same decision. Refs rustfs/backlog#2749.
2026-11-11 09:40:02 +08:00
Chris An 365014a385 feat(scripts): add junit_diff.py for dual-stack JUnit comparison (#9275) 2026-11-10 19:55:24 -05:00
overtrue 7946b094f9 feat(gateway-adapter): add IAM-backed CredentialProvider
Add the ring-2 crate rustfs-gateway-adapter with IamCredentials, the
gateway CredentialProvider answered by RustFS IAM (rustfs/backlog#2760,
credentials half; PolicySource is deferred).

- Pin rustfs-gateway at the existing gateway rev with
  default-features = false so the server crate stays out of the build.
- IamKeyLookup is a narrow IAM trait implemented for IamSys so the
  adapter is testable without an in-memory IAM backend.
- Root credentials are injected at construction and resolve before IAM
  is ready.
- Mapping: keystone: prefix -> NotFound (deliberate change from the
  legacy empty secret); IAM not ready or not initialized -> Unavailable;
  unknown key or NoSuch{User,ServiceAccount,TempAccount,Account} ->
  NotFound; other IAM errors -> Backend; invalid or "off" principals
  resolve disabled; STS credentials carry a SessionBinding, and an STS
  credential without an expiry is a Backend fault rather than a
  never-ending session.
- No authorization in lookup; no Debug on secret-holding types; IAM
  error text is dropped after classification.
2026-11-11 07:19:17 +08:00
overtrue 443e8afee1 chore(gateway): merge main into integration
# Conflicts:
#	crates/ecstore/src/disk/local/delete_recovery.rs
#	crates/ecstore/src/store/bucket.rs
2026-11-10 21:40:26 +08:00
overtrue 782e3e5209 chore(gateway): merge main into integration 2026-11-10 08:28:05 +08:00
overtrue cfffb1700e chore(gateway): update test-count baseline after main sync
Main #9241 removed the node pool-metadata readiness cache with 8 tests
and added 6, so the rustfs row drops from 6440 to 6438. The ecstore and
s3select rows rise for tests added by #9237, #9239 and #9241.
2026-11-09 10:21:53 +08:00
rustfs-cla-assistant[bot] cd62f3ba4f Merge remote-tracking branch 'origin/main' into gateway/integration 2026-11-09 02:07:05 +00:00
overtrue 7bc419e368 chore(gateway): merge main into integration
# Conflicts:
#	.config/e2e-full-selection.txt
#	crates/ecstore/src/disk/local/delete_recovery.rs
2026-11-09 00:50:02 +08:00
overtrue 7269243de7 chore(gateway): merge main into integration
Port main's changes into integration's relocated code: the XML compatibility
body bound and presigned-guard tests into legacy_compat, the policy-condition
fixes (#9150, #9159, #9163) into auth facts and the owned admin request API,
and record native publications on main's new fused delete-recovery paths.
2026-11-08 22:26:59 +08:00
overtrue c4a7423f99 fix(ecstore): create parents before admitted truncate opens
Align the heal tests with removal-disabled preservation and local-only outcome
fields, and refresh the e2e-full selection for the synced tests.
2026-10-31 08:38:51 +08:00
overtrue 2db4ed244a fix(ecstore): scope the merged direct-writer test hook to test builds 2026-10-31 06:40:49 +08:00
overtrue 93a61df1cf chore(gateway): merge main into integration
Keep native publication recording in main's native_io helpers and resource
writers, and adapt merged tests to the owned Body, Bytes write input, and
fallible find_disk.
2026-10-31 06:15:49 +08:00
overtrue feec0e9e4a test(s3select): use the owned JSON input types in merged planner tests 2026-10-31 03:08:13 +08:00
overtrue 38baeeb11d chore(gateway): merge main into integration
Record native publications on the paths main's commit-fusion work opened
directly: the lazy truncate writer and the fused delete-recovery activation
and receipt renames. Keep extract_params_header in the shared audit builder.
2026-10-31 01:40:30 +08:00
overtrue 1af039c972 chore(gateway): merge main into integration 2026-10-30 20:14:52 +08:00
overtrue a2fc7c13b4 chore(gateway): merge main into integration 2026-10-30 18:41:32 +08:00
overtrue dbe01e5cb1 chore(gateway): raise test-count rows for tests merged from main 2026-10-30 14:35:18 +08:00
overtrue ffc27fa6db chore(gateway): merge main into integration 2026-10-30 14:29:25 +08:00
overtrue 7e8edab0d3 chore(gateway): merge main into integration 2026-10-30 11:23:05 +08:00
overtrue 22057ad4c5 chore(gateway): merge main into integration 2026-10-30 07:08:33 +08:00
overtrue 279a88ab56 chore(gateway): merge main into integration 2026-10-29 20:19:36 +08:00
overtrue b4abe64ada chore(gateway): merge main into integration
Sync main 84e24e767 into gateway/integration. Ports main-side additions to
the integration boundaries: the tier deletion diagnostics admin handlers move
to the owned admin request/response types, and the new lifecycle rule checks
in ecstore use the persisted lifecycle types instead of s3s DTOs. Keeps the
gateway git source in deny.toml while dropping the smithy-rs pin main retired,
and refreshes the test-count baseline for the merged tree.
2026-10-29 16:01:13 +08:00
overtrue add363f084 chore(gateway): merge main into integration
Sync main 9601a7c4b into gateway/integration. Ports main-side additions to the
owned admin boundary (plugin delegation/attempt handlers, notification target
edit tests), drops a new ecstore s3s::dto reference in favour of the persisted
lifecycle filter, and refreshes the e2e selection digests and test-count
baseline for the merged tree.
2026-10-29 07:31:24 +08:00
overtrue 1f2dbe36e5 test(ecstore): pin native history on cancellation under the cancellable queue
main moved the local write path onto the disk blocking queue, which skips an
operation once its waiter is dropped, so a borrowed write cancelled while it is
queued no longer creates its file. The integration-only native publication
test still expected the queued open to run. Assert the new execution model
instead (the open never runs) while keeping its safety claims: the Started
record is taken before queueing and the cancelled publication never regrants
native history.
2026-10-27 22:08:04 +08:00
overtrue 67fbafa13e chore(gateway): merge main into integration
Source: main 4e48c390e7
Target: gateway/integration 1000860cb8

Conflicts resolved, keeping both sides:
- crates/ecstore/src/disk/{fs,local}.rs: main's batched rollback writes,
  unified blocking write path and relocated open_file, with integration's
  native publication records restored at each publication point and the
  publication_history field kept beside main's multipart proof authority.
- crates/ecstore/src/set_disk/ops/multipart.rs: union of the imports.
- rustfs/src/storage/rpc/node_service.rs: main's MRF lifecycle reader
  capability branch; the heal capability keeps integration's restore
  copy-back probe.
- rustfs/src/admin/handlers/{audit,event,plugins_instances}.rs: main's
  target_read inventory snapshot on integration's owned request boundary;
  the new event.rs inventory test now builds owned requests.
- scripts/check_s3s_footprint.sh: integration's baseline-file version.
- .config/e2e-{full,smoke}-selection.txt: digests recomputed over the
  union of both heads' CI listings (full 700 darwin / 708 linux, smoke 232).

Also migrated main's new rebalance delete-all expiry test to the persisted
lifecycle types integration uses in ecstore, and raised the test-count
baseline to the merged counts (every decrease comes from main).
2026-10-27 08:38:17 +08:00
Chris An 1000860cb8 refactor(admin): drop the legacy target descriptor JSON response helper (#8968)
`target_descriptor::build_json_response` returned the s3s response and
had no production caller left once the event, audit and plugin instance
handlers moved to `owned_build_json_response`; it survived only for the
legacy/owned equivalence test. Remove it, give the owned helper its own
documentation, and make the test assert the owned response directly:
status, `application/json`, the echoed `x-request-id` when present and
only then, and the body bytes. The file no longer imports s3s, so the
footprint baseline drops from 66 to 65 files.
2026-10-27 00:15:37 +08:00
Chris An b783f404ad refactor(admin): migrate identity and cluster handlers to owned requests (#8966)
* refactor(admin): migrate identity and cluster handlers to owned requests

Move the T1.12 batch 4 admin handlers (user, service_account, oidc, tier,
system, pools, quota, kms_dynamic, kms_backup, rebalance, module_switch,
bucket_meta, cluster_snapshot, realtime, bucket_recovery, profile) from the
s3s request/response types to the owned AdminRequest/AdminResponse
boundary. All 90 impl Operation blocks now take AdminRequest and return
AdminResponse; handler logic, authorization order, error codes and response
bytes are unchanged. The handlers use the shared owned helpers
(owned_json_response, owned_admin_json_response, authorize_profile_envelope,
the envelope-form runtime sources and audit constructors) instead of local
copies.

profile.rs drops the s3s forms of authorize_profile_request and
profile_not_implemented_response now that profile_admin.rs is on the
envelope gate too; profile_not_implemented_response answers with an
AdminResponse. The realtime metrics stream moves from the s3s ByteStream
adapter to Body::from_stream, and the rebalance idle-404 document still
renders through s3s::S3Error::to_http_response with its body converted at
the edge.

The idp_compat delegators ImportIamV2 and AddServiceAccountLdap move to the
owned trait as well: with their targets on both traits, the method-call
delegation became ambiguous between the owned impl and the router blanket
impl, so they now take the owned request directly.

KmsAdminAudit::from_request loses its last production caller with this batch
and is deleted; its comparison test now asserts the envelope facts directly.

Lower the s3s footprint baseline to the measured 68 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): remove the legacy admin helpers batch 4 superseded

Batch 4 moved the last production callers of the s3s-typed admin helpers
to their owned forms, which left `admin_json_response`, `json_response`,
`authenticate_request`, `authorize_admin_request`, `object_store_from_req`
and `object_store_from_extensions` unused, along with the `Body`,
`S3Request` and `S3Response` re-exports of the admin `s3` facade. Remove
them. The owned forms keep their documentation; the behavior tests of the
removed `json_response` now exercise `owned_json_response`, and the
compat-prefix test asserts the owned response directly.

Two tests existed only to compare a removed legacy helper with its owned
twin (`owned_json_response_matches_the_legacy_shape`) or to cover the
removed legacy gate (`authorize_admin_request_without_credentials_is_rejected`);
they go with the helpers, and the owned equivalents stay. The rustfs
test-count row drops from 5957 to 5955 and the s3s footprint from 68 to 66
files.
2026-10-26 22:23:47 +08:00
Chris An 11a991c777 refactor(admin): complete the owned admin request boundary (#8949)
* refactor(admin): complete the owned admin request boundary

Every type implementing the owned admin `Operation` now serves the legacy
router through one blanket impl that converts the s3s request and response
at that single edge, so handlers register with `AdminOperation(&Handler {})`
and need no adapter statics; `LegacyAdminAdapter` is removed.

`AdminRequest` gains the accessors handlers read today (`remote_addr`,
`client_info`, `request_context`, `req_info`, `req_info_mut`,
`install_req_info`, `envelope_mut`, `take_body`), the request helpers gain
envelope forms (`authenticate_envelope_credentials`,
`object_store_from_envelope`, the table-catalog `*_from_envelope` helpers,
`KmsAdminAudit::from_envelope`, `AccountAuditContext::from_envelope`,
`CallerIdentity::resolve_envelope`), `read_compatible_admin_body` accepts
either body type, and the owned `Body` gains `store_all_limited` and
`Default`. `admin::operation::test_support::TestRequest` builds owned
requests for handler tests. Unused accessors carry a per-method dead-code
expectation that each migrating handler batch removes.

No handler behavior changes; the remaining migrations follow in batches.

* chore(admin): add the T1.12 admin handler codemod

The script rewrites an admin handler file from the s3s request and response
types to the owned boundary (imports, signatures, request field and helper
calls, body access, response construction, and test request literals) and
leaves a TODO comment at every site it cannot rewrite mechanically. It is
idempotent and is removed once T1.12 completes.

* refactor(admin): migrate replication and KMS handlers to owned requests (#8951)

Move the T1.12 batch 2 admin handlers (site_replication, kms_keys, event,
replication, diagnostics, on_demand_migration, audit, account, kms_rekey,
kms_key_lifecycle, object_data_cache, tls_debug, integrity) from the s3s
request/response types to the owned AdminRequest/AdminResponse boundary.
Handler logic, authorization order, error codes and response bytes are
unchanged; the request/response plumbing now goes through the envelope
accessors and helpers introduced by the owned boundary.

The shared response helpers (utils::json_response, utils::empty_response,
handlers::admin_json_response, target_descriptor::build_json_response,
profile::authorize_profile_request) and the site replication repair
executor still answer with the s3s types, so the migrated files carry
owned-boundary forms of those helpers and convert the repair response at
its call edge. The streaming console-log body and the two devnull drains
move from the s3s byte stream to the owned Body stream/frame API.

Drop the dead_code expectations for the owned accessors and envelope
helpers this batch starts using, and lower the s3s footprint baseline to
the measured 99 files.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* refactor(admin): add owned forms of the shared admin response helpers

Handler batches were copying `json_response`, `empty_response`,
`admin_json_response`, and `build_json_response` into each migrated file
because the shared helpers still return the s3s response. Provide owned
forms next to each legacy helper (`owned_json_response`,
`owned_empty_response`, `owned_admin_json_response`,
`owned_build_json_response`, `authorize_profile_envelope`) with parity
tests against the legacy shape, derive `Debug` for `AdminResponse` so
tests can use `expect_err`, and fix three codemod rules: strip owned
string conversions in test credentials, annotate non-literal URI parses,
and leave a rebound request parameter immutable.

* refactor(admin): use the shared owned response helpers in batch 2 (#8954)

Replace the per-file owned-boundary copies of json_response,
empty_response, admin_json_response, build_json_response and
authorize_profile_request in the batch 2 admin handlers with the shared
owned_* helpers and authorize_profile_envelope that the boundary branch
now provides, and restore expect_err in the handler tests now that
AdminResponse implements Debug; the `.err().expect(..)` stand-ins were
failing the base branch's clippy step (clippy::err_expect under
-D warnings). The site replication repair call edge
keeps its conversion because the repair executor still answers with the
s3s response type.

Drop the dead_code expectations on the shared owned helpers this batch
now uses in non-test code.

Part of rustfs/backlog#2788 (rustfs/backlog#2734 T1.12).

* fix(admin): preserve legacy body limit error responses

* refactor(admin): move policy, ILM and batch 3 handlers to owned requests (#8956)

Batch 3 of T1.12 (rustfs/backlog#2788, parent rustfs/backlog#2734) moves
14 admin handler files to AdminRequest/AdminResponse and the owned
Operation trait: ilm_transition, policies, idp_compat, config_admin,
plugins_instances, profile_admin, group, heal, object_zip_download,
kms_key_metadata, durability, inspect_archive, sts and
gateway_key_inventory. Handler logic, authorization order, error codes
and response bytes are unchanged; test request literals use
test_support::TestRequest.

The handlers use the shared owned helpers (owned_json_response,
owned_admin_json_response, owned_build_json_response,
authorize_profile_envelope). The dead_code expectations on the
AdminRequest accessors and RequestEnvelope::uri_mut they now exercise
are removed. The legacy target_descriptor::build_json_response keeps
only its equivalence test caller and carries the matching expectation
until it retires.

object_zip_download builds the s3s request the S3 gate still reads from
the owned request facts; heal authenticates through
authenticate_envelope_credentials; the trace, inspect-archive and zip
bodies use Body::from_stream. extract_plugin_instance_filters takes the
URI so extensions.rs keeps calling it, and the two idp_compat
delegations stay on the legacy trait until their delegates migrate.

The s3s footprint baseline drops from 99 to 90 files.

* test(admin): anchor the replication diff body contract on the call

The source-contract test looked for `let body = read_compatible_admin_body(`
on one line; rustfmt wrapped that binding after the handler moved to the
owned request boundary, so the marker was no longer found. Anchor on the
call itself so formatting cannot change what the contract checks.

* refactor(admin): migrate table catalog and batch 1 to owned requests (#8955)

* fix(admin): preserve catalog body limit response bytes
2026-10-26 17:04:02 +08:00
Chris An 3f2b6f690a refactor(admin): migrate health and prefix usage to owned requests (#8887)
* refactor(admin): add owned health router boundary

* refactor(admin): migrate prefix usage to owned request
2026-10-26 07:34:31 +08:00
overtrue 88b626e7a0 chore(gateway): merge main into integration
Source: main 0f24511535
Target: gateway/integration 8cf6187ff4

Resolve the e2e-full selection digest conflict by recomputing both
platform digests over the merged nextest listing (685 darwin / 693
linux): main adds two rpc_fault_proxy unit tests, integration keeps its
dual-stack differential and anonymous-access additions. Raise the rustfs
test-count baseline row to the merged count (5932).
2026-10-25 09:58:02 +08:00
overtrue 8cf6187ff4 chore(gateway): merge main into integration 2026-10-25 01:50:03 +08:00
Chris a0a0cee9eb refactor(auth): derive policy conditions from AuthzFacts (#8442)
* refactor(auth): extract authorization facts

* test(e2e): update smoke selection baseline

* test(e2e): update full selection baseline
2026-10-24 16:56:01 +09:00
overtrue 80fff4b5c5 Merge gateway/integration (#8844) into the main sync
Only the s3s footprint baseline conflicted; s3_error_lines tightens to 289.
2026-10-24 09:30:22 +08:00
Chris d91dfcedd2 refactor(s3): migrate private multipart validation errors (#8844) 2026-10-24 09:17:48 +09:00
overtrue 79c4fedf8c Merge gateway/integration into the main sync
Brings in #8825, #8831, #8836 and #8839. Conflicts were import lists and test blocks (both sides kept), plus the new restore_copyback request flag next to main's data-movement field. Main replaced completed_multipart_object_part with prepare_complete_multipart_parts, so the stale import is dropped.

Main's xl.meta fast-path scanner (inspect_v2_object_slice) predates #8836 and classified a transitioned version with a pending v1 restore copyback as having no physical data dir, which made find_unshared_data_dir_for_version drop the copyback data dir. The scanner now reads the copyback marker with get_consistent_bytes semantics (both aliases, ASCII case-insensitive, empty or conflicting values count as absent), and uses_data_dir keeps main's allocation-free transition check plus #8836's copyback exclusion. find_unshared_data_dir_for_version_keeps_pending_copyback_data_dir failed on the plain merge and passes now.
2026-10-24 07:51:55 +08:00
Chris 73c846e09c refactor(storage): migrate option errors to domain types (#8839) 2026-10-24 05:50:10 +09:00
Chris 6938c467d0 fix(ecstore): finalize restore metadata after local copy-back (#8836)
* fix(ecstore): finalize restore metadata after local copy-back

* test(ecstore): ratchet added restore finalization cases

* fix(ecstore): keep restore copyback compatible with older peers

* fix(ecstore): gate restore copyback on fleet compatibility

* fix(ecstore): retain transition identity during restore copyback

* fix(ecstore): route committed restore copyback locally

* fix restore copyback cleanup

* fix(ecstore): honor restore probe test fallback
2026-10-24 02:34:29 +09:00
Chris 5323df7049 fix(protocols): clear clippy failures after T1.5 merge (#8831)
fix(protocols): clear clippy failures after merge
2026-10-23 17:37:26 +09:00
Chris 55b6fbd260 refactor(protocols): move StorageBackend to gateway types (#8825)
* refactor(protocols): move storage backend to gateway types

* test: update e2e test count baseline

* fix: preserve copy source keys and unknown lengths

* test: update protocols test count baseline

* fix(protocols): preserve typed SFTP backend errors

* test(protocols): use gateway list input in policy tests
2026-10-23 15:46:28 +09:00
overtrue dd677cc121 Merge main into gateway/integration
Picks up main through 44a73b0be. Conflicts: rustfs/src/error.rs keeps the rustfs-s3-types ApiError conversion and drops the helper main's #8816 replaced; scripts/check_s3s_footprint.sh keeps the integration script, whose baseline lives in .config (main only retuned a constant the integration script does not have). Main's new tests use the rustfs-s3-types error code in admin replication and reach s3s::BodySizeLimitExceeded through the app's test-only s3 facade, so the s3s file count stays at 118; s3_error_lines tightens to 302. The test-count baseline is regenerated; the e2e selections are unchanged.
2026-10-23 08:40:02 +08:00
overtrue 0c2f327974 Merge gateway/integration into the main sync
Brings in #8812 and #8818 from gateway/integration. #8812 predates main's heal error classifier (#8778); its two retryable variants (TooManyOpenFiles, OutdatedXLMeta) move into the classifier's transient arms for storage and disk errors, and its test is kept.
2026-10-23 07:22:20 +08:00
overtrue df42cf1ce8 test(e2e): use a non-default region for the differential negative control
Since main's region-aware CreateBucket and GetBucketLocation (#8739, #8743), us-east-1 answers an empty LocationConstraint and 200 for an owned re-create, so the control no longer reported its own region. Also refresh the e2e-full linux selection from the CI listing (682 tests).
2026-10-23 07:21:19 +08:00
Chris d290d46b34 test: reserve nextest capacity for progress probes (#8818) 2026-10-23 06:12:31 +09:00
Chris 0d297ed8cd fix(heal): retry transient metadata conflicts (#8812)
* fix(heal): retry transient metadata conflicts

* chore: update heal test count baseline
2026-10-23 01:47:55 +09:00
overtrue b8dffa2f1d Merge main into gateway/integration
Picks up the 20 main commits since 62b6f5f3f. The one conflict is the tier free-version recovery test setup: it keeps the integration-only fixture isolation (background recovery disabled while the fixture starts) and main's mock tier registration (#8804 skips scans with no tier). The e2e selections are unchanged by these commits; the test-count baseline is regenerated.
2026-10-22 20:17:09 +08:00
overtrue 62b6f5f3fc Merge main into gateway/integration
The scheduled sync has stopped on conflicts since 2026-10-19. Resolved by keeping both sides: main's restructured delete-rollback path in disk/local.rs with the integration-only native-publication record, main's per-instance region with the rustfs-s3-types Region, main's new lifecycle, rebalance and admin code ported to the persisted lifecycle types and rustfs-s3-types errors, both sides' new scanner tests, and the union of the access_consumer imports. The e2e smoke, full (darwin) and repl-nightly selections and the test-count baseline are regenerated from the merged tree.
2026-10-22 10:14:41 +09:00
Chris be0986115c refactor(s3select): run queries on gateway DTO request shapes (#8794)
* refactor(s3select): run queries on an engine request built from gateway DTO shapes

Part of T1.5 (rustfs/backlog#2746), batch 2.

* fix(s3select): keep the select request conversion in the app layer

The layer guard forbids app -> storage; the conversion moves from storage/s3_compat/select.rs to app/select_request.rs unchanged.
2026-10-22 08:16:48 +09:00
Chris 1bd91c8dad refactor(s3-client): move remote error codes and DTO enums off s3s (#8783)
Part of T1.5 (rustfs/backlog#2746), batch 1.
2026-10-22 06:15:04 +09:00
Chris dcb22bd4d5 refactor(ecstore): move bucket configs onto gateway persisted types (#8709)
* refactor(ecstore): move bucket configs onto gateway persisted types

Finish the ECStore batch of T1.4 (rustfs/backlog#2745). The remaining
eleven bucket configuration families (Website, CORS, Tagging, Versioning,
ObjectLock, Encryption, Notification, Logging, Accelerate, RequestPayment,
PublicAccessBlock) now read and write their stored XML through the
rustfs-gateway-types persistence and cors_tagging codecs instead of the
s3s codec, so the legacy s3s bucket-config codec and its
s3gate-metadata-xml compat marker are removed.

- ecstore: BucketConfigXml is implemented by the gateway codec for every
  family; metadata, metadata_sys, versioning, object lock, replication and
  lifecycle consumers take the persisted types. Region moves to
  rustfs_s3_types::Region, and the ETag conversion to s3s moves to the
  rustfs edge with its tests. Only warm_backend.rs and warm_backend_s3.rs
  still reference s3s, held for T1.5 (rustfs/backlog#2746).
- scanner: object lock cache, item actions and data usage use the
  persisted types.
- rustfs: the legacy S3 edge converts each family between s3s DTOs and the
  persisted types in storage/storage_api.rs by writing one codec's XML and
  reading it with the other; Tagging converts field by field.
- Bump the rustfs-gateway-types pin to 21283e87.

The 39 persisted-byte goldens are unchanged and pass, so a document the
old codec wrote reads back and re-encodes to the same bytes. s3s footprint:
files 181 -> 146, ecstore_files 28 -> 2, s3_error_lines unchanged.

* test(app): prepare the PutBucketEncryption config from the request

The uninitialized-store test passed an empty persisted configuration, which the use case now validates before it reaches the store check, so it answered MalformedXML instead of InternalError. Convert the request's configuration the way the S3 edge does.

* style(app): format the PutBucketEncryption test
2026-10-21 23:51:23 +09:00
Chris fa17718444 refactor(admin): move error types to rustfs-s3-types (#8440)
* refactor(protocols): move error types to rustfs-s3-types by codemod

T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).

* refactor(admin): move error types to rustfs-s3-types (WIP, no build)

T1.2 batch 4 (rustfs/backlog#2743), work in progress: rustfs check
still fails with 16 errors (listed in the PR body).

- codemod: --facade PATH treats a crate-local re-export of s3s's error
  items like s3s for the four names (9 new self-tests, 9 mutants red).
- codemod output for rustfs/src/admin and rustfs/src/site_replication
  (--facade crate::storage_api::site_replication::s3); 6 glob children
  get an explicit rustfs_s3_types::s3_error import.
- admin/router.rs: the Operation trait returns rustfs_s3_types::S3Result.
- error.rs: From<ApiError> builds the rustfs-s3-types error; the s3s
  conversion is derived from it.

* fix(admin): convert error types at the s3s boundary

Batch 4 of T1.2 left the admin and site_replication modules returning
rustfs_s3_types::S3Error while their callers and callees on the storage
and auth side still speak s3s::S3Error. Convert at each edge with the
existing From impls in rustfs-s3-types (compat_s3s.rs) instead of
changing any code, message or status:

- admin/auth.rs, admin/handlers/object_zip_download.rs,
  admin/handlers/table_catalog/mod.rs: map the s3s result returned by
  check_key_valid / authorize_request / authorize_internal_object_request
  into the admin error type with .map_err(Into::into).
- storage/ecfs.rs: the s3s-facing side maps the admin site_replication
  gate results the other way.
- admin/handlers/pools.rs: ApiError.code stays s3s::S3ErrorCode, so the
  rustfs code is converted with .into() when the struct is built, in
  production and in the two tests that build or compare it.
- admin/handlers/heal.rs, admin/runtime_sources.rs: the router returns
  s3s errors (S3Route impl); the expected rustfs code is converted with
  .into() before the comparison.
- admin/handlers/table_catalog/mod.rs: iceberg_rest_error takes
  &'static str so the Cow<'static, str> custom code borrows it; every
  caller already passes an ICEBERG_ERROR_* constant or a &'static str.
- admin/handlers/quota.rs: drop a now same-type .into() after s3_error!.
- storage_api.rs, site_replication/mod.rs: drop re-exports and an import
  that no longer have users (clippy -D warnings).

cargo check -p rustfs --all-targets and cargo clippy -p rustfs
--all-targets -- -D warnings are clean; the s3s footprint baseline is
unchanged at files=172, s3_error_lines=303, ecstore_files=28.

Refs rustfs/backlog#2743, rustfs/backlog#2734.
2026-10-21 22:50:27 +09:00
overtrue 99abffc57a refactor(lifecycle): replace s3s domain types with Gateway DTOs
Keep lifecycle rules, restore requests, Object Lock, and scanner cached tags in domain types. Convert at the existing HTTP boundary while preserving legacy XML, scanner cache bytes, date ordering, and tombstones.

Linux test validation before the final import-path-only adjustment:

cargo nextest run -p rustfs-ecstore bucket_config_goldens
39 passed; 6211 skipped by selector.

cargo nextest run --lib -p rustfs -E 'test(/test_zero_rule_lifecycle_tombstone_recognition/) | test(/test_local_lifecycle_staleness_axis_selection/) | test(/test_lifecycle_staleness_preserves_legacy_submillisecond_axis/) | test(/test_merge_incoming_lifecycle/) | test(/test_lifecycle_expiry_statement_matrix/) | test(/test_lifecycle_expiry_subset_xml/) | test(/put_bucket_lifecycle_validation_errors_keep_their_s3_code/) | test(/execute_put_bucket_lifecycle_configuration_rejects_missing_configuration/) | test(/execute_restore_object_rejects_missing_restore_request/) | test(/execute_restore_object_rejects_select_type/) | test(/execute_restore_object_maps_failures_to_typed_s3_errors/) | test(/execute_restore_object_returns_internal_error_when_store_uninitialized/) | test(/restore_request_conversion_preserves_legacy_output_values/) | test(/restore_request_conversion_preserves_presence_and_raw_enums/) | test(/restore_request_conversion_distinguishes_absent_and_empty_containers/)'
25 passed; 5318 skipped by selector.

cargo nextest run --profile ci -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-replication -p rustfs-scanner
7872 passed; 21 skipped under the existing CI profile.

Previously verified mutation controls: 39 production faults, 41 RED/GREEN pairs.

cargo clippy --locked -p rustfs -p rustfs-ecstore -p rustfs-lifecycle -p rustfs-scanner --all-targets -- -D warnings
Passed in 40m 45s before the import-path adjustment, then in 1m 59s on
the final source with warnings denied. The final adjustment imports the
existing helper through the object domain facade; fmt and the architecture
check also passed.

Part of rustfs/backlog#2745. The remaining ecstore configuration families follow separately.
2026-10-17 07:03:41 +08:00
overtrue fc061c7930 fix(ecstore): retry tier commit intent lock contention
Retry transient namespace lock timeouts within the existing three-attempt
CAS budget. Reload and verify the original mutation identity after
contention, and preserve the final typed error when attempts are exhausted.
Cover save/read contention, exhausted retries, replacement identities and
CAS reconciliation without changing the existing timeout or lock policy.

Validation:
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(tier_mutation)' --test-threads 1 --no-fail-fast: 52 passed.
- cargo nextest run --locked -p rustfs-ecstore --features test-util --lib -E 'test(intent_advance_) | test(=services::tier::tier::tests::caller_cancellation_after_durable_prepare_does_not_hide_the_mutation)' --test-threads 1 --no-fail-fast: 5 passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings: passed.
- cargo clippy --locked -p rustfs-ecstore --all-targets --features test-util -- -D warnings: passed.
- 27 mutation pairs failed at the intended assertions and passed after restoring the production code.
- bash scripts/check_test_count_ratchet.sh --update, then bash scripts/check_test_count_ratchet.sh: 52 crates, 22013 tests, 165 ignored; ecstore increases from 6581 to 6585.
2026-10-17 01:19:11 +08:00
overtrue d86bf1360f fix(ecstore): recover delete batches with missing versions
Treat an explicit non-null version as a no-op when it is absent from both recovery sources. Keep rejecting missing null versions, delete-marker mismatches and conflicting local generations.

Add returning-disk and partial-receipt regressions, extend journal boundary checks, and regenerate the ecstore test-count baseline. Production faults exercise the 24 added assertion sites and 7 semantic checks: 33 faults failed at the expected sites and passed after full restoration.

Validation (LANG=en_US.UTF-8, one build job):

cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(delete_recovery) | test(quorum_delete_cleanup_coordinator_binds_single_and_batch) | test(crash_delete_retry_batch_reclaims_inline_and_reserved_external)' --test-threads 1 --no-fail-fast
Summary [  34.580s] 69 tests run: 69 passed, 6058 skipped; exit 0

cargo clippy --locked -p rustfs-ecstore --all-targets -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 5m 37s; exit 0

All 19 final Quick Checks completed with exit 0:

- shellcheck --version && actionlint
- cargo fmt --all --check
- ./scripts/check_unsafe_code_allowances.sh
- ./scripts/check_layer_dependencies.sh
- ./scripts/check_architecture_migration_rules.sh
- ./scripts/check_logging_guardrails.sh
- ./scripts/check_error_other_format_ratchet.sh
- ./scripts/check_no_tokio_io_uring.sh
- ./scripts/check_extension_schema_boundaries.sh
- ./scripts/check_body_cache_whitelist.sh
- ./scripts/check_s3s_footprint.sh
- ./scripts/check_test_count_ratchet.sh
- ./scripts/check_fips_wording.sh
- ./scripts/check_embedded_secrets.sh
- make script-tests
- python3 ./scripts/test_object_generation_protocol_model.py
- python3 ./scripts/check_test_wiring.py
- ./scripts/check_no_planning_docs.sh
- ./scripts/check_uring_lane_lib_only.sh

test-count ratchet OK: 52 crates, 22009 tests, 165 ignored match .config/test-count-baseline.txt
PASS: cold stampede script self-test
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
multi-slot round schedules: 640
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
2026-10-16 17:32:35 +08:00
overtrue f6097d1df2 fix(ci): restore integration test compilation
Gate the diagnostic test import with its feature, initialize the conditional
MetadataWriteStore fields explicitly, and decode the scanner replication fixture
through its existing cache boundary. Preserve the original fixture and assertions.

Validation was run on tree 544acb80c0 at 6003d4b8.
LANG=en_US.UTF-8; no source changes follow validation.

Quick checks: 19/19 passed.
- shellcheck --version && actionlint: exit 0
- cargo fmt --all --check: exit 0
- ./scripts/check_unsafe_code_allowances.sh: exit 0
- ./scripts/check_layer_dependencies.sh: exit 0
- ./scripts/check_architecture_migration_rules.sh: exit 0
- ./scripts/check_logging_guardrails.sh: exit 0
- ./scripts/check_error_other_format_ratchet.sh: exit 0
- ./scripts/check_no_tokio_io_uring.sh: exit 0
- ./scripts/check_extension_schema_boundaries.sh: exit 0
- ./scripts/check_body_cache_whitelist.sh: exit 0
- ./scripts/check_s3s_footprint.sh: exit 0
- ./scripts/check_test_count_ratchet.sh: exit 0
- ./scripts/check_fips_wording.sh: exit 0
- ./scripts/check_embedded_secrets.sh: exit 0
- make script-tests: exit 0
- python3 ./scripts/test_object_generation_protocol_model.py: exit 0
- python3 ./scripts/check_test_wiring.py: exit 0
- ./scripts/check_no_planning_docs.sh: exit 0
- ./scripts/check_uring_lane_lib_only.sh: exit 0

Darwin validation:
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets -- -D warnings: exit 0
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries)' --test-threads 1 --no-fail-fast: exit 0, 2/2 passed
- cargo clippy --locked -p rustfs-ecstore -p rustfs-scanner --all-targets --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -- -D warnings: exit 101
- cargo nextest run --locked -p rustfs-ecstore -p rustfs-scanner --lib --features rustfs-ecstore/diagnostic-read-version-caller,rustfs-scanner/diagnostic-read-version-caller -E 'test(config::com::tests::save_config_preserves_retryable_system_volume_errors) | test(scanner_io::tests::replication_maintenance_refreshes_compacted_stats_across_cycles_and_retries) | test(cluster::rpc::runtime_sources::tests::) | test(config::com::tests::diagnostic_config_write_retains_origin_and_api_for_results_and_cancellation)' --test-threads 1 --no-fail-fast: exit 0, 14/14 passed

Diagnostic strict Clippy remains red on four unchanged production lints:
runtime_sources.rs if_same_then_else and three redundant_locals reports in
set_disk/core/metadata_read.rs and set_disk/read.rs. Their source ranges and
feature wiring match the base; the base was not compiled separately.

Linux aarch64 validation (Rust/Clippy 1.99.0, UID 501, jobs=1):
- cargo clippy --all-targets -- -D warnings: exit 0; Finished dev profile in 68m 12s
- cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings: exit 0; Finished dev profile in 49m 45s
Source HEAD/tree and clean status matched before and after both commands.
No compiler or stack overrides were used. protoc 35.1 was installed from its
verified ARM64 release; flatc was absent and not invoked by the workspace build scripts.
The local environment differs from hosted CI.
2026-10-16 13:06:24 +08:00
rustfs-cla-assistant[bot] 7e5d32eecf Merge remote-tracking branch 'origin/main' into gateway/integration 2026-10-16 02:09:53 +00:00
overtrue 72da0e21c4 chore: merge main into gateway/integration
Keep the migrated compatibility adapters in their active modules while bringing in upstream fixes. Preserve native publication history on the new create, rename and borrowed-open paths.

Validation:
- `cargo nextest run --locked -p rustfs-ecstore --lib -E 'test(disk::os::native_creation_history_tests::) | test(disk::local::test::borrowed_open_cancellation_retains_started_history_before_execution) | test(disk::local::test::owned_direct_child_open_attempt_consumes_native_history)' --no-fail-fast`: 9/9 passed after restoring all 12 mutation cases at cea78f2590645eb0d303cd7cf56f4dd0d9c00e87; these source blobs are unchanged in this merge.
- `cargo nextest run --locked -p rustfs-s3select-query --lib -E 'test(dispatcher::json_document_schema::tests::)' --no-fail-fast`: 5/5 passed at 5421ba682d1329cc7ebeaac7c6a863da2cea1996, with the same tree.
- `cargo fmt --all --check`: passed.
- `./scripts/check_test_count_ratchet.sh --update`: 52 crates, 22007 tests, 165 ignored.
- Profile baselines use seven actual Darwin listings and seven actual Linux listings.
- Earlier conflict snapshot f5e0cdf0c58aed1ebe53b9243cf52f94832ab049: `cargo nextest run --locked -p rustfs-ecstore -p rustfs --lib -E 'test(disk::os::) | test(bucket::metadata_sys::) | test(server::legacy_compat::) | test(server::layer::tests::request_logging_watchdog) | test(server::http::tests::conditional_object_http::) | test(storage::helper::tests::operation_helper)' --no-fail-fast` passed 218/218 before the borrowed-open fix. This is historical evidence.
2026-10-16 09:49:08 +08:00
Chris 78a0cf321c refactor(replication): move the replication config onto gateway types (#8443)
* wip: T1.4 replication family

* refactor(replication): move the replication config onto gateway types

The replication configuration family leaves s3s: rustfs-replication no longer depends on s3s, and ECStore bucket metadata, the scanner and the rustfs app/admin layers hold rustfs_gateway_types::persistence::PersistedReplicationConfiguration. The persisted XML goes through the gateway persistence codec behind a new BucketConfigXml trait (the 39 byte goldens pass with unchanged fixtures); the legacy s3s edge converts once in storage/ecfs.rs through storage/s3_compat/replication.rs; the scanner data usage cache keeps its MessagePack bytes through a serde mirror pinned by bytes recorded from s3s 5761ddfe. rustfs-gateway-types 0.32.0 is pinned once (rev 772d3385). Refs rustfs/backlog#2745.

* test: use S3 serializer for list response tests
2026-10-16 06:19:32 +08:00
overtrue cbe38a120f Merge main into gateway/integration
Merge frozen main acd26afd8b and include
compatibility fixes and measured Darwin/Linux membership corrections
across six files.

Validation on candidate b4c3ab560a:
- All 20 local gates passed.
- Native smoke: 218 passed. Native full: 661 passed.
- Full passed on the same-head failed-only rerun; the initial failure
  remains recorded.
- Gateway remains report-only: 38 passed, 180 failed, under the existing
  exemption.

CI: https://github.com/rustfs/rustfs/actions/runs/38285788334
2026-10-13 03:26:16 +08:00
overtrue db0828aa1c test(ecstore): isolate rollback guard loss fixtures
Run the three rollback metadata-cleanup cases in separate test processes so reused /proc/self/fd aliases from earlier cases cannot invalidate their creation witnesses. Keep the original fixture, guards, assertions and io_uring test selection, and verify that each child runs the intended case successfully.

Update the generated test-count baseline for the added macro arm.

Validation: cargo check -p rustfs-ecstore --tests; cargo fmt --all --check; all 19 quick-check commands, including make script-tests and the two Python checks. Linux io_uring acceptance and fault controls remain pending.
2026-10-12 00:42:51 +08:00
overtrue 3ca889b099 fix(ecstore): box nested bucket rollback state
Keep the guarded rollback future behind a heap allocation so bucket creation does not store its nested state inline. The rollback body, all three fence references and pending-proof revocation order are unchanged.

The same three original Linux tests overflowed on both e611 CI attempts. Local format, ecstore test compilation and all 19 quick-check steps pass; the original Linux feature lanes still need to validate this candidate.
2026-10-11 20:32:00 +08:00
overtrue e6112c526f fix(ecstore): retain creation fences through rollback
Keep lifecycle, metadata-transaction, and namespace guards around rollback and metadata cleanup. Preserve the original publication error when a guard is lost. Build the timestamp retry fixture through the real interrupted producer so it checks a valid pending creation.

Validated source tree: 4e8e207999.
Two independent source reviews found no blocking regression.

Validation (LANG=en_US.UTF-8):
- bash -c 'shellcheck --version && actionlint' — exit 0
- cargo fmt --all --check — exit 0
- ./scripts/check_unsafe_code_allowances.sh — exit 0
- ./scripts/check_layer_dependencies.sh — exit 0
- ./scripts/check_architecture_migration_rules.sh — exit 0
- ./scripts/check_logging_guardrails.sh — exit 0
- ./scripts/check_error_other_format_ratchet.sh — exit 0
- ./scripts/check_no_tokio_io_uring.sh — exit 0
- ./scripts/check_extension_schema_boundaries.sh — exit 0
- ./scripts/check_body_cache_whitelist.sh — exit 0
- ./scripts/check_s3s_footprint.sh — exit 0
- ./scripts/check_test_count_ratchet.sh — exit 0
- ./scripts/check_fips_wording.sh — exit 0
- ./scripts/check_embedded_secrets.sh — exit 0
- make script-tests — exit 0
- python3 ./scripts/test_object_generation_protocol_model.py — exit 0
- python3 ./scripts/check_test_wiring.py — exit 0
- ./scripts/check_no_planning_docs.sh — exit 0
- ./scripts/check_uring_lane_lib_only.sh — exit 0
- cargo nextest run --profile ci -p rustfs-ecstore --lib --locked --no-fail-fast — 5894 passed, 0 skipped
- cargo check -p rustfs-ecstore --all-targets --locked — exit 0
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(=admin::handlers::table_catalog::tests::cold_strong_registration_completes_while_other_bucket_backup_waits) | test(=admin::handlers::table_catalog::tests::commit_backend_borrowed_put_preserves_owner_authorization_and_precondition) | test(=admin::handlers::table_catalog::tests::disable_table_bucket_preserves_objects_and_can_be_reenabled) | test(=admin::handlers::table_catalog::tests::load_table_handler_negotiates_vended_credentials_without_breaking_metadata_only_callers) | test(=admin::handlers::table_catalog::tests::namespace_property_handler_updates_object_backed_catalog_and_maps_errors) | test(=app::object::get::tests::execute_get_object_resumes_from_relocated_pool_without_splicing_body) | test(=table_catalog::store::tests::catalog_writer_loss_prevents_recovery_storage_commit)' — 7 passed
- cargo nextest run --profile ci -p rustfs --lib --locked --no-fail-fast -E 'test(unsupported_remote_disk_)' — 2 passed

Additional fault-injection evidence remains incomplete. Timestamp M1 reached its original assertion; its restore run is being collected. M2–M5 and the three planned rollback faults have not run. An automated risk check interrupted the timestamp proof task; no assertions or validation settings were weakened.
2026-10-11 16:16:31 +08:00
Chris c5967686f1 fix(ecstore): bound bucket creation stack usage (#8466) 2026-10-11 00:55:29 -07:00
Chris 859de565ad refactor(rpc): serve internode rpc bodies with the owned Body (#8441)
* test(rpc): pin the wire bytes of every internode rpc response body

rustfs/backlog#2747 batch 4, step 1 of 2, on the s3s bodies the rpc paths
serve today. Each response body builder in storage/rpc/http_service.rs is
served through hyper's HTTP/1.1 server and the raw bytes the peer reads are
compared with goldens captured from this commit: status, content-length or
chunked framing, chunk boundaries, the terminating chunk, HEAD, and the cut
connection a failure after data produces. The capability responses carry a
per-process proof, so their length header and payload are checked against
the body they encode instead.

The read_file_stream response builder moves into read_file_stream_response
so the test reaches the same code the handler runs; behaviour is unchanged.

* refactor(rpc): serve internode rpc bodies with the owned Body

rustfs/backlog#2747 batch 4, step 2 of 2. The internode rpc HTTP paths
build their responses with rustfs_s3_types::Body: Body::from_stream
replaces Body::from(StreamingBlob::wrap(..)) at the six stream sites, and
the in-memory and empty bodies keep their constructors. InternodeRpcService
converts its responses into the wrapped service's response body through
From<Body>, so the server keeps composing it with the s3s service as
before. The wire-byte goldens from the previous commit pass unchanged;
storage/rpc no longer names s3s.

* fix(rpc): simplify wire test response builder type

Name the boxed response builder used by the capability wire test so
all-target Clippy can check it without a type-complexity warning.

Validation (LANG=en_US.UTF-8, CARGO_INCREMENTAL=0):
- cargo clippy -p rustfs --all-targets -- -D warnings: exit 0.
- cargo nextest run --profile ci -p rustfs --lib -E 'test(/storage::rpc::/)': 279 tests run, 279 passed, 4842 skipped.
- All 19 quick-check commands, including script-tests, both Python scripts and cargo fmt --all --check: exit 0.
- Footprint baseline regenerated: files=194, s3_error_lines=1584, ecstore_files=36; test-count baseline regenerated: 52 crates, 21228 tests, 164 ignored.
- All 54 Cargo.toml files parse without duplicate keys.

No assertion was added or changed by this lint fix. R1-R8 are retained
in the existing PR verification record.

* fix(ecstore): resume fenced Object Lock creation intents

* fix(ecstore): bound creation retry futures on the stack

* fix(ecstore): require native proof for creation retries
2026-10-11 12:34:14 +08:00
overtrue 1f7cc593e7 test(ecstore): isolate tier-free recovery fixture startup
The fixture constructor can take the production recovery lock and wait for 60 seconds before this test installs its queue and seeds metadata. Disable its background recovery only while creating this fixture, then restore the environment before calling the existing production recovery entrypoint.

Only the existing test setup changes. Its production entrypoint, default lock parameters, original assertions, 30-second timeout, cancellation and cleanup remain intact. No tests or assertions were added. Production and store/init.rs are byte-identical to the parent.

Independent acceptance ran on merge tree 8ec358cb42ba9ebb3bcfeafcef048a3f0366355b; the runner header reports parent HEAD, while before/after index and source hashes confirm this candidate. Worker task branch d8055766b8 has the same tree.

Every command used LANG=en_US.UTF-8. Task compilation also used CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, CARGO_NET_OFFLINE=true, an independent target, and empty RUSTC_WRAPPER/RUSTC_WORKSPACE_WRAPPER to keep compilers in its owned process group without changing repository configuration.

Command:
shellcheck --version && actionlint
Exit 0; observed output excerpt:
version: 0.11.0
Log SHA-256: fc9eec16b4191d058a295813ca9afbe9d2b37b59975da860170726be162a3924

Command:
cargo fmt --all --check
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_unsafe_code_allowances.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_layer_dependencies.sh
Exit 0; observed output excerpt:
Layer dependency guard passed (no new reverse dependencies/cycles).
Log SHA-256: 69c6cb1896c0586b28d1167380d3260d99d8017a4265c8df5a2348f289e93a12

Command:
./scripts/check_architecture_migration_rules.sh
Exit 0; observed output excerpt:
Architecture migration rules passed.
Log SHA-256: 28790e70d070607ed4de0704f292a65030be92ec224ef106d4b72fd8296f896e

Command:
./scripts/check_logging_guardrails.sh
Exit 0; observed output excerpt:
✅ Logging guardrails check passed
Log SHA-256: 7adf41abff8ed8f7617decf86498888ddde78937099dd9ce47f6d359dfc2d317

Command:
./scripts/check_error_other_format_ratchet.sh
Exit 0; observed output excerpt:
error(format!) ratchet passed (total call sites: 579).
Log SHA-256: 66172aef18f150ba0605af122e26ffcf91f6dd86f43e38b05e2e982ce8d783ee

Command:
./scripts/check_no_tokio_io_uring.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_extension_schema_boundaries.sh
Exit 0; observed output excerpt:
Extension schema boundaries passed.
Log SHA-256: f13d0acd0e2ce5d9815241b12b4dab7d01cc11b9b65bcf6dfb7812c878532a51

Command:
./scripts/check_body_cache_whitelist.sh
Exit 0; observed output excerpt:
Body-cache whitelist guard passed.
Log SHA-256: 6b828847b0383950ee6eef9cd846d0c322c945e47efd4c7d1ad881178810d6bb

Command:
./scripts/check_s3s_footprint.sh
Exit 0; observed output excerpt:
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
Log SHA-256: 47f53d04ef645618563fe1f22abc64667f19078f1974feedcca46e4f2c016844

Command:
./scripts/check_test_count_ratchet.sh
Exit 0; observed output excerpt:
test-count ratchet OK: 52 crates, 21340 tests, 164 ignored match .config/test-count-baseline.txt
Log SHA-256: 618a5e330e933de0c6ff484546df401457024a88bb5986d11d588794e33dab60

Command:
./scripts/check_fips_wording.sh
Exit 0; observed output excerpt:
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
Log SHA-256: 99221cc9979c480ec4f46f50d76c52b18c72fe499f12e15e4f4a22a1b8bfb140

Command:
./scripts/check_embedded_secrets.sh
Exit 0; observed output excerpt:
Embedded secret guard passed (no private key material or provider credential literal in the tree).
Log SHA-256: 437a3ceba32094d2901889965ad191e411aad32cdb18bf0b8659e818011c406b

Command:
make script-tests
Exit 0; observed output excerpt:
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok
Ran 10 tests in 0.042s
OK
Ran 30 tests in 20.627s
OK
Ran 10 tests in 2.268s
OK
Ran 33 tests in 0.127s
OK
Ran 7 tests in 0.002s
OK
Ran 7 tests in 0.001s
OK
Ran 4 tests in 0.108s
OK
Ran 3 tests in 0.564s
OK
PASS: cold stampede script self-test
Log SHA-256: 75fda2d069a373c63667b908baaf99e6591aab9099a739b0c4c22ceb6da8d68c

Command:
python3 ./scripts/test_object_generation_protocol_model.py
Exit 0; observed output excerpt:
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok
Ran 24 tests in 0.929s
OK
Log SHA-256: 0b4be926efb0609d497ae58930340153f01957b606206cbbdb3e0d47eb29d3a2

Command:
python3 ./scripts/check_test_wiring.py
Exit 0; observed output excerpt:
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
Log SHA-256: 21f676f458451525535ab0ef73d6a9c0d9774e16d76a4d19e396ad34936dd39c

Command:
./scripts/check_no_planning_docs.sh
Exit 0; observed output excerpt:
(no stdout or stderr)
Log SHA-256: e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855

Command:
./scripts/check_uring_lane_lib_only.sh
Exit 0; observed output excerpt:
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
Log SHA-256: 43f3f851e27ec2ab9e34d6b05fefdede38af992699c473904bfe6f53a46d52e3

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast
Exit 0; wall 234.399s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 3m 49s
    Starting 1 test across 1 binary (5871 tests skipped)
  SETUP PASS [   0.006s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.440s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item
     Summary [   0.586s] 1 test run: 1 passed, 5871 skipped
Log SHA-256: 34e973f86e8dc2102c1a0e483e0ac802ce7df3d1b40a603932f62c0805c4de27

Command:
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over) | test(=store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence) | test(=store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable)' --no-fail-fast
Exit 0; wall 4.010s.
Observed output:
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.43s
    Starting 3 tests across 1 binary (5869 tests skipped)
  SETUP PASS [   0.005s] ecstore-base-stack: sh -c 'echo RUST_MIN_STACK=4194304 >> "$NEXTEST_ENV"'
        PASS [   0.068s] rustfs-ecstore bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_eight_coordinators_hold_one_leader_and_take_over
        PASS [   0.637s] rustfs-ecstore store::bucket::tests::creation_commit_backfill_runs_under_the_config_write_fence
        PASS [   0.846s] rustfs-ecstore store::bucket::tests::orphaned_bucket_recovery_requires_every_volume_absent_and_is_retryable
     Summary [   0.987s] 3 tests run: 3 passed, 5869 skipped
Log SHA-256: b5da2a927ff18ca9aa217762f7186a6d4371bd9e8feedd7b77940e10b64dffac

Command:
cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Exit 0; wall 1084.508s.
Observed output:
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 18m 03s
Log SHA-256: 28f98be7970faaa71cd118da1da4e6e2e3d23b9dda7e6449eaa7a37e741260b5

Compiled mutation command (unchanged for each red and restored run):
cargo nextest run --profile ci -p rustfs-ecstore --lib --features rio-v2 -E 'test(=bucket::lifecycle::bucket_lifecycle_ops::tests::tier_free_version_recovery_production_entrypoint_enqueues_seeded_item)' --no-fail-fast

M1: reverse only this test-local constructor flag from false to true. The mutant compiled, then failed the original recovered-item queue assertion after 30.481s. Restoring the entire observed candidate passed in 0.460s. Red log 55bf3b1535529ac0bcfb8071f9b56f9f40631007a85c315367e7e93786d65293; restored log 204d5fbe4574a7917f5e740a795d864fe28a7e7fb5e33d27b0a9cf68e2f17f52.

M2: replace only the actual awaited enqueue with false, consuming its original inputs. The mutant compiled, then failed the same original queue assertion after 30.516s. Restoring the entire observed candidate passed in 0.457s. Red log 89186330413215e231e2b06bf013cc31097ea8f4a106d91421a36d6c8986a7fd; restored log e848b42d2302401afa5dbcd9e37bf76d2e56a96ab6de5a488513b997f53c5e9b.

All temporary observation and mutation code was removed before final acceptance. Historical baseline and diagnostic failures remain recorded; they are not mutation credit. The separate Object Lock intent-retry diagnostic still fails, and these native macOS checks do not establish Linux CI recovery.
2026-10-09 19:29:50 +08:00
overtrue 1d5a50f094 fix: remove redundant pending closure in disk test
Pass the capture-free pending future factory as a function item in the existing slow-operation test. This fixes the redundant_closure error at disk_store.rs:2914 that stopped strict Clippy before the feature tests could run.

The single-line test edit preserves the factory's result, warning and timeout behavior. Reversing the replacement reproduces the parent file byte for byte. All 220 assertion lines and the production prefix are unchanged; no tests, assertions, guards, profiles or baselines were added or relaxed.

Original Linux CI evidence (run 37888552268 at 53245be9f):
- RIO job113685483992: strict Clippy exit101, redundant closure at disk_store.rs:2914; feature tests skipped.
- Workspace Test and Lint job113685484058: same strict Clippy exit101; nextest and doc tests skipped.
These are lint failures, not runtime mutation kills or known flakes.

Native macOS arm64 validation on tree7a5bf47e7533b29479bc85207416102f1337c566, LANG=en_US.UTF-8, one build job, CARGO_INCREMENTAL=0 and offline dependencies:

shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
All 19 checks: exit0, 312.161s.

$ cargo clippy -p rustfs -p rustfs-ecstore --all-targets --features rio-v2 -- -D warnings
Finished `dev` profile [unoptimized + debuginfo] target(s) in 20m 11s
exit0, 1213.210s total.

$ cargo nextest run --profile ci -p rustfs-ecstore --features rio-v2 slow_disk_operation_warns_once_while_pending_and_preserves_result --no-fail-fast
Finished `test` profile [unoptimized + debuginfo] target(s) in 4m 34s
PASS [0.026s] rustfs-ecstore disk::disk_store::tests::slow_disk_operation_warns_once_while_pending_and_preserves_result
Summary [   0.170s] 1 test run: 1 passed, 5943 skipped
exit0, 281.920s total; 5943 existing filter skips.

warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
This linker warning is retained; flags, profiles and allowances are unchanged.

54 tracked Cargo.toml files parsed without duplicate keys. git diff --check passed. No new assertions were introduced, so no new runtime mutation is claimed. Native compilation and the existing helper test do not substitute for actual Linux RIO execution; the new integration CI run still needs to recover before the RPC merge.

Preservation and output hashes:
parent file SHA256: 8e59ee745e3aaaa22848b943d3b10f6353b515956282cde1f3af2c394200c9ac
final file SHA256: b69ba3237061b161448ae8b62b615885d5770b98a5b4a2479bcfbd70f1bd1f17
unchanged production prefix SHA256: 7903a6e288252c420231242d7b58a25fa2a7140ea3dd430cbe7f0dde11369dcb
RIO Linux failure log SHA256:421addb9868fd88e4109a922311e54f91f0dfd70862f8ba7fcaba193482ed90b
Workspace Linux failure log SHA256:e0aea8d0f014c022252a9534968e083c98cfc1fd760da445ecd04ec3f522e26a
19 output SHA256:35a54f28d707956ed1edb29d492c4dfe8a9fe753d103b111b5a2f1b5c41c2b98
RIO Clippy output SHA256:d6046e3868f2b3992fe11cdd04e9e98eb50a87d1234d9a70dbfeb154ff61638d
slow-operation output SHA256:605b7b258d2fd09c6ef2ab2ffc90d433d0509480f1e45125d20c823759e83608

Refs rustfs/backlog#2734.
2026-10-09 14:44:39 +08:00
overtrue 53245be9f4 fix: repair integration checks and IPC test readiness
Wait for the RPC/locks test sockets to pass the existing owner and mode
checks inside the original 5s readiness window and 10ms poll interval.

Use the existing admin S3 carrier for the new recovery and quota error
calls. Regenerate the test-count baseline for main's 118 existing tests
across seven crates. Pair the private pagination helper's raw-scan inputs
and remove the redundant Copy clone from the retirement event.

Keep the original assertions, responses, authorization, locks and storage
operations. The pagination body and raw-scan expressions at all five calls
are byte-identical; reinserting only the Copy clone restores the entire
base heal file. All ignored baseline values and s3s counts stay unchanged.

Validation base: c47432e353
Validation tree: f081084bc5
Patch SHA-256: 2dcf0028691bfb2772edfb38e262829b04f4151832dcce823c9dd9f7434b52de
Trace production-prefix SHA-256: fd994f218a21429d62866f4efb8eee1ee57b58f4a51865aa35d05a54ef1ccb45

All commands used LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1,
CARGO_INCREMENTAL=0 and CARGO_NET_OFFLINE=true in one exclusive target.
Every gate retained the same tree and six source hashes before and after.
54 Cargo.toml files parse without duplicate keys.

cargo clippy -p rustfs --all-targets -- -D warnings
    Finished `dev` profile [unoptimized + debuginfo] target(s) in 12m 50s
Exit: 0. Wall time: 770.855s.

The original 19 quick-check steps:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0
Wall time: 286.337s.

cargo nextest run --profile ci -p rustfs --no-fail-fast
     Summary [ 217.017s] 5382 tests run: 5382 passed (4 leaky), 40 skipped
Exit: 0. Wall time: 1324.414s.

cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
     Summary [   2.189s] 543 tests run: 543 passed, 0 skipped
Exit: 0. Wall time: 123.192s.

cargo nextest run --profile ci -p rustfs-ecstore list_objects_paginate --no-fail-fast
     Summary [   0.170s] 8 tests run: 8 passed, 5921 skipped
Exit: 0. Wall time: 261.324s.

cargo nextest run --profile ci -p rustfs-heal durable_mrf_anchor_retires_only_after_exact_bucket_generation_is_deleted --no-fail-fast
     Summary [   0.805s] 1 test run: 1 passed, 835 skipped
Exit: 0. Wall time: 199.801s.

Baseline regeneration:
./scripts/check_test_count_ratchet.sh --update
wrote .config/test-count-baseline.txt: 52 crates, 21340 tests, 164 ignored
Test-only increases: ecstore48, heal3, iam14, io-metrics2, obs3, policy14,
rustfs34. Existing ignored values and all other rows are byte-identical.
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)

Historical runtime red controls on f622 (same retained two assertions):
cargo nextest run --profile ci -p rustfs --lib -E 'test(=connect::diagnostics::trace_runtime::tests::local_top_rpc_reads_service_http_completions_and_signs_offline) | test(=connect::diagnostics::trace_runtime::tests::local_top_locks_reads_service_manager_and_signs_offline)' --no-fail-fast
Original path readiness with a temporary 500ms bind/seal gap:
     Summary [   0.863s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Sealed readiness in that same gap:
     Summary [   5.621s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Compiled M1: replace the helper predicate with path.exists():
     Summary [   0.870s] 2 tests run: 0 passed, 2 failed, 5113 skipped
Exit: 100.
Restore the sealed predicate byte-for-byte:
     Summary [   5.640s] 2 tests run: 2 passed, 5113 skipped
Exit: 0.
Both reds observe mode755 with owner_matches=true and fail at the original
RPC/locks unwraps with StateSecurity. M1 failure locations: trace_runtime.rs
2547:29 and 2713:29. No new assertions were introduced.

cargo nextest run --profile ci -p rustfs --lib -E 'test(connect::diagnostics::trace_runtime::tests::)' --no-fail-fast
     Summary [  20.748s] 28 tests run: 28 passed (1 leaky), 5087 skipped
Exit: 0. This security sweep is historical; the full final unit gate above
covers the actual c474 candidate.
The first disk-stopped compile ran no tests and is excluded from red credit.
All temporary seal instrumentation is removed from the final source.

Final unit cleanup markers: 4 leaky, 40 original skips (exit0). The ld
__eh_frame linker warning also appears verbatim in the original f622 run
and the earlier c474 run; there are no new source warnings.
2026-10-09 13:09:50 +08:00
rustfs-cla-assistant[bot] c47432e353 Merge remote-tracking branch 'origin/main' into gateway/integration 2026-10-09 02:20:19 +00:00
overtrue f622c1bce0 fix(test): compare legacy body wire parity as raw bytes
Lossy UTF-8 comparison concealed a changed binary response byte.
Compare the already captured Vec<u8> values directly.

Validation:
- Binary mutant: migrated payload 0x84 vs legacy 0x83; old comparator
  passed 1/1, raw comparator failed 0/1 (exit 100); restored green.
- Non-Swift body-drain mutant: untouched-body delegation test failed
  with empty vs payload (exit 100); restored handler without a diff.
- cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols
  --features rustfs-protocols/swift --no-fail-fast:
  543 tests run, 543 passed, 0 skipped after both mutants restored.
- cargo fmt --all --check and git diff --check passed.

Orchestrator acceptance (LANG=en_US.UTF-8):
cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
Summary [2.445s] 543 tests run: 543 passed, 0 skipped.

All shared quick checks on the final code tree:
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

Final independent acceptance after the drive-test CI repair
Parent: a99d8f4f89
Tested code tree: 93cbd96bf0

Tested tree: 075ae5161c2b62a96812bc1e3c904a7663b4f2f8
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs-s3-types -p rustfs-protocols --features rustfs-protocols/swift --no-fail-fast
    Finished `test` profile [unoptimized + debuginfo] target(s) in 10m 08s
 Nextest run ID 5c7ff102-ec6d-479a-86e0-810859b28bbf with nextest profile: ci
    Starting 543 tests across 8 binaries
     Summary [   6.729s] 543 tests run: 543 passed, 0 skipped
exit_code=0

The only source change is the raw-byte wire comparator. Cargo manifests and the ratchet baselines remain unchanged from the independently validated parent. The invalid-byte and consumed-request mutations remain recorded above; their implementation changes were restored.
2026-10-09 08:42:46 +08:00
overtrue a99d8f4f89 test(connect): restore one-second drive request budgets
Apply the exact test-only repair already landed on main in 5972a09cc3. The filesystem probe and production CLI success test request one second and keep their existing one-second duration and parameter checks. All outcome, I/O, error, cleanup and resource-limit assertions remain.

Scope: rustfs/tests/connect_perf_drive.rs only. Patch-id: cb0a1dfc8f68a67727525adea7458e2cee7d09f8.

Validation environment: LANG=en_US.UTF-8, CARGO_BUILD_JOBS=1, CARGO_INCREMENTAL=0, exclusive APFS-cloned CARGO_TARGET_DIR.

Quick Checks: every command from .github/actions/quick-checks/action.yml, with captured output and exit status below.

$ shellcheck --version && actionlint
ShellCheck - shell script analysis tool
version: 0.11.0
license: GNU General Public License, version 3
website: https://www.shellcheck.net
exit_code=0

$ cargo fmt --all --check
exit_code=0

$ ./scripts/check_unsafe_code_allowances.sh
exit_code=0

$ ./scripts/check_layer_dependencies.sh
Layer dependency guard passed (no new reverse dependencies/cycles).
exit_code=0

$ ./scripts/check_architecture_migration_rules.sh
Architecture migration rules passed.
exit_code=0

$ ./scripts/check_logging_guardrails.sh
✅ Logging guardrails check passed
exit_code=0

$ ./scripts/check_error_other_format_ratchet.sh
error(format!) ratchet passed (total call sites: 582).
exit_code=0

$ ./scripts/check_no_tokio_io_uring.sh
exit_code=0

$ ./scripts/check_extension_schema_boundaries.sh
Extension schema boundaries passed.
exit_code=0

$ ./scripts/check_body_cache_whitelist.sh
Body-cache whitelist guard passed.
exit_code=0

$ ./scripts/check_s3s_footprint.sh
s3s footprint OK: files importing s3s is 195 (baseline files=195)
s3s footprint OK: s3s s3_error! lines is 1584 (baseline s3_error_lines=1584)
s3s footprint OK: ecstore files referencing s3s is 36 (baseline ecstore_files=36)
✅ s3s footprint baseline check passed
exit_code=0

$ ./scripts/check_test_count_ratchet.sh
test-count ratchet OK: 52 crates, 21222 tests, 164 ignored match .config/test-count-baseline.txt
exit_code=0

$ ./scripts/check_fips_wording.sh
FIPS wording guard passed (README.md and CHANGELOG.md contain no forbidden claims).
KMS wording guard passed (crates/kms claims no Vault KV2 Transit wrapping).
exit_code=0

$ ./scripts/check_embedded_secrets.sh
Embedded secret guard passed (no private key material or provider credential literal in the tree).
exit_code=0

$ make script-tests
Running script tests...
entrypoint credential policy tests passed
internode grpc A/B bench env tests passed
object batch benchmark enhanced tests passed
PASS package service script contract
hotpath warp A/B gate tests passed
hotpath warp ABBA tests passed
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out
Scanner validation artifacts written to /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.1pFe6Kl1Yu/out-missing-pid
.............................
----------------------------------------------------------------------
Ran 29 tests in 181.286s

OK
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G01","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G02"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-E"}
{"decision":"verified","pending_gates":["G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G01"}
{"decision":"verified","pending_gates":["G01","G02","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G03"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-L"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G14"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G10"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P1"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P2"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P3"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
Status-and-outcome release descriptor verified: /private/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp8rwn1pe0/descriptor/release-bundle-status-outcome.json
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G05"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G06"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"R-D"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G07"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G09","G10","G11","G12","G13","G14","P1","P2","P3","P4","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"G08"}
{"decision":"verified","pending_gates":["G01","G02","G03","G04","G05","G06","G07","G08","G09","G10","G11","G12","G13","G14","P1","P2","P3","R-D","R-E","R-L"],"pending_lanes":["authority-coverage","checkpoint-and-crash","ec8-4-multiset","maintenance-producers","mixed-version-rollback","mrf-responsibility","scheduler-pressure","status-and-outcome"],"rejected_errors":[],"rejected_gate":null,"release_approved":false,"release_schema_capable":true,"schema":1,"verified_gate":"P4"}
exact 1MiB handoff ABBA tests passed
pinned paired ABBA bench tests passed
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=7, -seed=123456789, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/explicit-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=123456789
target=path_containment
seed=123456789
max_total_time=7
git_revision=4d15b816236630b2c42f321ffc9ed3654edc94e3
git_dirty=true
runner_mode=prebuilt
==> /var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/bin/path_containment (-max_total_time=1, -seed=2322617706, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/auto-artifacts/path_containment/, corpus=/private/tmp/gw-orchestrator-2734/ci-drive/fuzz/corpus/path_containment)
-seed=2322617706
==> cargo +nightly fuzz run path_containment (-max_total_time=9, -seed=987654321, -artifact_prefix=/var/folders/0w/s4wxsn2n4w9b6f3cd4xrz53w0000gn/T/tmp.mYmuI01hNq/cargo-artifacts/path_containment/)
+nightly
fuzz
run
path_containment
-seed=987654321
seed=987654321
runner_mode=cargo-fuzz
fuzz runner seed manifest tests passed
✅ scripts/python_bin.sh resolver checks passed
self-test ok: clean fixture with every exemption present passes
self-test ok: all 11 pattern families fire
self-test ok: moving a pinned source is reported
Embedded secret guard self-test passed.
self-test ok: p1-s3s-import: 'use s3s::s3_error;' counts every line, the rustfs_s3_types module's too (s3_error_lines=3)
self-test ok: p2-s3s-mixed-tree: a multi-line s3s use tree naming s3_error counts (s3_error_lines=3)
self-test ok: p3-s3s-glob: a crate-root glob of s3s, bare or inside a tree, counts (s3_error_lines=5)
self-test ok: p4-macro-use: '#[macro_use] extern crate s3s' counts (s3_error_lines=3)
self-test ok: p5-qualified-s3s: a qualified s3s::s3_error! line counts in a cleared file (s3_error_lines=2)
self-test ok: p6-exact-pass: a baseline equal to the tree passes (exit 0)
self-test ok: n1-rustfs-import: 'use rustfs_s3_types::s3_error;' alone counts nothing (s3_error_lines=1)
self-test ok: n2-rustfs-mixed-tree: a rustfs_s3_types tree plus an s3s tree without the macro counts nothing (s3_error_lines=1)
self-test ok: n3-defines: the file defining the macro counts nothing (s3_error_lines=1)
self-test ok: n4-qualified-rustfs: a qualified rustfs_s3_types::s3_error! line counts nothing (s3_error_lines=1)
self-test ok: n5-renamed-call: a call through a renamed macro is not text-matched (out of scope) (s3_error_lines=1)
self-test ok: n6-comment-string: a comment or string mentioning s3_error! in a cleared file counts nothing (s3_error_lines=1)
self-test ok: n7-e2e-excluded: crates/e2e_test is excluded (s3_error_lines=1)
self-test ok: n8-super-glob: an unrecognised import form ('use super::*;') counts (s3_error_lines=3)
self-test ok: n9-facade: a crate-local re-export counts (s3_error_lines=2)
self-test ok: n10-renamed-import: a renamed rustfs_s3_types import does not clear s3_error! lines (s3_error_lines=2)
self-test ok: n11-commented-import: a commented-out rustfs_s3_types import does not clear (s3_error_lines=2)
self-test ok: n12-rustfs-glob: a glob import of rustfs_s3_types does not clear (s3_error_lines=2)
self-test ok: n13-comment-only: a comment mentioning s3_error! in a file with no import counts (s3_error_lines=2)
self-test ok: f1-baseline-missing: a missing baseline file fails (exit 1)
self-test ok: f2-key-missing: a baseline without s3_error_lines fails (exit 1)
self-test ok: f3-rg-fails: a failing classification search fails the guard (exit 1)
✅ s3s footprint self-test passed
test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs (__main__.SelfTests.test_core_gate_rejects_missing_ignored_filtered_and_corrupt_inputs) ... ok
test_e2e_requires_registration (__main__.SelfTests.test_e2e_requires_registration) ... ok
test_fuzz_runtime_uses_matrix_target (__main__.SelfTests.test_fuzz_runtime_uses_matrix_target) ... ok
test_ilm_lane_keeps_the_measured_cargo_build_budget (__main__.SelfTests.test_ilm_lane_keeps_the_measured_cargo_build_budget) ... ok
test_profile_listing_binds_platform_digest (__main__.SelfTests.test_profile_listing_binds_platform_digest) ... ok
test_profile_listing_enforces_selection (__main__.SelfTests.test_profile_listing_enforces_selection) ... ok
test_quick_checks_commands_propagate_failure (__main__.SelfTests.test_quick_checks_commands_propagate_failure) ... ok
test_quick_checks_rejects_caller_and_execution_bypasses (__main__.SelfTests.test_quick_checks_rejects_caller_and_execution_bypasses) ... ok
test_runner_readiness_fails_closed (__main__.SelfTests.test_runner_readiness_fails_closed) ... ok
test_s3_runner_rejects_unbounded_failure_locals (__main__.SelfTests.test_s3_runner_rejects_unbounded_failure_locals) ... ok
test_scanner_heal_begin_requires_embedded_source_provenance (__main__.SelfTests.test_scanner_heal_begin_requires_embedded_source_provenance) ... ok
test_scanner_heal_case_does_not_approve_pending_release (__main__.SelfTests.test_scanner_heal_case_does_not_approve_pending_release) ... ok
test_scanner_heal_case_lane_is_required_for_runner_profile (__main__.SelfTests.test_scanner_heal_case_lane_is_required_for_runner_profile) ... ok
test_scanner_heal_case_only_schema_cannot_approve_release (__main__.SelfTests.test_scanner_heal_case_only_schema_cannot_approve_release) ... ok
test_scanner_heal_crash_case_rejects_restart_oracle (__main__.SelfTests.test_scanner_heal_crash_case_rejects_restart_oracle) ... ok
test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry (__main__.SelfTests.test_scanner_heal_ec84_case_rejects_wrong_erasure_geometry) ... ok
test_scanner_heal_finish_collects_oracles_from_registry (__main__.SelfTests.test_scanner_heal_finish_collects_oracles_from_registry) ... ok
test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write (__main__.SelfTests.test_scanner_heal_multipool_case_accepts_deferred_optional_outage_write) ... ok
test_scanner_heal_pending_gate_cannot_map_to_implemented_lane (__main__.SelfTests.test_scanner_heal_pending_gate_cannot_map_to_implemented_lane) ... ok
test_scanner_heal_receipts_reject_reuse_and_missing_builds (__main__.SelfTests.test_scanner_heal_receipts_reject_reuse_and_missing_builds) ... ok
test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers (__main__.SelfTests.test_scanner_heal_rejects_boolean_fractional_and_out_of_geometry_integers) ... ok
test_scanner_heal_rejects_broken_execution_and_artifacts (__main__.SelfTests.test_scanner_heal_rejects_broken_execution_and_artifacts) ... ok
test_scanner_heal_rejects_copied_junit_and_wrong_suite_build (__main__.SelfTests.test_scanner_heal_rejects_copied_junit_and_wrong_suite_build) ... ok
test_scanner_heal_release_bundle_accepts_complete_measured_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_accepts_complete_measured_evidence) ... ok
test_scanner_heal_release_bundle_assembler_copies_measured_artifacts (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_copies_measured_artifacts) ... ok
test_scanner_heal_release_bundle_assembler_merges_measured_descriptors (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_merges_measured_descriptors) ... ok
test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_duplicate_descriptor_gate) ... ok
test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_fixture_descriptor) ... ok
test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_hash_mismatch) ... ok
test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions (__main__.SelfTests.test_scanner_heal_release_bundle_assembler_rejects_mixed_descriptor_revisions) ... ok
test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions (__main__.SelfTests.test_scanner_heal_release_bundle_enforces_topology_duration_profile_and_versions) ... ok
test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_fixture_writer_is_not_release_evidence) ... ok
test_scanner_heal_release_bundle_gate_accepts_single_measured_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_accepts_single_measured_gate) ... ok
test_scanner_heal_release_bundle_gate_rejects_missing_field (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_missing_field) ... ok
test_scanner_heal_release_bundle_gate_rejects_unknown_gate (__main__.SelfTests.test_scanner_heal_release_bundle_gate_rejects_unknown_gate) ... ok
test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields (__main__.SelfTests.test_scanner_heal_release_bundle_rejects_synthetic_or_missing_fields) ... ok
test_scanner_heal_release_bundle_requires_domain_evidence (__main__.SelfTests.test_scanner_heal_release_bundle_requires_domain_evidence) ... ok
test_scanner_heal_release_bundle_requires_field_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_field_provenance) ... ok
test_scanner_heal_release_bundle_requires_json_artifact_provenance (__main__.SelfTests.test_scanner_heal_release_bundle_requires_json_artifact_provenance) ... ok
test_scanner_heal_release_bundle_requires_mixed_version_field_roles (__main__.SelfTests.test_scanner_heal_release_bundle_requires_mixed_version_field_roles) ... ok
test_scanner_heal_release_bundle_requires_same_gate_measurement_window (__main__.SelfTests.test_scanner_heal_release_bundle_requires_same_gate_measurement_window) ... ok
test_scanner_heal_release_consumes_multiple_registry_oracles (__main__.SelfTests.test_scanner_heal_release_consumes_multiple_registry_oracles) ... ok
test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence (__main__.SelfTests.test_scanner_heal_release_matrix_lanes_remain_pending_without_real_evidence) ... ok
test_scanner_heal_release_requirements_cannot_be_cleared (__main__.SelfTests.test_scanner_heal_release_requirements_cannot_be_cleared) ... ok
test_scanner_heal_release_status_rejects_focused_case_run (__main__.SelfTests.test_scanner_heal_release_status_rejects_focused_case_run) ... ok
test_scanner_heal_release_status_rejects_synthetic_case (__main__.SelfTests.test_scanner_heal_release_status_rejects_synthetic_case) ... ok
test_scanner_heal_required_evidence_fields_cannot_be_removed (__main__.SelfTests.test_scanner_heal_required_evidence_fields_cannot_be_removed) ... ok
test_scheduled_alerts_require_completion_watchdog (__main__.SelfTests.test_scheduled_alerts_require_completion_watchdog) ... ok
test_update_profile_selection_changes_only_requested_platform (__main__.SelfTests.test_update_profile_selection_changes_only_requested_platform) ... ok
test_validate_includes_quick_checks (__main__.SelfTests.test_validate_includes_quick_checks) ... ok
test_vault_tests_require_cross_process_serialization (__main__.SelfTests.test_vault_tests_require_cross_process_serialization) ... ok
test_workflow_readiness_requires_dependency_probe (__main__.SelfTests.test_workflow_readiness_requires_dependency_probe) ... ok

----------------------------------------------------------------------
Ran 52 tests in 14.301s

OK
e2e-full selection OK: 1 tests, sha256=29e30e6ed2ed38d9e5b0a7cdd9536abf5c719f7021a02b578ae1381563a3c273
...................................
----------------------------------------------------------------------
Ran 35 tests in 1.161s

OK
...................
----------------------------------------------------------------------
Ran 19 tests in 17.397s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 0.183s

OK
test_actual_selector_bootstrap_uses_base_policy_and_fails_closed (__main__.SelfTests.test_actual_selector_bootstrap_uses_base_policy_and_fails_closed) ... ok
test_documentation_paths_do_not_hide_build_or_fixture_changes (__main__.SelfTests.test_documentation_paths_do_not_hide_build_or_fixture_changes) ... ok
test_e2e_scope_keeps_production_and_shared_configuration_full (__main__.SelfTests.test_e2e_scope_keeps_production_and_shared_configuration_full) ... ok
test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies (__main__.SelfTests.test_e2e_shortcut_rejects_new_direct_renamed_and_target_dependencies) ... ok
test_e2e_shortcut_traverses_implicit_path_dependencies (__main__.SelfTests.test_e2e_shortcut_traverses_implicit_path_dependencies) ... ok
test_event_contract_requires_complete_candidate_and_optional_lanes (__main__.SelfTests.test_event_contract_requires_complete_candidate_and_optional_lanes) ... ok
test_every_wrong_result_missing_job_or_selection_fails_closed (__main__.SelfTests.test_every_wrong_result_missing_job_or_selection_fails_closed) ... ok
test_full_e2e_gate_preserves_workflow_branch_and_event_scope (__main__.SelfTests.test_full_e2e_gate_preserves_workflow_branch_and_event_scope) ... ok
test_git_range_includes_deleted_source_and_rename_origins (__main__.SelfTests.test_git_range_includes_deleted_source_and_rename_origins) ... ok
test_job_ids_and_display_names_cannot_hide_validation (__main__.SelfTests.test_job_ids_and_display_names_cannot_hide_validation) ... ok
test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate (__main__.SelfTests.test_report_only_stack_lane_mirrors_e2e_smoke_outside_the_aggregate) ... ok
test_repository_wiring_and_missing_dependency_regression (__main__.SelfTests.test_repository_wiring_and_missing_dependency_regression) ... ok
test_verify_command_preserves_failures (__main__.SelfTests.test_verify_command_preserves_failures) ... ok

----------------------------------------------------------------------
Ran 13 tests in 3.280s

OK
security coverage self-test passed
test_api_failures_preserve_other_evidence_and_never_enter_grace (__main__.SelfTests.test_api_failures_preserve_other_evidence_and_never_enter_grace) ... ok
test_attempt_outcome_does_not_replace_recent_success (__main__.SelfTests.test_attempt_outcome_does_not_replace_recent_success) ... ok
test_cancelled_attempt_cannot_refresh_expired_success (__main__.SelfTests.test_cancelled_attempt_cannot_refresh_expired_success) ... ok
test_cli_requires_the_repository_default_branch (__main__.SelfTests.test_cli_requires_the_repository_default_branch) ... ok
test_config_rejects_duplicate_and_invalid_entries (__main__.SelfTests.test_config_rejects_duplicate_and_invalid_entries) ... ok
test_freshness_boundaries (__main__.SelfTests.test_freshness_boundaries) ... ok
test_grace_requires_two_successful_queries_with_no_history (__main__.SelfTests.test_grace_requires_two_successful_queries_with_no_history) ... ok
test_invalid_api_evidence_fails_closed (__main__.SelfTests.test_invalid_api_evidence_fails_closed) ... ok
test_report_retains_every_workflow (__main__.SelfTests.test_report_retains_every_workflow) ... ok
test_requests_filter_schedule_default_branch_and_success_on_server (__main__.SelfTests.test_requests_filter_schedule_default_branch_and_success_on_server) ... ok

----------------------------------------------------------------------
Ran 10 tests in 0.051s

OK
..............................
----------------------------------------------------------------------
Ran 30 tests in 22.354s

OK
..........
----------------------------------------------------------------------
Ran 10 tests in 2.969s

OK
.................................
----------------------------------------------------------------------
Ran 33 tests in 0.160s

OK
Online functional runner labels: pf-testing
.......
----------------------------------------------------------------------
Ran 7 tests in 0.002s

OK
.......
----------------------------------------------------------------------
Ran 7 tests in 0.001s

OK
....
----------------------------------------------------------------------
Ran 4 tests in 0.128s

OK
...
----------------------------------------------------------------------
Ran 3 tests in 0.547s

OK
PASS: cold stampede script self-test
exit_code=0

$ python3 ./scripts/test_object_generation_protocol_model.py
test_a_recovery_barrier_cannot_choose_an_empty_value (__main__.ObjectGenerationProtocolModel.test_a_recovery_barrier_cannot_choose_an_empty_value) ... ok
test_all_bounded_two_proposer_interleavings_choose_at_most_one_value (__main__.ObjectGenerationProtocolModel.test_all_bounded_two_proposer_interleavings_choose_at_most_one_value) ... ok
test_an_unavailable_decision_quorum_cannot_choose_a_candidate (__main__.ObjectGenerationProtocolModel.test_an_unavailable_decision_quorum_cannot_choose_a_candidate) ... ok
test_counter_allocation_requires_persistence_and_is_consumed_once (__main__.ObjectGenerationProtocolModel.test_counter_allocation_requires_persistence_and_is_consumed_once) ... ok
test_counter_restart_burns_persisted_allocations_before_or_after_issue (__main__.ObjectGenerationProtocolModel.test_counter_restart_burns_persisted_allocations_before_or_after_issue) ... ok
test_crash_after_promise_before_reply_does_not_restore_an_older_ballot (__main__.ObjectGenerationProtocolModel.test_crash_after_promise_before_reply_does_not_restore_an_older_ballot) ... ok
test_duplicate_or_unconfigured_voters_cannot_form_a_quorum (__main__.ObjectGenerationProtocolModel.test_duplicate_or_unconfigured_voters_cannot_form_a_quorum) ... ok
test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision (__main__.ObjectGenerationProtocolModel.test_empty_or_unobserved_minority_slot_can_retry_without_allocating_another_revision) ... ok
test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected (__main__.ObjectGenerationProtocolModel.test_equal_ballot_cannot_accept_different_bytes_and_lower_ballot_is_rejected) ... ok
test_forgetting_tombstone_authority_allows_an_aba_create (__main__.ObjectGenerationProtocolModel.test_forgetting_tombstone_authority_allows_an_aba_create) ... ok
test_issuing_before_persistence_reuses_a_ballot_after_restart (__main__.ObjectGenerationProtocolModel.test_issuing_before_persistence_reuses_a_ballot_after_restart) ... ok
test_lost_ack_and_restart_preserve_the_chosen_operation (__main__.ObjectGenerationProtocolModel.test_lost_ack_and_restart_preserve_the_chosen_operation) ... ok
test_minority_accepted_work_is_adopted_and_finished (__main__.ObjectGenerationProtocolModel.test_minority_accepted_work_is_adopted_and_finished) ... ok
test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample (__main__.ObjectGenerationProtocolModel.test_omitting_highest_accepted_adoption_has_a_double_choice_counterexample) ... ok
test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it (__main__.ObjectGenerationProtocolModel.test_quorum_choice_does_not_require_an_uncontacted_disk_to_learn_it) ... ok
test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor (__main__.ObjectGenerationProtocolModel.test_recovery_failure_or_stale_expected_head_does_not_allocate_a_successor) ... ok
test_replacing_voters_with_empty_state_can_choose_a_conflicting_value (__main__.ObjectGenerationProtocolModel.test_replacing_voters_with_empty_state_can_choose_a_conflicting_value) ... ok
test_skipping_predecessor_recovery_chooses_a_broken_revision_chain (__main__.ObjectGenerationProtocolModel.test_skipping_predecessor_recovery_chooses_a_broken_revision_chain) ... ok
test_stale_publication_rollback_and_gc_cannot_change_the_winner (__main__.ObjectGenerationProtocolModel.test_stale_publication_rollback_and_gc_cannot_change_the_winner) ... ok
test_superseded_operation_identity_cannot_be_reused_for_different_input (__main__.ObjectGenerationProtocolModel.test_superseded_operation_identity_cannot_be_reused_for_different_input) ... ok
test_superseded_operation_retry_returns_its_original_successor (__main__.ObjectGenerationProtocolModel.test_superseded_operation_retry_returns_its_original_successor) ... ok
test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision (__main__.ObjectGenerationProtocolModel.test_tombstone_and_null_marker_payloads_do_not_reset_authority_revision) ... ok
test_tombstone_rejects_a_delayed_never_present_create (__main__.ObjectGenerationProtocolModel.test_tombstone_rejects_a_delayed_never_present_create) ... ok
test_unlearned_predecessor_is_recovered_before_the_second_slot (__main__.ObjectGenerationProtocolModel.test_unlearned_predecessor_is_recovered_before_the_second_slot) ... ok

----------------------------------------------------------------------
Ran 24 tests in 0.958s

OK
model: states=51023, transitions=167520, terminal=732, chosen_candidates=2
negative control: double-choice trace=((0, 'prepare', 0), (0, 'prepare', 1), (0, 'prepare', 2), (0, 'accept', 0), (0, 'accept', 1), (0, 'accept', 2), (1, 'prepare', 0), (1, 'prepare', 1), (1, 'prepare', 2), (1, 'accept', 0), (1, 'accept', 1), (1, 'accept', 2))
multi-slot round schedules: 640
exit_code=0

$ python3 ./scripts/check_test_wiring.py
OK: e2e modules, runner selection, fuzz matrices, profiles, scheduled alerts, and Quick Checks are wired
exit_code=0

$ ./scripts/check_no_planning_docs.sh
exit_code=0

$ ./scripts/check_uring_lane_lib_only.sh
OK: no 'uring_'-matching test functions under crates/ecstore/tests; --lib is safe
exit_code=0

Initial complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID e07fc5b9-c6c8-4cdd-ae61-54839bf24437 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.016s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.011s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.009s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  16.950s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.025s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.008s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.007s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.035s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  21.087s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Restored complete gate
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
 Nextest run ID 233b7307-5361-4eb7-94d5-b384f17d2d6a with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.009s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.008s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.008s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.008s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  19.518s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   4.146s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.009s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.018s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.009s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.054s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  23.787s] 10 tests run: 10 passed, 0 skipped
exit_code=0

Mutation M1: success_measurement reports max(actual elapsed, requested budget + 1), forcing 1001 ms for the one-second request. The retained duration assertion at rustfs/tests/connect_perf_drive.rs:105 fails.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 06s
────────────
 Nextest run ID 9f618777-7bf6-4cbc-8803-dd7f50f449ed with nextest profile: ci
    Starting 1 test across 1 binary (9 tests skipped)
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (106986846) panicked at rustfs/tests/connect_perf_drive.rs:105:5:
    assertion failed: (1..=1_000).contains(&data.duration_millis)
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [   0.017s] 1 test run: 0 passed, 1 failed, 9 skipped
        FAIL [   0.016s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Mutation M2: target_parameters reports requested duration + 1. The in-process assertion at rustfs/tests/connect_perf_drive.rs:111 and CLI JSON assertion at rustfs/tests/connect_perf_drive.rs:527 both reject 1001 against 1000.
$ cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast -E 'test(real_local_write_read_is_measured_and_scratch_is_removed) | test(production_cli_measures_and_signs_exact_binary_provenance)'
info: experimental features enabled: setup-scripts
   Compiling rustfs v1.0.1 (/private/tmp/gw-orchestrator-2734/ci-drive/rustfs)
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs") generated 1 warning
warning: `rustfs` (bin "rustfs-cli") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 7m 20s
────────────
 Nextest run ID b73d46ab-c910-4e1e-8063-7fc7e332ec15 with nextest profile: ci
    Starting 2 tests across 1 binary (8 tests skipped)
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
  stdout ───

    running 1 test
    test production_cli_measures_and_signs_exact_binary_provenance ... FAILED

    failures:

    failures:
        production_cli_measures_and_signs_exact_binary_provenance

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 13.96s

  stderr ───

    thread 'production_cli_measures_and_signs_exact_binary_provenance' (107015462) panicked at rustfs/tests/connect_perf_drive.rs:527:5:
    assertion `left == right` failed
      left: Number(1001)
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
  stdout ───

    running 1 test
    test real_local_write_read_is_measured_and_scratch_is_removed ... FAILED

    failures:

    failures:
        real_local_write_read_is_measured_and_scratch_is_removed

    test result: FAILED. 0 passed; 1 failed; 0 ignored; 0 measured; 9 filtered out; finished in 0.01s

  stderr ───

    thread 'real_local_write_read_is_measured_and_scratch_is_removed' (107016667) panicked at rustfs/tests/connect_perf_drive.rs:111:5:
    assertion `left == right` failed
      left: 1001
     right: 1000
    note: run with `RUST_BACKTRACE=1` environment variable to display a backtrace

────────────
     Summary [  13.985s] 2 tests run: 0 passed, 2 failed, 8 skipped
        FAIL [  13.968s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        FAIL [   0.015s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
error: test run failed
exit_code=100

Transient production mutations were restored byte-for-byte before the complete green rerun. Original/restored SHA256: 8d389e6d8836c041aab8c6a93e56addd65ba3f70b33264e1c74f639d0572a2da.

$ git diff --check

exit_code=0

$ git diff --cached --check

exit_code=0

Independent orchestrator acceptance
Tested code tree: e67c72fb01

Tested tree: 16fbbd2ea4
shellcheck --version && actionlint -> exit 0
cargo fmt --all --check -> exit 0
./scripts/check_unsafe_code_allowances.sh -> exit 0
./scripts/check_layer_dependencies.sh -> exit 0
./scripts/check_architecture_migration_rules.sh -> exit 0
./scripts/check_logging_guardrails.sh -> exit 0
./scripts/check_error_other_format_ratchet.sh -> exit 0
./scripts/check_no_tokio_io_uring.sh -> exit 0
./scripts/check_extension_schema_boundaries.sh -> exit 0
./scripts/check_body_cache_whitelist.sh -> exit 0
./scripts/check_s3s_footprint.sh -> exit 0
./scripts/check_test_count_ratchet.sh -> exit 0
./scripts/check_fips_wording.sh -> exit 0
./scripts/check_embedded_secrets.sh -> exit 0
make script-tests -> exit 0
python3 ./scripts/test_object_generation_protocol_model.py -> exit 0
python3 ./scripts/check_test_wiring.py -> exit 0
./scripts/check_no_planning_docs.sh -> exit 0
./scripts/check_uring_lane_lib_only.sh -> exit 0

$ LANG=en_US.UTF-8 CARGO_BUILD_JOBS=1 CARGO_INCREMENTAL=0 cargo nextest run --profile ci -p rustfs --test connect_perf_drive --no-fail-fast
info: experimental features enabled: setup-scripts
warning: linker stderr: ld: __eh_frame section too large (max 16MB) to encode dwarf unwind offsets in compact unwind table, performance of exception handling might be affected
  |
  = note: `#[warn(linker_messages)]` on by default

warning: `rustfs` (bin "rustfs-cli") generated 1 warning
warning: `rustfs` (bin "rustfs") generated 1 warning (1 duplicate)
    Finished `test` profile [unoptimized + debuginfo] target(s) in 0.69s
────────────
 Nextest run ID cd1edf4c-f1c0-456d-ad1a-76cc00ce05c9 with nextest profile: ci
    Starting 10 tests across 1 binary
        PASS [   0.012s] rustfs::connect_perf_drive cancellation_and_single_collector_leave_no_scratch
        PASS [   0.010s] rustfs::connect_perf_drive cleanup_failure_overrides_cancellation_and_remains_attributed
        PASS [   0.010s] rustfs::connect_perf_drive consent_and_resource_budgets_fail_before_scratch_io
        PASS [   0.009s] rustfs::connect_perf_drive invalid_roots_and_existing_scratch_fail_without_clobbering
        PASS [  20.328s] rustfs::connect_perf_drive production_cli_measures_and_signs_exact_binary_provenance
        PASS [   5.527s] rustfs::connect_perf_drive production_cli_rejects_missing_l1_consent_and_limits_before_artifacts
        PASS [   0.013s] rustfs::connect_perf_drive read_only_root_and_full_drive_errors_are_classified
        PASS [   0.019s] rustfs::connect_perf_drive real_local_write_read_is_measured_and_scratch_is_removed
        PASS [   0.011s] rustfs::connect_perf_drive runtime_timeout_and_full_drive_use_schema_valid_failed_reason
        PASS [   0.049s] rustfs::connect_perf_drive successful_result_has_signed_bounded_private_offline_export
────────────
     Summary [  25.991s] 10 tests run: 10 passed, 0 skipped

exit_code=0

All 54 tracked Cargo.toml files parse without duplicate keys. git diff --check passed. The production source remains unchanged; the two deliberate implementation mutations above were restored before this complete green run.
2026-10-09 08:21:15 +08:00
Chris 4d15b81623 refactor(protocols): move error types to rustfs-s3-types by codemod (#8439)
T1.2 batch 3 (rustfs/backlog#2743): s3select-api, s3select-query and
the error items of protocols move off s3s by scripts/codemods, run with
--hold crates/protocols/src/sftp/errors.rs. That file stays on s3s: it
downcasts the backend error, whose runtime type is still s3s::S3Error.

- rustfs/src/protocols/client.rs: the two webdav session methods now
  return rustfs_s3_types::S3Result and convert the s3s error with From.
- codemod: a child module that calls s3_error! through `use super::*`
  gets its own `use rustfs_s3_types::s3_error;` once its parent imports
  that macro by name; otherwise it is listed as GLOB.
- s3-types: a table test pins code, status and the s3s error the legacy
  edge renders for every variant a moved call site names.
- s3_error_lines 1585 -> 1584 (a lifecycle comment reworded).
2026-10-08 15:59:34 -07:00
Chris 836d30192f feat(s3-types): add Body::from_stream and move Swift off s3s::Body (#8438)
rustfs/backlog#2747 batch 3. `Body::from_stream` wraps a chunk stream of
unknown length over `StreamBody`/`BoxBody`: one data frame per chunk, the
first error ends the body, the size hint stays unknown, and dropping the
body drops the stream. Parity tests pin it to the s3s `StreamingBlob::wrap`
it replaces, at the `http_body` level and byte for byte through hyper.

The Swift handlers in rustfs-protocols build their responses as the owned
`Body`. `SwiftService` converts them into the wrapped S3 service's response
body type through `From<Body>`, so rustfs keeps serving `s3s::Body` at the
legacy edge unchanged. Request bodies stay Send-only (`UnsyncBoxBody`); the
two storage writers and the DLO/SLO segment streams get `Sync` from
`sync_wrapper::SyncStream`, which is what s3s's `http_body_unsync` mutex
provided before. The DTO and error uses of s3s in protocols are untouched
(T1.5 and T1.2).
2026-10-08 15:05:16 -07:00
Chris 860c61ee6d feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor (#8437)
* feat(app): add the RustFS-owned RequestEnvelope and its s3s constructor

* ci: classify the s3s edge adapters in storage/s3_compat as interface
2026-10-08 11:58:55 -07:00
Chris f600af4704 test(e2e): compare two RUSTFS_S3_STACK servers over every S3 operation (#8435)
Add dual_stack_differential to e2e_test. It starts two rustfs processes
from the same binary, stack A on RUSTFS_S3_STACK=legacy and stack B on
RUSTFS_E2E_STACK_B (default legacy until rustfs/backlog#2734 T2.5),
sends both the same aws-sdk-s3 script covering the 73 methods of
impl S3 for FS (a normal request and a 4xx negative each), and compares
status, error code, an allowlist of response headers and a few typed
body fields. Error message text is never compared. Each run writes
<target>/dual-stack/<run>.json with compared_ops and the (op, field,
a, b) differences; any difference fails the test.

differential_detects_an_injected_difference starts B with
RUSTFS_REGION=eu-west-1 and requires GetBucketLocation to be reported.
The comparator is pure and unit-tested without a server.

Wire the module into the e2e-smoke filter and update the e2e-smoke and
e2e-full selection digests and the e2e_test test-count row.

Refs rustfs/backlog#2740
2026-10-08 10:47:10 -07:00
overtrue 9e747e8475 ci(footprint): count only s3_error! lines still on s3s's macro
s3_error_lines counted every line holding the text `s3_error!`, which
also matches the RustFS-owned `rustfs_s3_types::s3_error!`. A codemod
that moves call sites onto rustfs-s3-types therefore could not lower it
(rustfs/backlog#2743, decision 3; rustfs/rustfs#8432, gotcha 2).

The counter now applies a textual, per-file and per-line rule that errs
on the side of counting (full rule in the script header):
- occurrences spelled `rustfs_s3_types::s3_error!` never count;
- a line holding `s3s::s3_error!` always counts;
- any other `s3_error!` line counts unless its file is cleared, that is,
  it imports the macro from rustfs_s3_types by name on a line starting
  with the use item (or defines it with `macro_rules! s3_error`) and does
  not also bring s3s's macro in (`use s3s::s3_error`, a `use s3s::{..}`
  tree naming it or a crate-root `*`, `use s3s::*`, or
  `#[macro_use] extern crate s3s`);
- fail closed: a file matching neither form (`use super::*`, a
  crate-local re-export, a renamed or glob rustfs_s3_types import, a
  commented-out import, a comment-only mention) counts.

Census of the 1585 lines on 96fc06776: 1478 in 64 files that import the
macro from s3s; 107 in 15 files matching neither form (105 through
`use super::*`, 1 qualified `s3s::s3_error!`, 1 comment line); none in
files that import it from rustfs_s3_types or define it. Every line stays
counted, so the baseline remains s3_error_lines=1585 (files=202 and
ecstore_files=36 unchanged). Rewriting rustfs/src/auth.rs's import to
rustfs_s3_types lowers the new counter to 1567; the old one stayed 1585.

`--self-test` (wired into `make script-tests`) copies the script into
22 fixture trees: 6 positive cases and 16 negative ones (lines that must
not count, forms that must not clear a file, and a missing baseline,
missing key or failing classification search that must fail). Each tree
has a control line that must count, and each run gets s3s text on stdin.
Seven cases were red against the old counter. 19 mutants each turn their
case red: old definition, flipped import test, dropped fail-closed
branch, dropped e2e_test exclusion, dropped s3s veto, dropped qualified
s3s rule, dropped rustfs-qualified strip, unanchored rustfs import,
renamed import accepted, nested glob taken as root glob, single-line
s3s trees only, dropped s3s glob forms, dropped macro_use form, dropped
definition clearing, ignored classification rg errors, error-line search
without its path, classification searches without their path, missing
baseline skipped, missing key skipped.
2026-10-09 01:03:21 +08:00
Chris 96fc067765 refactor(ecstore): move S3ErrorCode to rustfs-s3-types by codemod (#8432)
* test(ecstore): pin the InvalidRange responses of new_getobjectreader

Both error branches of new_getobjectreader build an ErrorResponse with S3ErrorCode::InvalidRange, and no test observed either code. Pin the code, its wire name and the location fields of each branch before the code type moves to rustfs-s3-types (rustfs/backlog#2743), so a changed code on either branch fails a test. The ecstore test-count row rises by the two tests.

* chore(scripts): add the s3s-to-rustfs-s3-types error codemod

Task T1.2 of rustfs/backlog#2734 (rustfs/backlog#2743) moves S3Error, S3ErrorCode, S3Result and s3_error! from s3s to rustfs-s3-types by script, one crate closure per PR. The codemod rewrites use trees (splitting mixed s3s imports) and qualified code paths, never comments or literals, adds the rustfs-s3-types dependency, drops s3s only from a crate that no longer names it, refuses every file of the s3s edge allowlist, takes --hold for a file whose type is fixed outside the closure, and prints a per-crate census. A second run changes nothing. Its self-test runs under make script-tests.

* refactor(ecstore): take S3ErrorCode from rustfs-s3-types

Output of scripts/codemods/s3_error_to_s3_types.py over crates/ecstore, crates/lifecycle, crates/scanner and crates/replication (rustfs/backlog#2743 batches 1 and 2). The ErrorResponse code field, the two InvalidRange constructions in new_getobjectreader and an unused tier import now use rustfs_s3_types::S3ErrorCode; the variant names and wire names are unchanged. lifecycle, scanner and replication reference none of the four error names. warm_backend.rs and warm_backend_s3.rs are held: they compare against rustfs_s3_client::ErrorResponse.code, which stays the s3s type until s3-client moves.
2026-10-08 09:30:37 -07:00
Chris e809b4899e refactor(s3-types): own the HTTP Body and drop s3s from three crates (#8431)
Add rustfs_s3_types::Body, a BoxBody<Bytes, StdError> wrapper with
empty() and From<Bytes | Vec<u8> | String | &'static str>, and the
legacy From conversions to and from s3s::Body behind compat-s3s.

The signer is now generic over the request body: it only reads and
writes the request head, so it needs no body type and its callers keep
theirs. s3-client sends its requests with the owned Body, madmin signs a
bodiless head, and targets drops its two S3Request/S3Response header
wrappers in favour of extract_params_header.

rustfs-signer, rustfs-madmin and rustfs-targets no longer depend on
s3s; the s3s footprint baseline drops from 209 to 202 files.

Refs rustfs/backlog#2747, rustfs/backlog#2734
2026-10-08 08:43:06 -07:00
Chris 584f03f300 test(ecstore): reach the bucket-config codec through the test facade (#8428) 2026-10-08 07:12:19 -07:00
Chris d52d6fade7 ci: make the s3s footprint baseline exact and lower-only (#8403)
* ci: make the s3s footprint baseline exact and lower-only

The s3s footprint guard compared three counters against ceilings held in
the script itself, so a ceiling could sit above the tree and a drift was
fixable by raising it (rustfs/rustfs#5964 raised the s3_error! ceiling
to go green). The three values now live in
.config/s3s-footprint-baseline.txt as files, s3_error_lines and
ecstore_files, the script reads only that file, and a measurement that
differs from its baseline in either direction fails: growth prints
"s3s footprint grew: <measured> > <baseline>", shrinkage prints
"lower the baseline to <measured> in this PR". The counting method is
unchanged; the baseline is the current measurement of
gateway/integration (209 / 1585 / 36). The header records the end state:
once all three reach 0, T4.2 switches the script to failing on any
occurrence.

Refs rustfs/backlog#2739, rustfs/backlog#2734

* ci: add the s3s edge allowlist mode to the footprint guard (#8405)

`scripts/check_s3s_footprint.sh --mode allowlist` fails on every Rust
file that references s3s (`s3s::` or `s3s_sigv4`) and is not matched by
an entry of the new `.config/s3s-edge-allowlist.txt`; `--dry-run` lists
those files and exits 0. The allowlist carries the initial edge from the
spec, and the script rejects an entry that names or matches anything
under crates/ other than crates/e2e_test. The baseline mode and the
argument-less CI invocation are unchanged.

Refs rustfs/backlog#2741, rustfs/backlog#2734
2026-10-08 06:48:57 -07:00
Chris 3623d6db2d ci: raise the test-count baseline to the integration tree (#8426) 2026-10-08 06:48:40 -07:00
Chris 484f1254ca test(ecstore): pin the persisted bucket-config XML bytes for 13 families (#8408)
Before any DTO or codec is replaced, pin the exact bytes that
deserialize followed by serialize produces for every persisted
bucket-configuration XML family in its three source shapes (AWS
documentation, MinIO-written, RustFS-written), and the bytes RustFS
writes today for a typed value. Byte equality only: a structural
comparison would let a codec replacement change the persisted encoding
unnoticed.

The generator script refuses to overwrite existing goldens without
--force, refuses on dirty codec paths, cannot report success from its
write mode, and records the generating commit in the fixtures README.

Refs rustfs/backlog#2744, rustfs/backlog#2734
2026-10-08 21:25:56 +08:00
Chris c9c16efbb6 ci: add the per-crate test-count ratchet (#8404)
Quick Checks now fails any PR that lowers the number of test attributes
in a workspace crate or adds #[ignore], measured per crate against the
exact rows of .config/test-count-baseline.txt (rustfs/backlog#2734
section 1 rule 3). The counter widens the spec's literal
#[(tokio::)?test] to the tokio attributes that carry arguments and both
spellings of #[test_case(...)], and anchors at line start so
commented-out attributes do not count. The initial baseline covers 52
crates, 21077 tests and 164 ignored.

Refs rustfs/backlog#2738
Refs rustfs/backlog#2734
2026-10-08 21:25:42 +08:00
Chris f2a59073ca feat(s3-types): add the RustFS-owned S3 error type and s3_error! macro (#8406)
`rustfs-s3-types` now provides `S3ErrorCode` (generated by build.rs from
src/codes.txt, the grep-derived call surface, plus `Custom`), `S3Error`,
`S3Result`, `StdError` and the `s3_error` macro with the same call syntax
as s3s, so the T1.2 codemod is a `use` swap. Statuses are hand-written and
pinned to the s3s behaviour RustFS ships today by an oracle test that uses
s3s as a dev-dependency only. The `From` conversions for the legacy edge
live behind the off-by-default `compat-s3s` feature (the orphan rule
forbids them in rustfs/src/error.rs); `rustfs` enables it.

Refs rustfs/backlog#2742, rustfs/backlog#2734
2026-10-08 04:11:00 -07:00
Chris c1af94d1d1 refactor(server): group the s3s-compat tower layers under legacy_compat (#8410)
Move the ten tower layers that patch s3s behaviour out of
rustfs/src/server/layer.rs into rustfs/src/server/legacy_compat/, one file
per layer with its tests. Each file header names the s3s behaviour it
patches, the gateway mechanism that replaces it (Replaced by:), and the task
that removes it (Removed by: T2.12, rustfs/backlog#2771). The layers keep
their code, their order in external_service_stack!, and their behaviour; no
layer is deleted.

Add server::http::tests::stack_census, which renders the ordered service
chain of the real external_service_stack! expansion and compares it with a
committed constant, so a reorder, insertion or removal is a visible diff.

Route the two s3s error types the moved layers use through a
storage_api::server::legacy_compat shim so the split adds no s3s-importing
file, and lower the s3s footprint baselines to the measured values (files 209
to 208, s3_error! lines 1586 to 1585). Keep the server runtime-source bypass
guard covering the moved code.

Refs rustfs/backlog#2787, rustfs/backlog#2734
2026-10-08 02:57:47 -07:00
Chris f84bbfe28f feat(server): add the RUSTFS_S3_STACK selector and dual-stack e2e lane (#8411) 2026-10-07 21:01:39 -07:00
rustfs-cla-assistant[bot] 378a2ff7f8 Merge remote-tracking branch 'origin/main' into gateway/integration 2026-10-08 02:18:57 +00:00
rustfs-cla-assistant[bot] b88b53aa6a Merge remote-tracking branch 'origin/main' into gateway/integration 2026-10-07 21:18:17 +00:00
33 changed files with 3759 additions and 196 deletions
+5
View File
@@ -70,6 +70,11 @@ s3s-footprint-check: ## Check the s3s dependency footprint ratchet stays frozen
@echo "📦 Checking s3s footprint ratchet..."
./scripts/check_s3s_footprint.sh
.PHONY: gateway-stack-release-boundary-check
gateway-stack-release-boundary-check: ## Check no release build can enable the gateway-stack feature
@echo "🚧 Checking gateway-stack release boundary..."
./scripts/check_gateway_stack_release_boundary.sh
.PHONY: test-count-ratchet-check
test-count-ratchet-check: ## Check no workspace crate fell below its test floor or rose above its #[ignore] ceiling in the committed baseline
@echo "🧪 Checking per-crate test-count ratchet..."
+2 -2
View File
@@ -20,11 +20,11 @@ planning-docs-check: ## Check that no planning-type documents are committed
./scripts/check_no_planning_docs.sh
.PHONY: pre-commit
pre-commit: fmt-check unsafe-code-check architecture-migration-check logging-guardrails-check error-other-ratchet-check tokio-io-uring-check extension-schema-check body-cache-whitelist-check s3s-footprint-check test-count-ratchet-check test-seams-check fips-wording-check embedded-secrets-check test-wiring-check doc-paths-check planning-docs-check quick-check ## Run fast pre-commit checks without clippy/full tests
pre-commit: fmt-check unsafe-code-check architecture-migration-check logging-guardrails-check error-other-ratchet-check tokio-io-uring-check extension-schema-check body-cache-whitelist-check s3s-footprint-check gateway-stack-release-boundary-check test-count-ratchet-check test-seams-check fips-wording-check embedded-secrets-check test-wiring-check doc-paths-check planning-docs-check quick-check ## Run fast pre-commit checks without clippy/full tests
@echo "✅ All pre-commit checks passed!"
.PHONY: pre-pr
pre-pr: fmt-check unsafe-code-check architecture-migration-check logging-guardrails-check error-other-ratchet-check tokio-io-uring-check extension-schema-check body-cache-whitelist-check s3s-footprint-check test-count-ratchet-check test-seams-check fips-wording-check embedded-secrets-check test-wiring-check doc-paths-check planning-docs-check log-analyzer-rules-check offline-enrollment-e2e-check clippy-check test ## Run full pre-PR checks with clippy and tests
pre-pr: fmt-check unsafe-code-check architecture-migration-check logging-guardrails-check error-other-ratchet-check tokio-io-uring-check extension-schema-check body-cache-whitelist-check s3s-footprint-check gateway-stack-release-boundary-check test-count-ratchet-check test-seams-check fips-wording-check embedded-secrets-check test-wiring-check doc-paths-check planning-docs-check log-analyzer-rules-check offline-enrollment-e2e-check clippy-check test ## Run full pre-PR checks with clippy and tests
@echo "✅ All pre-PR checks passed!"
.PHONY: dev-check
+1
View File
@@ -61,6 +61,7 @@ script-tests: ## Run shell script tests
$(RUSTFS_PYTHON_BIN) ./scripts/test_check_doc_paths.py
./scripts/check_embedded_secrets.sh --self-test
./scripts/check_s3s_footprint.sh --self-test
./scripts/check_gateway_stack_release_boundary.sh --self-test
./scripts/test_check_test_count_ratchet.sh
$(RUSTFS_PYTHON_BIN) ./scripts/check_test_wiring.py --self-test
$(RUSTFS_PYTHON_BIN) ./scripts/codemods/s3_error_to_s3_types.py --self-test
+4
View File
@@ -97,6 +97,10 @@ runs:
shell: bash
run: ./scripts/check_s3s_footprint.sh
- name: Check gateway-stack release boundary
shell: bash
run: ./scripts/check_gateway_stack_release_boundary.sh
- name: Check per-crate test-count ratchet
shell: bash
run: ./scripts/check_test_count_ratchet.sh
+50 -1
View File
@@ -115,7 +115,7 @@ jobs:
printf '%s\n' 'mode=full' >> "$GITHUB_OUTPUT"
echo "Base CI policy unavailable; running the full matrix."
fi
if ! grep -q '^plan=' "$GITHUB_OUTPUT" || ! grep -q '^plan_contract=3$' "$GITHUB_OUTPUT"; then
if ! grep -q '^plan=' "$GITHUB_OUTPUT" || ! grep -q '^plan_contract=4$' "$GITHUB_OUTPUT"; then
printf '%s\n' 'mode=full' 'connect=true' 'full_validation=true' 'rehearse_shards=false' 'packages=' 'plan=' >> "$GITHUB_OUTPUT"
echo "Base policy does not cover this workflow contract; retaining the full matrix."
fi
@@ -705,6 +705,53 @@ jobs:
retention-days: 3
if-no-files-found: warn
test-and-lint-gateway-stack:
name: Test and Lint (gateway-stack)
# The gateway S3 stack (rustfs/backlog#2734) sits behind the rustfs
# `gateway-stack` feature, which no other pull-request lane lints or tests.
# Unlike the dormant feature lanes above, this one runs for every code
# change: each operation slice puts its handler tests, its authorization
# census and its end-to-end refusal test behind the feature, and a lane that
# ran only on demand would let them rot behind a green pull request.
if: needs.classify-changes.outputs.mode == 'full' && (github.event_name != 'pull_request' || github.event.action != 'closed')
needs: [ quick-checks, classify-changes ]
# Self-hosted for build scale and cache ownership: a workspace-scale Cargo
# build that reads the ci-dev cache written on this image.
runs-on: sm-standard-4
timeout-minutes: 90
env:
FORCE_JAVASCRIPT_ACTIONS_TO_NODE24: "true"
steps:
- name: Checkout repository
uses: actions/checkout@f548e57e544e1ff5a4c46bf1e1b8685f8e4a348a # v7
with:
persist-credentials: false
- name: Setup Rust environment
uses: ./.github/actions/setup
with:
rust-version: stable
cache-shared-key: ci-dev
cache-save-if: 'false'
install-build-packaging-tools: 'false'
# A feature that does not compile fails here; nothing below is skipped
# into a pass.
- name: Run clippy with gateway-stack
run: cargo clippy --locked -p rustfs --all-targets --features gateway-stack -- -D warnings
# The gateway stack's own tests: the assembly, the authorizer table and
# its census, the handler template, the migrated use cases, and the
# embedded server driven through the whole middleware stack.
- name: Run tests with gateway-stack
env:
# The same bounded link concurrency as the other feature lanes.
CARGO_BUILD_JOBS: "2"
run: |
cargo nextest run --profile ci --locked -p rustfs --features gateway-stack --no-tests fail \
--status-level all --final-status-level all \
-E 'test(/gateway_stack|gateway_handlers|server::stack::|list_buckets|legacy_stack_is_always_selectable/) | binary(embedded_gateway_stack_test)'
build-rustfs-debug-binary:
name: Build RustFS Debug Binary
if: contains(fromJSON('["full", "e2e"]'), needs.classify-changes.outputs.mode) && (github.event_name != 'pull_request' || github.event.action != 'closed')
@@ -1579,6 +1626,7 @@ jobs:
- fips-provider
- test-and-lint-rio-v2
- test-and-lint-protocols
- test-and-lint-gateway-stack
- build-rustfs-debug-binary
- uring-integration
- e2e-tests
@@ -1613,6 +1661,7 @@ jobs:
- core-contract
- test-and-lint-rio-v2
- test-and-lint-protocols
- test-and-lint-gateway-stack
- build-rustfs-debug-binary
- build-rustfs-debug-binary-rio-v2
- uring-integration
Generated
+2
View File
@@ -9639,6 +9639,8 @@ dependencies = [
"rustfs-ecstore",
"rustfs-extension-schema",
"rustfs-filemeta",
"rustfs-gateway",
"rustfs-gateway-adapter",
"rustfs-gateway-types",
"rustfs-heal",
"rustfs-heal-contracts",
+1
View File
@@ -54,6 +54,7 @@ The four site-replication state-writer concurrency proofs reserve the available
| PR, non-doc change | `Typos` | `ci.yml` `typos` | Via aggregate | `typos` |
| Full selection | `Workspace tests` (serial ILM step) | `ci.yml` `workspace-tests` | Via aggregate | exact `Run ignored ILM integration tests serially` command in the job |
| Nightly schedule, manual dispatch | `Test and Lint (rio-v2)`, `Test and Lint (swift)`, `Test and Lint (sftp)`, `Test and Lint (http3)` | `ci.yml` `test-and-lint-rio-v2`, `test-and-lint-protocols` | Via aggregate on these events; skipped on PRs, merge groups and main pushes | `cargo nextest run` with the job's `--features` |
| Full selection, every event | `Test and Lint (gateway-stack)` | `ci.yml` `test-and-lint-gateway-stack` | Via aggregate | `cargo clippy -p rustfs --all-targets --features gateway-stack -- -D warnings`; `cargo nextest run -p rustfs --features gateway-stack` with the job's filter |
| Nightly schedule, manual dispatch, full selection | `Connect Feature Boundaries` | `ci.yml` `connect-feature-boundaries` | Via aggregate on these events; skipped on PRs, merge groups and main pushes | `cargo test -p rustfs --test connect_registration --features connect-e2e-short-credentials`; `cargo check -p rustfs --release --features connect-e2e-short-credentials` must fail; `scripts/check_offline_enrollment_e2e.sh` |
| PR, non-doc change | `Build RustFS Debug Binary` | `ci.yml` `build-rustfs-debug-binary` | Via aggregate; prerequisite for black-box jobs | `python3 scripts/e2e_binary.py build --bins --features e2e-test-hooks` (binary plus its `rustfs.e2e.json` sidecar) |
| Nightly schedule, manual dispatch, full selection | `io_uring Integration (real)` | `ci.yml` `uring-integration` | Via aggregate on these events; skipped on PRs, merge groups and main pushes | `cargo test -p rustfs-ecstore --lib uring_ -- --test-threads=1 --nocapture` |
+16 -1
View File
@@ -56,6 +56,12 @@ required-features = ["swift"]
name = "swift_object_integration_test"
required-features = ["swift"]
# Starts an embedded server on the gateway stack, which only a build with the
# feature can select.
[[test]]
name = "embedded_gateway_stack_test"
required-features = ["gateway-stack"]
[features]
default = ["ftps", "webdav", "gcs"]
fips = ["rustls/fips", "tokio-rustls/fips", "rustfs-tls-runtime/fips", "rustfs-ecstore/fips", "rustfs-protocols/fips", "rustfs-s3-client/fips", "rustfs-targets/fips", "rustfs-utils/fips"]
@@ -69,12 +75,19 @@ license = []
io-scheduler-debug = [] # Enable debug information in I/O scheduler
tracing-chunk-debug = [] # Enable per-chunk tracing in data plane (high noise, for debugging only)
full = ["metrics-gpu", "ftps", "swift", "webdav", "sftp", "pyroscope", "gcs"]
e2e-test-hooks = ["rustfs-ecstore/e2e-test-hooks", "rustfs-scanner/e2e-test-hooks"]
# The debug-only E2E binary also carries the gateway S3 stack, so the gateway smoke
# lane runs the same artifact as the legacy one with RUSTFS_S3_STACK as its only change.
e2e-test-hooks = ["rustfs-ecstore/e2e-test-hooks", "rustfs-scanner/e2e-test-hooks", "gateway-stack"]
# Shortens Connect credentials only in debug E2E builds.
connect-e2e-short-credentials = []
# Builds the dedicated rustfs-cli-e2e target with a build-time public enrollment root.
offline-enrollment-e2e-root = []
rio-v2 = ["rustfs-ecstore/rio-v2"]
# The rustfs-gateway S3 stack, selected at startup with RUSTFS_S3_STACK=gateway
# (rustfs/backlog#2734). Under construction: off by default and never enabled in a
# release build; the stack refuses to compile without debug assertions, and
# `scripts/check_gateway_stack_release_boundary.sh` keeps it out of release inputs.
gateway-stack = ["dep:rustfs-gateway", "dep:rustfs-gateway-adapter"]
pyroscope = ["rustfs-obs/pyroscope", "dep:pyroscope", "dep:object", "dep:symbolic-demangle"]
# Tokio runtime telemetry. Requires `--cfg tokio_unstable`; use `make build-profiling`.
dial9 = ["rustfs-obs/dial9"]
@@ -255,6 +268,8 @@ rustfs-notify = { workspace = true }
rustfs-obs = { workspace = true }
rustfs-policy = { workspace = true }
rustfs-protocols = { workspace = true }
rustfs-gateway = { workspace = true, optional = true }
rustfs-gateway-adapter = { workspace = true, optional = true }
rustfs-gateway-types = { workspace = true, features = ["compat-s3s-rustfs"] }
rustfs-protos = { workspace = true }
rustfs-rio = { workspace = true }
+152 -28
View File
@@ -19,8 +19,8 @@ use super::storage_api::bucket_usecase::StorageObjectInfo as ObjectInfo;
#[cfg(test)]
use super::storage_api::bucket_usecase::access::ReqInfo;
use super::storage_api::bucket_usecase::access::{
TableDataPlaneListAccess, authorize_request, bucket_config_mutation_incarnation, log_list_buckets_iam_implicit_deny,
prepare_list_buckets_iam_authorization, prepare_odm_read_generation, req_info_ref,
ListBucketsAuthzRequest, TableDataPlaneListAccess, authorize_request, bucket_config_mutation_incarnation,
log_list_buckets_iam_implicit_deny, prepare_list_buckets_iam_authorization, prepare_odm_read_generation, req_info_ref,
};
#[cfg(test)]
use super::storage_api::bucket_usecase::bucket::target::BucketTarget;
@@ -47,7 +47,7 @@ use super::storage_api::bucket_usecase::bucket::{
versioning_sys::BucketVersioningSys,
};
use super::storage_api::bucket_usecase::contract::bucket::{
BucketOperations, BucketOptions, DeleteBucketOptions, MakeBucketOptions,
BucketInfo, BucketOperations, BucketOptions, DeleteBucketOptions, MakeBucketOptions,
};
use super::storage_api::bucket_usecase::contract::list::{
ListObjectVersionsInfo as StorageListObjectVersionsInfo, ListObjectsV2Info as StorageListObjectsV2Info, ListOperations as _,
@@ -56,9 +56,9 @@ use super::storage_api::bucket_usecase::error::StorageError;
use super::storage_api::bucket_usecase::helper::{OperationHelper, spawn_background_with_context};
use super::storage_api::bucket_usecase::object_utils::to_s3s_xml_etag;
use super::storage_api::bucket_usecase::s3_api::bucket::{
ListObjectVersionsParams, ListObjectsV2Params, build_list_buckets_output, build_list_object_versions_output,
build_list_objects_output, build_list_objects_v2_output, encode_list_objects_v2_continuation_token,
parse_list_object_versions_params, parse_list_objects_v2_params, rustfs_owner,
ListObjectVersionsParams, ListObjectsV2Params, build_list_object_versions_output, build_list_objects_output,
build_list_objects_v2_output, encode_list_objects_v2_continuation_token, parse_list_object_versions_params,
parse_list_objects_v2_params, rustfs_owner,
};
use super::storage_api::bucket_usecase::{
get_validated_store, process_lambda_configurations, process_queue_configurations, process_topic_configurations,
@@ -66,6 +66,7 @@ use super::storage_api::bucket_usecase::{
};
#[cfg(feature = "diagnostic-read-version-caller")]
use super::storage_api::diagnostic;
use crate::app::RequestEnvelope;
use crate::app::bucket_list_through as list_through;
use crate::app::object::shared::mark_on_demand_migration_list_local_only;
use crate::app::object_data_cache::invalidate_object_data_cache_bucket_after_delete;
@@ -87,12 +88,14 @@ use http::StatusCode;
use metrics::counter;
use rustfs_config::RUSTFS_REGION;
use rustfs_gateway_types::cors_tagging::{PersistedCorsConfiguration, PersistedTagging};
use rustfs_gateway_types::dto as gateway_dto;
use rustfs_gateway_types::persistence::{
PersistedBucketEncryptionConfiguration, PersistedNotificationConfiguration,
PersistedObjectLockConfiguration as ObjectLockConfiguration, PersistedPublicAccessBlockConfiguration,
PersistedVersioningConfiguration,
};
use rustfs_gateway_types::persistence::{PersistedLifecycleConfiguration, PersistedReplicationConfiguration};
use rustfs_gateway_types::{BucketName, Timestamp as GatewayTimestamp};
use rustfs_io_metrics::record_s3_op;
use rustfs_madmin::{SITE_REPL_API_VERSION, SRBucketMeta};
use rustfs_policy::policy::{
@@ -116,15 +119,15 @@ use s3s::dto::{
GetBucketCorsInput, GetBucketEncryptionInput, GetBucketLifecycleConfigurationInput, GetBucketLocationInput,
GetBucketLocationOutput, GetBucketNotificationConfigurationInput, GetBucketPolicyInput, GetBucketPolicyOutput,
GetBucketPolicyStatusInput, GetBucketPolicyStatusOutput, GetBucketReplicationInput, GetBucketTaggingInput,
GetBucketVersioningInput, GetPublicAccessBlockInput, HeadBucketInput, HeadBucketOutput, LifecycleRule, ListBucketsInput,
ListBucketsOutput, ListObjectVersionsInput, ListObjectVersionsOutput, ListObjectsInput, ListObjectsOutput,
ListObjectsV2Input, ListObjectsV2Output, MetadataEntry, NotificationConfiguration, NotificationConfigurationFilter, Object,
ObjectStorageClass, ObjectVersion, ObjectVersionStorageClass, PolicyStatus, PutBucketCorsInput, PutBucketCorsOutput,
PutBucketEncryptionInput, PutBucketEncryptionOutput, PutBucketLifecycleConfigurationInput,
PutBucketLifecycleConfigurationOutput, PutBucketNotificationConfigurationInput, PutBucketNotificationConfigurationOutput,
PutBucketPolicyInput, PutBucketPolicyOutput, PutBucketReplicationInput, PutBucketReplicationOutput, PutBucketTaggingInput,
PutBucketTaggingOutput, PutBucketVersioningInput, PutBucketVersioningOutput, PutPublicAccessBlockInput,
PutPublicAccessBlockOutput, ServerSideEncryption, Timestamp, UserMetadata,
GetBucketVersioningInput, GetPublicAccessBlockInput, HeadBucketInput, HeadBucketOutput, LifecycleRule,
ListObjectVersionsInput, ListObjectVersionsOutput, ListObjectsInput, ListObjectsOutput, ListObjectsV2Input,
ListObjectsV2Output, MetadataEntry, NotificationConfiguration, NotificationConfigurationFilter, Object, ObjectStorageClass,
ObjectVersion, ObjectVersionStorageClass, PolicyStatus, PutBucketCorsInput, PutBucketCorsOutput, PutBucketEncryptionInput,
PutBucketEncryptionOutput, PutBucketLifecycleConfigurationInput, PutBucketLifecycleConfigurationOutput,
PutBucketNotificationConfigurationInput, PutBucketNotificationConfigurationOutput, PutBucketPolicyInput,
PutBucketPolicyOutput, PutBucketReplicationInput, PutBucketReplicationOutput, PutBucketTaggingInput, PutBucketTaggingOutput,
PutBucketVersioningInput, PutBucketVersioningOutput, PutPublicAccessBlockInput, PutPublicAccessBlockOutput,
ServerSideEncryption, Timestamp, UserMetadata,
};
use s3s::region::Region;
use s3s::xml;
@@ -1403,6 +1406,40 @@ fn lifecycle_has_abort_multipart_rules(config: &PersistedLifecycleConfiguration)
.any(|rule| rule.status == "Enabled" && rule.abort_incomplete_multipart_upload.is_some())
}
/// The ListBuckets answer for `bucket_infos`, in the gateway's types.
///
/// A stored name the S3 bucket grammar refuses cannot be written into the answer and is left out.
/// The storage inventory holds such names only for RustFS-internal buckets (the SFTP host-key
/// store); `rustfs/src/protocols/client.rs` applies the same rule to its listings.
fn list_buckets_output(bucket_infos: &[BucketInfo]) -> gateway_dto::ListBucketsOutput {
let buckets = bucket_infos
.iter()
.filter_map(|bucket_info| {
let name = BucketName::new(bucket_info.name.clone()).ok()?;
let created = bucket_info.created.unwrap_or(time::OffsetDateTime::UNIX_EPOCH);
let seconds = created.unix_timestamp();
let creation_date =
GatewayTimestamp::from_secs_nanos(seconds, created.nanosecond()).unwrap_or(GatewayTimestamp::from_secs(seconds));
Some(gateway_dto::Bucket {
name,
creation_date,
..Default::default()
})
})
.collect();
let owner = rustfs_owner();
gateway_dto::ListBucketsOutput {
buckets,
owner: gateway_dto::Owner {
id: owner.id,
display_name: owner.display_name,
},
continuation_token: None,
prefix: None,
}
}
#[derive(Clone, Default)]
pub struct DefaultBucketUsecase {
context: Option<Arc<AppContext>>,
@@ -1739,21 +1776,61 @@ impl DefaultBucketUsecase {
Ok(S3Response::new(GetBucketLocationOutput { location_constraint }))
}
#[instrument(level = "debug", skip(self, req))]
pub async fn execute_list_buckets(&self, req: S3Request<ListBucketsInput>) -> S3Result<S3Response<ListBucketsOutput>> {
/// Lists the buckets the caller of `envelope` may see, for either edge.
///
/// The access phase must have installed the caller's `ReqInfo` in `envelope`. A caller allowed
/// `s3:ListAllMyBuckets` sees every bucket; any other caller sees the buckets it may list or
/// locate, and is refused when there is none. `_input` is accepted and not read: RustFS answers
/// one unpaginated listing and ignores `prefix`, `max-buckets`, `continuation-token` and
/// `bucket-region`, as it always has.
///
/// # Errors
///
/// `AccessDenied` for an anonymous caller and for one that may see no bucket; `InternalError`
/// when the store or IAM is not initialized or the access phase did not run; otherwise the
/// storage error of the listing.
#[instrument(level = "debug", skip(self, envelope, _input))]
pub async fn execute_list_buckets(
&self,
envelope: RequestEnvelope,
_input: gateway_dto::ListBucketsInput,
) -> rustfs_s3_types::S3Result<gateway_dto::ListBucketsOutput> {
let Some(store) = self.object_store() else {
return Err(S3Error::with_message(S3ErrorCode::InternalError, "Not init".to_string()));
return Err(rustfs_s3_types::S3Error::with_message(
rustfs_s3_types::S3ErrorCode::InternalError,
"Not init",
));
};
if req.credentials.as_ref().is_none_or(|cred| cred.access_key.is_empty()) {
return Err(S3Error::with_message(S3ErrorCode::AccessDenied, "Access Denied"));
if envelope
.credentials()
.is_none_or(|credentials| credentials.access_key().is_empty())
{
return Err(rustfs_s3_types::S3Error::with_message(
rustfs_s3_types::S3ErrorCode::AccessDenied,
"Access Denied",
));
}
let iam_authorization = prepare_list_buckets_iam_authorization(&req).await?;
let Some(req_info) = envelope.req_info() else {
return Err(rustfs_s3_types::S3Error::with_message(
rustfs_s3_types::S3ErrorCode::InternalError,
"ReqInfo not found in request envelope",
));
};
let iam_authorization = prepare_list_buckets_iam_authorization(ListBucketsAuthzRequest {
req_info,
headers: envelope.headers(),
raw_query: envelope.uri().query(),
remote_addr: envelope.remote_addr(),
client_info: envelope.client_info(),
server_context: envelope.server_context(),
})
.await?;
let bucket_infos = if iam_authorization.is_allowed("", S3Action::ListAllMyBucketsAction).await {
store.list_bucket(&BucketOptions::default()).await.map_err(ApiError::from)?
} else {
log_list_buckets_iam_implicit_deny(&req)?;
log_list_buckets_iam_implicit_deny(req_info);
let bucket_infos = store.list_bucket(&BucketOptions::default()).await.map_err(ApiError::from)?;
let mut visible_bucket_infos = Vec::new();
for info in bucket_infos {
@@ -1772,7 +1849,7 @@ impl DefaultBucketUsecase {
visible_bucket_infos
};
Ok(S3Response::new(build_list_buckets_output(&bucket_infos)))
Ok(list_buckets_output(&bucket_infos))
}
pub async fn execute_delete_bucket_encryption(
@@ -5084,13 +5161,60 @@ mod tests {
#[tokio::test]
async fn execute_list_buckets_returns_internal_error_when_store_uninitialized() {
let input = ListBucketsInput::builder().build().unwrap();
let req = build_request(input, Method::GET);
let req = build_request((), Method::GET);
let usecase = DefaultBucketUsecase::without_context();
let err = usecase.execute_list_buckets(req).await.unwrap_err();
assert_eq!(err.code(), &S3ErrorCode::InternalError);
let err = usecase
.execute_list_buckets(RequestEnvelope::from_s3s(&req), gateway_dto::ListBucketsInput::default())
.await
.unwrap_err();
assert_eq!(err.code(), &rustfs_s3_types::S3ErrorCode::InternalError);
}
fn bucket_info(name: &str, created: Option<time::OffsetDateTime>) -> BucketInfo {
BucketInfo {
name: name.to_owned(),
created,
..Default::default()
}
}
#[test]
fn list_buckets_output_carries_names_dates_and_the_owner() {
let created = time::OffsetDateTime::from_unix_timestamp_nanos(1_700_000_000_123_000_000).expect("valid timestamp");
let output = list_buckets_output(&[bucket_info("alpha", Some(created)), bucket_info("beta", None)]);
let listed: Vec<(&str, i64, u32)> = output
.buckets
.iter()
.map(|bucket| (bucket.name.as_str(), bucket.creation_date.secs(), bucket.creation_date.subsec_nanos()))
.collect();
assert_eq!(listed, [("alpha", 1_700_000_000, 123_000_000), ("beta", 0, 0)]);
assert!(output.owner.id.is_some(), "the listing names its owner");
assert_eq!(output.continuation_token, None);
assert_eq!(output.prefix, None);
}
#[test]
fn list_buckets_output_leaves_out_names_the_bucket_grammar_refuses() {
let output = list_buckets_output(&[
bucket_info("sftp_host_keys", None),
bucket_info("UPPER", None),
bucket_info("ab", None),
bucket_info("kept", None),
]);
let names: Vec<&str> = output.buckets.iter().map(|bucket| bucket.name.as_str()).collect();
assert_eq!(names, ["kept"]);
}
#[test]
fn list_buckets_output_of_no_bucket_is_an_empty_listing_with_an_owner() {
let output = list_buckets_output(&[]);
assert!(output.buckets.is_empty());
assert!(output.owner.id.is_some());
}
#[tokio::test]
+9 -8
View File
@@ -319,10 +319,11 @@ pub(crate) mod access {
#[cfg(test)]
pub(crate) use crate::storage::storage_api::access_consumer::ReqInfo;
pub(crate) use crate::storage::storage_api::access_consumer::{
PostObjectRequestMarker, TABLE_DATA_PLANE_LIST_CURSOR_PREFIX, TableDataPlaneListAccess, TableDataPlaneListCursorPosition,
TableDataPlanePublicationGuards, apply_bucket_generation_guard, apply_copy_source_bucket_generation_guard,
authorize_copy_object_tags, authorize_request, bucket_config_mutation_incarnation, delete_object_authorize_action,
has_bypass_governance_header, load_bucket_generation_from_store, log_list_buckets_iam_implicit_deny, odm_read_generation,
ListBucketsAuthzRequest, PostObjectRequestMarker, TABLE_DATA_PLANE_LIST_CURSOR_PREFIX, TableDataPlaneListAccess,
TableDataPlaneListCursorPosition, TableDataPlanePublicationGuards, apply_bucket_generation_guard,
apply_copy_source_bucket_generation_guard, authorize_copy_object_tags, authorize_request,
bucket_config_mutation_incarnation, delete_object_authorize_action, has_bypass_governance_header,
load_bucket_generation_from_store, log_list_buckets_iam_implicit_deny, odm_read_generation,
prepare_list_buckets_iam_authorization, prepare_odm_read_generation, recursive_force_delete_has_authenticated_caller,
replication_proxy_allowed, replication_request_authorized, req_info_mut, req_info_ref,
retained_table_data_plane_publication_guards, set_requested_object_lock_retain_until,
@@ -1674,9 +1675,9 @@ pub(crate) mod timeout_wrapper {
pub(crate) mod s3_api {
pub(crate) mod bucket {
pub(crate) use crate::storage::storage_api::s3_api_consumer::bucket::{
ListObjectVersionsParams, ListObjectsV2Params, build_list_buckets_output, build_list_object_versions_output,
build_list_objects_output, build_list_objects_v2_output, encode_list_objects_v2_continuation_token,
parse_list_object_versions_params, parse_list_objects_v2_params,
ListObjectVersionsParams, ListObjectsV2Params, build_list_object_versions_output, build_list_objects_output,
build_list_objects_v2_output, encode_list_objects_v2_continuation_token, parse_list_object_versions_params,
parse_list_objects_v2_params,
};
pub(crate) use crate::storage::storage_api::s3_api_consumer::common::rustfs_owner;
}
@@ -1712,7 +1713,7 @@ pub(crate) mod bucket_usecase {
pub(crate) mod contract {
pub(crate) mod bucket {
pub(crate) use super::super::super::storage_contracts::{
BucketOperations, BucketOptions, DeleteBucketOptions, MakeBucketOptions,
BucketInfo, BucketOperations, BucketOptions, DeleteBucketOptions, MakeBucketOptions,
};
}
+1 -1
View File
@@ -78,7 +78,7 @@ impl FromStr for S3Stack {
impl S3Stack {
/// Unset selects the default; a set but invalid value, including an empty
/// one, is a startup error.
fn from_env() -> std::io::Result<Self> {
pub(crate) fn from_env() -> std::io::Result<Self> {
match std::env::var_os(ENV_RUSTFS_S3_STACK) {
None => Ok(Self::default()),
Some(value) => value
@@ -0,0 +1,61 @@
// Copyright 2024 RustFS Team
//
// Licensed under the Apache License, Version 2.0 (the "License");
// you may not use this file except in compliance with the License.
// You may obtain a copy of the License at
//
// http://www.apache.org/licenses/LICENSE-2.0
//
// Unless required by applicable law or agreed to in writing, software
// distributed under the License is distributed on an "AS IS" BASIS,
// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
// See the License for the specific language governing permissions and
// limitations under the License.
//! The access phase of a gateway handler: the legacy access hooks in their owned form.
//!
//! Responsible for: [`check`], what the legacy access phase runs once per request before any
//! operation hook. Per-operation hooks join it here as their operations are registered.
//! NOT responsible for: the decisions themselves. Every function here calls the function the
//! legacy access phase calls (`storage/access.rs`), so the two stacks cannot answer differently.
//! Upstream: each `impl Handler`. Downstream: the storage layer's access functions.
//!
//! The caller is resolved here on every request, and again by the gateway's `Authorizer` before
//! it: the pinned gateway hands a handler no policy snapshot, so one resolution cannot be carried
//! from the authorization stages to the handler.
use crate::app::RequestEnvelope;
use crate::runtime_sources::ServerContextSlot;
use crate::storage_api::server::http::access::{admit_operation, resolve_req_info};
use rustfs_s3_types::S3Result;
use std::sync::Arc;
/// Runs the per-request access check for `operation` and installs the caller in `envelope`.
///
/// The caller is the credential IAM holds for the access key the gateway verified, checked
/// against the presented session token; an anonymous request resolves to no caller. The signed
/// upload-size capabilities are then refused on any operation but their own, and the license is
/// checked.
///
/// # Errors
///
/// What the legacy access phase answers: the credential refusals of the key lookup,
/// `InvalidRequest` for a misplaced capability query, `AccessDenied` for a refused license, and
/// `InternalError` when IAM or the license cannot be read.
pub(crate) async fn check(
server_ctx: &Arc<ServerContextSlot>,
envelope: &mut RequestEnvelope,
operation: &'static str,
) -> S3Result<()> {
let credentials = envelope.credentials();
let access_key = credentials.map(|credentials| credentials.access_key().to_owned());
let session_token = credentials
.and_then(|credentials| credentials.session_token())
.unwrap_or_default()
.to_owned();
let request_context = envelope.request_context().cloned();
let req_info = resolve_req_info(server_ctx, access_key.as_deref(), &session_token, request_context).await?;
envelope.install_req_info(req_info);
admit_operation(envelope.headers(), envelope.uri().query(), operation)?;
Ok(())
}
@@ -0,0 +1,48 @@
// Copyright 2024 RustFS Team
//
// Licensed under the Apache License, Version 2.0 (the "License");
// you may not use this file except in compliance with the License.
// You may obtain a copy of the License at
//
// http://www.apache.org/licenses/LICENSE-2.0
//
// Unless required by applicable law or agreed to in writing, software
// distributed under the License is distributed on an "AS IS" BASIS,
// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
// See the License for the specific language governing permissions and
// limitations under the License.
//! `ListBuckets` on the gateway stack.
//!
//! Responsible for: converting one accepted request into the envelope and input the RustFS use
//! case takes, and its answer back.
//! NOT responsible for: deciding which buckets the caller sees. The legacy access hook for this
//! operation is empty and so is this one: `DefaultBucketUsecase::execute_list_buckets` decides
//! per caller (every bucket with `s3:ListAllMyBuckets`, otherwise the buckets the caller may
//! list or locate, `AccessDenied` when there is none), for both stacks.
//! Upstream: the gateway's dispatch. Downstream: `crate::app::bucket_usecase`.
use super::super::GatewayBackend;
use super::super::access;
use super::super::error::handler_error;
use crate::app::RequestEnvelope;
use crate::app::bucket_usecase::DefaultBucketUsecase;
use rustfs_gateway::{Handler, HandlerResult, Operation, Req, Resp, dto};
use rustfs_io_metrics::record_s3_op;
use rustfs_s3_ops::S3Operation;
impl Handler<dto::ListBuckets> for GatewayBackend {
async fn call(&self, request: Req<dto::ListBuckets>) -> HandlerResult<dto::ListBuckets> {
record_s3_op(S3Operation::ListBuckets);
let mut envelope = RequestEnvelope::from_gateway(request.context(), self.server_ctx()).map_err(handler_error)?;
access::check(self.server_ctx(), &mut envelope, <dto::ListBuckets as Operation>::NAME)
.await
.map_err(handler_error)?;
let usecase = DefaultBucketUsecase::with_context(self.server_ctx().app_context());
let output = usecase
.execute_list_buckets(envelope, request.into_input())
.await
.map_err(handler_error)?;
Ok(Resp::new(output))
}
}
@@ -0,0 +1,17 @@
// Copyright 2024 RustFS Team
//
// Licensed under the Apache License, Version 2.0 (the "License");
// you may not use this file except in compliance with the License.
// You may obtain a copy of the License at
//
// http://www.apache.org/licenses/LICENSE-2.0
//
// Unless required by applicable law or agreed to in writing, software
// distributed under the License is distributed on an "AS IS" BASIS,
// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
// See the License for the specific language governing permissions and
// limitations under the License.
//! Bucket-level operations of the gateway stack, one file each.
mod list_buckets;
@@ -0,0 +1,373 @@
// Copyright 2024 RustFS Team
//
// Licensed under the Apache License, Version 2.0 (the "License");
// you may not use this file except in compliance with the License.
// You may obtain a copy of the License at
//
// http://www.apache.org/licenses/LICENSE-2.0
//
// Unless required by applicable law or agreed to in writing, software
// distributed under the License is distributed on an "AS IS" BASIS,
// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
// See the License for the specific language governing permissions and
// limitations under the License.
//! Builds a [`RequestEnvelope`] from a request the gateway accepted, authenticated and routed.
//!
//! Responsible for: `RequestEnvelope::from_gateway`, the gateway edge's counterpart of the
//! legacy edge's `from_s3s` (`storage/s3_compat/envelope.rs`).
//! NOT responsible for: the facts the access phase attaches afterwards (`ReqInfo` and what the
//! operation hooks retain); `super::access` installs those.
//! Upstream: the gateway's handler request context. Downstream: every gateway handler.
//!
//! Every fact is copied from where the gateway or a RustFS layer in front of it put it: the
//! request line and the accepted header lines from the context, the caller from the verified
//! principal, and the payloads the connection and request layers attached from the transport
//! values the gateway carried through unchanged.
use crate::app::object::request_body::BodyReadControl;
use crate::app::{RequestCredentials, RequestEnvelope, RequestHead};
use crate::auth::{
AuthType, VerifiedPresignedRequest, VerifiedSigV4Request, get_request_auth_type_with_query, get_session_token,
};
use crate::runtime_sources::ServerContextSlot;
use crate::shared_types::{NativeTlsTransport, RemoteAddr};
use crate::storage_api::server::http::request_context::RequestContext;
use http::{Extensions, HeaderMap, Uri};
use rustfs_gateway::{RequestContextView, TransportExtensions};
use rustfs_s3_types::{S3Error, S3ErrorCode, S3Result};
use rustfs_trusted_proxies::ClientInfo;
use std::sync::Arc;
impl RequestEnvelope {
/// Copies every request fact of `context` the app layer reads, for the server `server_ctx`.
///
/// A payload the request does not carry leaves its field `None`. The caller's secret key is
/// copied only when the gateway handed it to this operation; the signature markers are set
/// only for a caller the gateway verified.
///
/// # Errors
///
/// `InternalError` when the accepted request target cannot be read back as a URI, or a
/// handed-over secret key is not text. Neither is the caller's fault.
pub(crate) fn from_gateway(context: &RequestContextView, server_ctx: &Arc<ServerContextSlot>) -> S3Result<Self> {
let uri = request_uri(context)?;
let mut headers = HeaderMap::new();
for (name, value) in context.headers().iter_raw() {
headers.append(name.clone(), value.clone());
}
let credentials = match context.principal() {
Some(principal) => {
let secret_key = principal
.secret_key_from_authenticator_lookup()
.map(|secret| secret.expose_secret());
Some(request_credentials(
principal.access_key_id(),
secret_key,
get_session_token(&uri, &headers),
)?)
}
None => None,
};
let mut extensions = Extensions::new();
let transport = context.transport_extensions();
copy_payload::<Option<RemoteAddr>>(transport, &mut extensions);
copy_payload::<ClientInfo>(transport, &mut extensions);
copy_payload::<NativeTlsTransport>(transport, &mut extensions);
copy_payload::<RequestContext>(transport, &mut extensions);
copy_payload::<BodyReadControl>(transport, &mut extensions);
extensions.insert(Arc::clone(server_ctx));
// The legacy access phase marks a request whose SigV4 signature its edge verified; here
// the gateway verified it, and only a verified caller has a principal.
if credentials.is_some() {
match get_request_auth_type_with_query(&headers, uri.query()) {
AuthType::Presigned => {
extensions.insert(VerifiedPresignedRequest);
extensions.insert(VerifiedSigV4Request);
}
AuthType::Signed => {
extensions.insert(VerifiedSigV4Request);
}
_ => {}
}
}
let scope = context.verified_scope();
let head = RequestHead {
method: context.method().clone(),
uri,
headers,
credentials,
region: scope.map(|scope| scope.region().to_owned()),
service: scope.map(|scope| scope.service().to_owned()),
};
Ok(Self::from_parts(head, extensions))
}
}
/// The request target as it arrived: the raw path and query, with the scheme and authority when
/// the transport carried them (an absolute-form target, or HTTP/2).
fn request_uri(context: &RequestContextView) -> S3Result<Uri> {
let path_and_query = match context.raw_query() {
"" => context.raw_path().to_owned(),
query => format!("{}?{query}", context.raw_path()),
};
let builder = match (context.target_scheme(), context.target_authority()) {
(Some(scheme), Some(authority)) => Uri::builder().scheme(scheme).authority(authority),
_ => Uri::builder(),
};
builder
.path_and_query(path_and_query)
.build()
.map_err(|_| S3Error::with_message(S3ErrorCode::InternalError, "the accepted request target is not a URI"))
}
/// The caller's credentials as the app layer holds them. `secret_key` is what the gateway handed
/// over, which is nothing unless the operation opted in.
fn request_credentials(access_key: &str, secret_key: Option<&[u8]>, session_token: Option<&str>) -> S3Result<RequestCredentials> {
let session_token = session_token.map(str::to_owned);
let Some(secret_key) = secret_key else {
return Ok(RequestCredentials::without_secret_key(access_key.to_owned(), session_token));
};
let secret_key = std::str::from_utf8(secret_key)
.map_err(|_| S3Error::with_message(S3ErrorCode::InternalError, "the caller's secret key is not text"))?;
// The gateway refuses a credential whose secret is empty, so a handed-over secret is never
// empty. Should one arrive, the request is refused rather than served with a secret that
// every stored secret would have to be compared against.
RequestCredentials::new(access_key.to_owned(), secret_key.to_owned(), session_token)
.map_err(|_| S3Error::with_message(S3ErrorCode::InternalError, "the caller's secret key is empty"))
}
/// Copies the payload of type `T` a layer in front of the gateway attached, when one did.
fn copy_payload<T: Clone + Send + Sync + 'static>(transport: &TransportExtensions, extensions: &mut Extensions) {
if let Some(payload) = transport.get::<T>() {
extensions.insert(payload.clone());
}
}
#[cfg(test)]
mod tests {
use super::*;
use crate::server::gateway_handlers::error::handler_error;
use bytes::Bytes;
use http::{HeaderValue, Method, Request, StatusCode};
use http_body_util::{BodyExt, Empty};
use rustfs_gateway::sig::{AmzDate, PayloadMode, SigService, SigV4Signer, SigningCredentials, SigningRequest, SigningScope};
use rustfs_gateway::{
Credentials, Handler, HandlerResult, Limits, RegionSet, Req, Resp, ServiceBuilder, SigV4Authenticator, StaticCredentials,
WireRequest, allow_when, dto,
};
use std::net::{IpAddr, SocketAddr};
use std::sync::Mutex;
use std::time::Instant;
const PEER: ([u8; 4], u16) = ([10, 0, 0, 7], 41000);
const CLIENT: [u8; 4] = [203, 0, 113, 9];
const REQUEST_ID: &str = "envelope-request-id";
const SIGNER_ACCESS_KEY: &str = "AKIAENVELOPESIGNER";
const SIGNER_SECRET_KEY: &str = "envelope-signer-secret-key-0123456789";
/// Records the envelope the gateway edge builds for the request it is handed.
struct Probe {
server_ctx: Arc<ServerContextSlot>,
seen: Mutex<Option<RequestEnvelope>>,
}
impl Handler<dto::ListBuckets> for Probe {
async fn call(&self, request: Req<dto::ListBuckets>) -> HandlerResult<dto::ListBuckets> {
let envelope = RequestEnvelope::from_gateway(request.context(), &self.server_ctx).map_err(handler_error)?;
*self.seen.lock().expect("probe lock") = Some(envelope);
Ok(Resp::new(dto::ListBucketsOutput::default()))
}
}
/// Sends `request` through a gateway whose only handler is the probe, and returns what the
/// probe built. The test authorizer admits the one probed operation and nothing else.
async fn envelope_of(request: Request<Empty<Bytes>>, server_ctx: &Arc<ServerContextSlot>) -> RequestEnvelope {
let probe = Arc::new(Probe {
server_ctx: Arc::clone(server_ctx),
seen: Mutex::new(None),
});
let regions = RegionSet::new(["us-east-1"]).expect("a region");
let service = ServiceBuilder::new()
.rustfs_profile()
.authenticator(SigV4Authenticator::new(Arc::new(signer_credentials()), regions).rustfs_profile())
.authorizer(allow_when(|request| request.operation == "ListBuckets"))
.register::<dto::ListBuckets, _>(Arc::clone(&probe))
.build()
.expect("the probe service assembles");
let response = service.call(request).await;
let status = response.status();
if status != StatusCode::OK {
let body = response
.into_body()
.collect()
.await
.map(|body| body.to_bytes())
.unwrap_or_default();
panic!("the probe must be reached: {status} {}", String::from_utf8_lossy(&body));
}
probe
.seen
.lock()
.expect("probe lock")
.take()
.expect("the probe saw the request")
}
/// The one caller the probe service knows.
fn signer_credentials() -> StaticCredentials {
StaticCredentials::new().with(Credentials::new(SIGNER_ACCESS_KEY, SIGNER_SECRET_KEY.as_bytes()).expect("a valid key"))
}
/// A ListBuckets request header-signed now by the probe service's one caller.
fn signed_list_buckets() -> Request<Empty<Bytes>> {
let mut headers = HeaderMap::new();
headers.insert(http::header::HOST, HeaderValue::from_static("localhost"));
let probe = list_buckets_request("/").body(Bytes::new()).expect("static request");
let accepted = WireRequest::accept(probe, &Limits::default()).expect("an acceptable host");
let stamp = AmzDate::parse(&chrono::Utc::now().format("%Y%m%dT%H%M%SZ").to_string()).expect("a stamp");
let scope = SigningScope::new(stamp.day(), "us-east-1", SigService::S3).expect("a scope");
let credentials = SigningCredentials::new(SIGNER_ACCESS_KEY, SIGNER_SECRET_KEY.as_bytes()).expect("credentials");
let mut signer = SigV4Signer::new(credentials, scope);
let method = Method::GET;
let signing = SigningRequest::new(
&method,
"/",
"",
&headers,
accepted.host().raw_for_signing(),
PayloadMode::Unsigned,
stamp,
);
let signed = signer.sign_headers(&signing).expect("a signable request");
let mut builder = Request::builder().method(method).uri("/");
for (name, value) in signed.headers() {
builder = builder.header(name, value);
}
builder.body(Empty::new()).expect("a request")
}
fn list_buckets_request(target: &str) -> http::request::Builder {
Request::builder().method(Method::GET).uri(target).header("host", "localhost")
}
fn request_context() -> RequestContext {
RequestContext {
request_id: REQUEST_ID.to_owned(),
x_amz_request_id: REQUEST_ID.to_owned(),
trace_id: None,
span_id: None,
start_time: Instant::now(),
}
}
#[tokio::test]
async fn from_gateway_copies_every_fact_of_the_accepted_request() {
let server_ctx = ServerContextSlot::new();
let request = list_buckets_request("/?prefix=probe")
.header("x-envelope-probe", "probe")
.extension(Some(RemoteAddr(SocketAddr::from(PEER))))
.extension(ClientInfo::direct(SocketAddr::new(IpAddr::from(CLIENT), 443)))
.extension(NativeTlsTransport(true))
.extension(request_context())
.extension(BodyReadControl::default())
.body(Empty::new())
.expect("static request");
let envelope = envelope_of(request, &server_ctx).await;
assert_eq!(envelope.method(), Method::GET);
assert_eq!(envelope.uri().path(), "/");
assert_eq!(envelope.uri().query(), Some("prefix=probe"));
assert_eq!(envelope.headers().get("x-envelope-probe"), Some(&HeaderValue::from_static("probe")));
assert_eq!(envelope.remote_addr(), Some(SocketAddr::from(PEER)));
assert_eq!(envelope.client_info().map(|info| info.real_ip), Some(IpAddr::from(CLIENT)));
assert_eq!(envelope.native_tls_transport(), Some(true));
assert_eq!(envelope.request_context().map(|context| context.request_id.as_str()), Some(REQUEST_ID));
assert!(envelope.body_read_control().is_some(), "body_read_control");
assert!(
envelope.server_context().is_some_and(|slot| Arc::ptr_eq(slot, &server_ctx)),
"server_context"
);
assert!(envelope.residual_extensions().is_empty(), "every copied payload is a named field");
}
#[tokio::test]
async fn from_gateway_leaves_absent_payloads_none_and_an_anonymous_caller_unverified() {
let server_ctx = ServerContextSlot::new();
let request = list_buckets_request("/").body(Empty::new()).expect("static request");
let envelope = envelope_of(request, &server_ctx).await;
assert!(envelope.credentials().is_none(), "credentials");
assert_eq!(envelope.region(), None, "region");
assert_eq!(envelope.service(), None, "service");
assert_eq!(envelope.remote_addr(), None, "remote_addr");
assert!(envelope.client_info().is_none(), "client_info");
assert_eq!(envelope.native_tls_transport(), None, "native_tls_transport");
assert!(envelope.request_context().is_none(), "request_context");
assert!(envelope.body_read_control().is_none(), "body_read_control");
assert!(envelope.verified_sigv4().is_none(), "verified_sigv4");
assert!(envelope.verified_presigned().is_none(), "verified_presigned");
assert!(envelope.req_info().is_none(), "the access phase installs req_info, not the edge");
}
#[tokio::test]
async fn from_gateway_treats_a_peerless_remote_addr_as_absent() {
let server_ctx = ServerContextSlot::new();
let request = list_buckets_request("/")
.extension(None::<RemoteAddr>)
.body(Empty::new())
.expect("static request");
let envelope = envelope_of(request, &server_ctx).await;
assert_eq!(envelope.remote_addr(), None);
assert!(envelope.residual_extensions().is_empty(), "the peerless marker is consumed, not kept");
}
#[test]
fn credentials_carry_the_secret_only_when_the_gateway_handed_it_over() {
let kept = request_credentials("AKIAENVELOPE", None, Some("token")).expect("credentials");
assert_eq!(kept.access_key(), "AKIAENVELOPE");
assert!(kept.secret_key().is_none());
assert_eq!(kept.session_token(), Some("token"));
let handed = request_credentials("AKIAENVELOPE", Some(b"envelope-secret"), None).expect("credentials");
assert_eq!(handed.secret_key(), Some("envelope-secret"));
assert_eq!(handed.session_token(), None);
}
#[test]
fn an_empty_handed_over_secret_is_refused_instead_of_kept() {
let error = request_credentials("AKIAENVELOPE", Some(b""), None).expect_err("empty");
assert_eq!(error.code(), &S3ErrorCode::InternalError);
}
/// ListBuckets does not opt in to the caller's secret, so the gateway keeps it: the handler
/// sees who signed and no secret, and a reader that needs one is refused instead of being
/// handed an empty string to compare with.
#[tokio::test]
async fn an_operation_that_did_not_opt_in_reaches_the_handler_without_the_caller_s_secret() {
let server_ctx = ServerContextSlot::new();
let envelope = envelope_of(signed_list_buckets(), &server_ctx).await;
let credentials = envelope.credentials().expect("a signed request has a caller");
assert_eq!(credentials.access_key(), SIGNER_ACCESS_KEY);
assert!(credentials.secret_key().is_none(), "the secret stays with the gateway");
assert!(credentials.require_secret_key().is_err(), "a reader of the secret fails closed");
assert!(!credentials.secret_key_matches(""), "an absent secret equals no stored secret");
assert!(!credentials.secret_key_matches(SIGNER_SECRET_KEY));
}
#[test]
fn a_secret_that_is_not_text_is_refused_instead_of_dropped() {
let error = request_credentials("AKIAENVELOPE", Some(&[0xff, 0xfe]), None).expect_err("not text");
assert_eq!(error.code(), &S3ErrorCode::InternalError);
}
}
+174
View File
@@ -0,0 +1,174 @@
// Copyright 2024 RustFS Team
//
// Licensed under the Apache License, Version 2.0 (the "License");
// you may not use this file except in compliance with the License.
// You may obtain a copy of the License at
//
// http://www.apache.org/licenses/LICENSE-2.0
//
// Unless required by applicable law or agreed to in writing, software
// distributed under the License is distributed on an "AS IS" BASIS,
// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
// See the License for the specific language governing permissions and
// limitations under the License.
//! The one conversion of a RustFS error into the gateway's handler error.
//!
//! Responsible for: [`handler_error`], called by every gateway handler and by nothing else.
//! NOT responsible for: choosing an error (the use case's), or writing it (the gateway renders the
//! document, the status and the request identifiers).
//! Upstream: `rustfs_s3_types::S3Error`. Downstream: `rustfs_gateway::HandlerError`.
//!
//! The gateway's error carries a code with its status, a message, and response headers from a
//! closed set. An error this function cannot carry whole is answered `500 InternalError` rather
//! than sent with a member missing: a `416` without its `Content-Range`, or a throttle without
//! its `Retry-After`, tells a client something RustFS did not say. Each operation slice that
//! raises a header not listed in [`error_header`] adds it there, with its test.
use http::{HeaderName, HeaderValue, StatusCode};
use rustfs_gateway::{ErrorHeader, HandlerError};
use rustfs_gateway_types::ErrorCode;
use rustfs_s3_types::S3Error;
use std::borrow::Cow;
/// Answered when an error names a code without a status: the raiser of a custom code must set one.
const MISSING_STATUS: &str = "the error carries a code without a status";
/// Answered when an error carries a response header this edge cannot write.
const UNWRITABLE_HEADER: &str = "the error carries a response header the gateway cannot write";
/// Converts a use-case error into the error the gateway answers with: the same code, status and
/// message, and every response header it carries.
pub(crate) fn handler_error(error: S3Error) -> HandlerError {
let parts = error.into_parts();
let Some(status) = parts.status.or_else(|| parts.code.status_code()) else {
return HandlerError::internal_error(MISSING_STATUS);
};
let mut mapped = HandlerError::new(error_code(parts.code.as_str(), status), parts.message.unwrap_or(Cow::Borrowed("")));
for (name, value) in parts.headers.iter().flatten() {
let Some(header) = error_header(name, value) else {
return HandlerError::internal_error(UNWRITABLE_HEADER);
};
mapped = mapped.with_header(header);
}
mapped
}
/// The gateway's code for `name` answered with `status`: its own declared code when both agree,
/// otherwise a code with exactly the spelling and status RustFS chose.
fn error_code(name: &str, status: StatusCode) -> ErrorCode {
match ErrorCode::known(name) {
Some(declared) if declared.default_status() == status => declared,
_ => ErrorCode::custom(name.to_owned(), status),
}
}
/// The gateway's spelling of one error response header, or `None` for a header it cannot write.
fn error_header(name: &HeaderName, value: &HeaderValue) -> Option<ErrorHeader> {
if name == http::header::RETRY_AFTER {
let seconds = value.to_str().ok()?.parse().ok()?;
return Some(ErrorHeader::RetryAfter { seconds });
}
None
}
#[cfg(test)]
mod tests {
use super::*;
use http::HeaderMap;
use rustfs_s3_types::S3ErrorCode;
#[test]
fn a_declared_code_keeps_its_spelling_status_and_message() {
let mapped = handler_error(S3Error::with_message(S3ErrorCode::AccessDenied, "Access Denied"));
assert_eq!(mapped.code().as_str(), "AccessDenied");
assert_eq!(mapped.code().default_status(), StatusCode::FORBIDDEN);
assert_eq!(mapped.message(), "Access Denied");
assert!(mapped.headers().is_empty());
}
#[test]
fn an_internal_error_stays_a_server_fault() {
let mapped = handler_error(S3Error::with_message(S3ErrorCode::InternalError, "Not init"));
assert_eq!(mapped.code().as_str(), "InternalError");
assert_eq!(mapped.code().default_status(), StatusCode::INTERNAL_SERVER_ERROR);
assert_eq!(mapped.message(), "Not init");
}
#[test]
fn an_explicit_status_overrides_the_declared_one() {
let mut error = S3Error::with_message(S3ErrorCode::AccessDenied, "locked");
error.set_status_code(StatusCode::CONFLICT);
let mapped = handler_error(error);
assert_eq!(mapped.code().as_str(), "AccessDenied");
assert_eq!(mapped.code().default_status(), StatusCode::CONFLICT);
}
#[test]
fn a_custom_code_keeps_the_status_its_raiser_set() {
let mut error = S3Error::with_message(S3ErrorCode::Custom("RustFsOnly".into()), "custom");
error.set_status_code(StatusCode::SERVICE_UNAVAILABLE);
let mapped = handler_error(error);
assert_eq!(mapped.code().as_str(), "RustFsOnly");
assert_eq!(mapped.code().default_status(), StatusCode::SERVICE_UNAVAILABLE);
assert_eq!(mapped.message(), "custom");
}
#[test]
fn a_custom_code_without_a_status_is_a_server_fault_not_a_guess() {
let mapped = handler_error(S3Error::with_message(S3ErrorCode::Custom("RustFsOnly".into()), "custom"));
assert_eq!(mapped.code().as_str(), "InternalError");
assert_eq!(mapped.code().default_status(), StatusCode::INTERNAL_SERVER_ERROR);
assert_eq!(mapped.message(), MISSING_STATUS);
}
#[test]
fn a_missing_message_is_not_invented() {
let mapped = handler_error(S3Error::new(S3ErrorCode::AccessDenied));
assert_eq!(mapped.code().as_str(), "AccessDenied");
assert_eq!(mapped.message(), "");
}
#[test]
fn a_retry_after_header_is_carried() {
let mut headers = HeaderMap::new();
headers.insert(http::header::RETRY_AFTER, HeaderValue::from_static("7"));
let mut error = S3Error::with_message(S3ErrorCode::SlowDown, "busy");
error.set_headers(headers);
let mapped = handler_error(error);
assert_eq!(mapped.code().as_str(), "SlowDown");
assert_eq!(mapped.headers(), [ErrorHeader::RetryAfter { seconds: 7 }]);
}
#[test]
fn a_header_the_gateway_cannot_write_fails_the_whole_error() {
let mut headers = HeaderMap::new();
headers.insert("x-rustfs-unlisted", HeaderValue::from_static("value"));
let mut error = S3Error::with_message(S3ErrorCode::AccessDenied, "denied");
error.set_headers(headers);
let mapped = handler_error(error);
assert_eq!(mapped.code().as_str(), "InternalError");
assert_eq!(mapped.message(), UNWRITABLE_HEADER);
assert!(mapped.headers().is_empty());
}
#[test]
fn an_unreadable_retry_after_fails_the_whole_error() {
let mut headers = HeaderMap::new();
headers.insert(http::header::RETRY_AFTER, HeaderValue::from_static("soon"));
let mut error = S3Error::with_message(S3ErrorCode::SlowDown, "busy");
error.set_headers(headers);
assert_eq!(handler_error(error).message(), UNWRITABLE_HEADER);
}
}
+68
View File
@@ -0,0 +1,68 @@
// Copyright 2024 RustFS Team
//
// Licensed under the Apache License, Version 2.0 (the "License");
// you may not use this file except in compliance with the License.
// You may obtain a copy of the License at
//
// http://www.apache.org/licenses/LICENSE-2.0
//
// Unless required by applicable law or agreed to in writing, software
// distributed under the License is distributed on an "AS IS" BASIS,
// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
// See the License for the specific language governing permissions and
// limitations under the License.
//! The S3 operations the gateway stack serves, one file per operation (rustfs/backlog#2734).
//!
//! Responsible for: [`GatewayBackend`], the one backend every operation is implemented on, and
//! [`register`], the explicit list of what is registered. An operation that is not in that list
//! has no handler, and the gateway answers it `501 NotImplemented`.
//! NOT responsible for: assembling the service (`server/gateway_stack.rs`), authenticating or
//! routing a request (the gateway), or any S3 behaviour: a handler converts and delegates, and
//! the RustFS use case it calls is the one the legacy stack calls.
//! Upstream: the gateway's dispatch. Downstream: `crate::app` use cases.
//!
//! # The shape every handler has
//!
//! `<family>/<snake_op>.rs` holds exactly one `impl Handler<Op> for GatewayBackend`, in four
//! steps and nothing else:
//!
//! 1. build the [`RequestEnvelope`](crate::app::RequestEnvelope) with `from_gateway`;
//! 2. run the access phase: [`access::check`], then the operation's own access hook, which is
//! the authoritative authorization and runs exactly where the legacy stack runs it;
//! 3. call the use case with the envelope and the gateway's own input type;
//! 4. map a refusal with [`error::handler_error`], the only place an error is converted.
//!
//! The gateway's `Authorizer` (`server/gateway_stack/authorizer.rs`) is an earlier gate in front
//! of step 2 and never a replacement for it.
pub(crate) mod access;
mod bucket;
mod envelope;
pub(crate) mod error;
use crate::runtime_sources::ServerContextSlot;
use rustfs_gateway::{ServiceBuilder, dto};
use std::sync::Arc;
/// The backend every gateway operation is implemented on: the server whose use cases answer.
pub(crate) struct GatewayBackend {
server_ctx: Arc<ServerContextSlot>,
}
impl GatewayBackend {
pub(crate) fn new(server_ctx: Arc<ServerContextSlot>) -> Self {
Self { server_ctx }
}
pub(crate) fn server_ctx(&self) -> &Arc<ServerContextSlot> {
&self.server_ctx
}
}
/// Registers every operation the gateway stack serves. Each slice adds one line here and one row
/// to the authorization table; the census in `server/gateway_stack/authorizer.rs` holds the two
/// lists equal.
pub(crate) fn register(builder: ServiceBuilder, backend: &Arc<GatewayBackend>) -> ServiceBuilder {
builder.register::<dto::ListBuckets, _>(Arc::clone(backend))
}
+323
View File
@@ -0,0 +1,323 @@
// Copyright 2024 RustFS Team
//
// Licensed under the Apache License, Version 2.0 (the "License");
// you may not use this file except in compliance with the License.
// You may obtain a copy of the License at
//
// http://www.apache.org/licenses/LICENSE-2.0
//
// Unless required by applicable law or agreed to in writing, software
// distributed under the License is distributed on an "AS IS" BASIS,
// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
// See the License for the specific language governing permissions and
// limitations under the License.
//! The gateway S3 stack of one server: its assembly, and the facts the host hands every request
//! (rustfs/backlog#2734 T2.5).
//!
//! Responsible for: [`GatewayStack::assemble`], the one place the `rustfs-gateway` service is
//! built for RustFS — the RustFS profile, signature verification against RustFS IAM, the RustFS
//! authorizer, explicit deadlines, and the registered handlers — and [`GatewayStack::call`],
//! which attaches the host's facts to a request before the gateway accepts it.
//! NOT responsible for: choosing the stack (`server/stack.rs`), the middleware around it
//! (`server/http.rs`), or any S3 behaviour (`server/gateway_handlers` and the use cases).
//! Upstream: `server/http.rs`. Downstream: `rustfs-gateway`, `rustfs-gateway-adapter`.
//!
//! # What the host keeps
//!
//! RustFS's own layers stay in front of the gateway and the gateway's counterparts stay off
//! (rustfs/backlog#2771): CORS is answered by `ConditionalCorsLayer`, so no CORS source is
//! installed and the gateway writes no CORS header; the SSE-C transport layer runs first and the
//! gateway's own strict gate stays behind it; and the request identifier is the one
//! `ExternalRequestContextLayer` assigned, handed over as the gateway's `HostRequestId`, so an
//! answer and RustFS's logs name a request identically.
// The stack is under construction, so a build without debug assertions must not carry it. The
// message is checked by `scripts/check_gateway_stack_release_boundary.sh`.
#[cfg(not(debug_assertions))]
compile_error!("gateway-stack is restricted to debug builds");
mod authorizer;
use self::authorizer::{AUTHORIZATION_TABLE, OwnedDecisionCore, RequestLine, RustfsAuthorizer};
use crate::runtime_sources::{ServerContextSlot, current_action_credentials};
use crate::server::gateway_handlers::{GatewayBackend, register};
use crate::server::ssec_transport::is_secure_transport;
use crate::shared_types::{NativeTlsTransport, RemoteAddr};
use crate::storage_api::server::http::request_context::RequestContext;
use http::{Extensions, Request, Response};
use rustfs_config::RUSTFS_REGION;
use rustfs_gateway::{
AssemblyError, Authorizer, BoxFuture, ClientAddr, DEFAULT_MAX_BUFFERED_BODY_BYTES, HandlerDeadlineClass,
HandlerDeadlineConfig, MintedTraces, RegionSet, RequestBodyDeadlineConfig, ServiceBuilder, ServiceConfig, SigV4Authenticator,
SseConfig, TransportSecurity,
};
use rustfs_gateway_adapter::{
IamAdapters, IamKeyLookup, IamPrincipalLookup, RequestIdCarrier, RootCredentials, RootCredentialsError, RootSource,
host_request_id, rustfs_host_resolver,
};
use rustfs_iam::error::Error as IamError;
use rustfs_iam::manager::get_token_signing_key;
use rustfs_iam::store::object::ObjectStore;
use rustfs_iam::sys::IamSys;
use rustfs_policy::auth::UserIdentity;
use rustfs_trusted_proxies::ClientInfo;
use std::future::Future;
use std::sync::Arc;
use std::time::Duration;
/// What the assembly takes from the server it is built for.
pub(crate) struct GatewayAssembly {
pub(crate) server_ctx: Arc<ServerContextSlot>,
/// The configured root credentials, checked once here. Requests read the live ones.
pub(crate) root_access_key: String,
pub(crate) root_secret_key: String,
/// The configured region; the default region signs when none is configured.
pub(crate) region: Option<String>,
/// The virtual-hosted-style base domains of the S3 listener, as the legacy stack reads them.
pub(crate) server_domains: Vec<String>,
/// `RUSTFS_HTTP_REQUEST_BODY_READ_TIMEOUT`: the longest silence between two body reads. Zero
/// disables the bound, as it does on the legacy stack.
pub(crate) body_read_timeout: Duration,
/// Whether Keystone authentication is enabled in configuration (`RUSTFS_KEYSTONE_ENABLE`).
pub(crate) keystone_enabled: bool,
}
/// Whether Keystone authentication is switched on in configuration. A Keystone configuration
/// that cannot be read counts as switched on: only a readable configuration can say it is off.
pub(crate) fn keystone_enabled_in_configuration() -> bool {
rustfs_keystone::KeystoneConfig::from_env().map_or(true, |config| config.enable)
}
/// Why the gateway stack could not be assembled. Startup fails with it; the legacy stack is never
/// started in its place.
#[derive(Debug, thiserror::Error)]
pub(crate) enum GatewayAssemblyError {
#[error("the root credentials cannot verify signatures on the gateway stack: {0}")]
RootCredentials(RootCredentialsError),
#[error("region {region:?} cannot be a signing region on the gateway stack")]
Region { region: String },
#[error("the server domains cannot be served by the gateway stack: {0:?}")]
ServerDomains(rustfs_gateway::LegacyDomainError),
#[error("the gateway service refused its assembly: {0:?}")]
Service(AssemblyError),
#[error(
"RUSTFS_S3_STACK=gateway cannot be served while RUSTFS_KEYSTONE_ENABLE is on: the gateway admits a request that \
carries only X-Auth-Token as anonymous while RustFS reads the Keystone identity behind it; Keystone support on the \
gateway stack is rustfs/gateway#1586"
)]
KeystoneEnabled,
}
/// The assembled gateway service.
#[derive(Clone)]
pub(crate) struct GatewayStack {
service: rustfs_gateway::S3Service,
}
impl GatewayStack {
/// Assembles the gateway stack for one server.
///
/// # Errors
///
/// [`GatewayAssemblyError`] naming the input the gateway refused. The secret key is never
/// part of it.
pub(crate) fn assemble(assembly: GatewayAssembly) -> Result<Self, GatewayAssemblyError> {
let iam = Arc::new(ServerIam {
server_ctx: Arc::clone(&assembly.server_ctx),
});
let root = Arc::new(live_root(Arc::clone(&assembly.server_ctx)));
let core = OwnedDecisionCore::new(Arc::clone(&assembly.server_ctx));
let authorizer = RustfsAuthorizer::new(AUTHORIZATION_TABLE, Arc::new(core));
Self::assemble_with(assembly, iam, root, authorizer)
}
fn assemble_with(
assembly: GatewayAssembly,
iam: Arc<dyn IamPrincipalLookup>,
root: Arc<dyn RootSource>,
authorizer: impl Authorizer,
) -> Result<Self, GatewayAssemblyError> {
// The pinned gateway admits a request that carries only `X-Auth-Token` as anonymous and
// runs no authenticator for it, while the RustFS code behind the gateway reads the
// Keystone identity: the request would be authorized as one caller and served as
// another. Refused until the gateway authenticates the token (rustfs/gateway#1586).
if assembly.keystone_enabled {
return Err(GatewayAssemblyError::KeystoneEnabled);
}
// A root the gateway could not verify a signature with is a startup error, never a
// server that silently has no root. Requests read the live root from `root`.
RootCredentials::new(&assembly.root_access_key, &assembly.root_secret_key, &assembly.root_secret_key)
.map_err(GatewayAssemblyError::RootCredentials)?;
let region = assembly.region.as_deref().unwrap_or(RUSTFS_REGION);
let regions = RegionSet::new([region]).map_err(|_| GatewayAssemblyError::Region {
region: region.to_owned(),
})?;
let hosts = rustfs_host_resolver(&assembly.server_domains).map_err(GatewayAssemblyError::ServerDomains)?;
let backend = Arc::new(GatewayBackend::new(Arc::clone(&assembly.server_ctx)));
// Every legacy RustFS reading of a request, a credential scope and an answer, in the
// gateway's one reviewable preset; its other half is on the authenticator below.
let builder = ServiceBuilder::new().rustfs_profile();
// The credential provider and the policy source go in together, over one IAM and one
// live root, so a key cannot be root to one and an ordinary user to the other.
let builder = IamAdapters::new(iam, root)
.install(builder, |credentials| SigV4Authenticator::new(credentials, regions).rustfs_profile());
let builder = builder
.authorizer(authorizer)
// The outer SSE-C transport layer answers first; the gateway's own gate stays strict
// behind it.
.sse_config(SseConfig::strict())
.host_resolver(hosts)
// The fallback only: `attach_host_facts` hands RustFS's own identifier over.
.trace_source(MintedTraces::with_uuid_request_ids());
let (builder, _settings) = builder.config(service_config(assembly.body_read_timeout));
let service = register(builder, &backend).build().map_err(GatewayAssemblyError::Service)?;
Ok(Self { service })
}
/// The operations the assembled service answers, read from its registry. Everything else is
/// answered `501 NotImplemented`.
pub(crate) fn registered_operations(&self) -> Vec<&'static str> {
self.service.operations().collect()
}
/// Answers one request on the gateway stack, with the host's facts attached.
pub(crate) fn call<B>(&self, mut request: Request<B>) -> impl Future<Output = Response<rustfs_gateway::Body>> + Send + 'static
where
B: http_body::Body + Send + 'static,
B::Data: Send,
B::Error: Into<Box<dyn std::error::Error + Send + Sync>>,
{
// The authorizer is handed the headers and the query but not the request line, and the
// shared decision core is asked about the request as it arrived.
let line = RequestLine {
method: request.method().clone(),
uri: request.uri().clone(),
};
request.extensions_mut().insert(line);
attach_host_facts(request.extensions_mut());
let mut service = self.service.clone();
let answer = tower::Service::call(&mut service, request);
async move {
match answer.await {
Ok(response) => response,
Err(never) => match never {},
}
}
}
}
/// The gateway's request settings for RustFS, every deadline stated instead of inherited.
///
/// No handler runs under a total deadline, object data included: the legacy stack has none, and a
/// large transfer must not be cut off for its duration. A committed answer is not bounded either.
/// The request body keeps RustFS's own idle bound and no throughput floor.
fn service_config(body_read_timeout: Duration) -> ServiceConfig {
let handlers = HandlerDeadlineConfig::default()
.without_deadline(HandlerDeadlineClass::Standard)
.without_deadline(HandlerDeadlineClass::Extended)
.without_commit_progress_deadline();
ServiceConfig::new(DEFAULT_MAX_BUFFERED_BODY_BYTES)
.with_handler_deadlines(handlers)
.with_request_body_deadlines(body_deadlines(body_read_timeout))
}
/// RustFS's body read timeout as the gateway's idle deadlines: the same silence is allowed before
/// the first byte and between reads, and zero lifts both.
fn body_deadlines(read_timeout: Duration) -> RequestBodyDeadlineConfig {
RequestBodyDeadlineConfig::new(read_timeout, read_timeout)
.unwrap_or(RequestBodyDeadlineConfig::S3.without_idle_deadlines())
.without_throughput_floor()
}
/// Attaches what the gateway reads about a request from its host: whether the transport was
/// secure, the client address after RustFS's trusted-proxy correction, and RustFS's request
/// identifier. Each is derived from what RustFS's own layers already attached; no header is read.
fn attach_host_facts(extensions: &mut Extensions) {
let client_info = extensions.get::<ClientInfo>();
let native_tls = extensions.get::<NativeTlsTransport>().is_some_and(|transport| transport.0);
let security = if is_secure_transport(native_tls, client_info) {
TransportSecurity::Encrypted
} else {
TransportSecurity::Plaintext
};
let client_ip = client_info.map(|info| info.real_ip).or_else(|| {
extensions
.get::<Option<RemoteAddr>>()
.and_then(|peer| peer.as_ref().map(|peer| peer.0.ip()))
});
// An identifier outside the gateway's alphabet is not handed over; the gateway mints its own.
let request_id = extensions.get::<RequestContext>().and_then(host_request_id);
extensions.insert(security);
if let Some(client_ip) = client_ip {
extensions.insert(ClientAddr::from_peer(client_ip));
}
if let Some(request_id) = request_id {
extensions.insert(request_id);
}
}
/// The identifier the outer layer assigned is the one the gateway is handed.
impl RequestIdCarrier for RequestContext {
fn request_id(&self) -> &str {
&self.request_id
}
}
/// The root credentials of one server as they are now, read on every call from where the legacy
/// stack reads them, so a root change reaches both stacks at once. `None` while they are not
/// initialized or cannot verify a signature, which the adapters answer as unavailable.
fn live_root(server_ctx: Arc<ServerContextSlot>) -> impl Fn() -> Option<Arc<RootCredentials>> + Send + Sync + 'static {
move || {
let root = match server_ctx.app_context() {
Some(context) => context.action_credentials().get(),
None => current_action_credentials(),
}?;
// IAM signs STS session tokens with its token-signing key, which is the root secret
// until IAM has published one of its own.
let signing_key = get_token_signing_key().unwrap_or_else(|| root.secret_key.clone());
RootCredentials::new(&root.access_key, &root.secret_key, &signing_key)
.ok()
.map(Arc::new)
}
}
/// The IAM system of one server, looked up when a credential is: IAM is installed after the
/// listener starts, so the assembly cannot hold a handle.
struct ServerIam {
server_ctx: Arc<ServerContextSlot>,
}
impl ServerIam {
fn ready(&self) -> Option<Arc<IamSys<ObjectStore>>> {
self.server_ctx
.app_context()
.filter(|context| context.iam().is_ready())
.map(|context| context.iam().handle())
}
}
impl IamKeyLookup for ServerIam {
fn is_ready(&self) -> bool {
self.ready().is_some()
}
fn check_key<'a>(&'a self, access_key: &'a str) -> BoxFuture<'a, Result<(Option<UserIdentity>, bool), IamError>> {
Box::pin(async move {
let Some(iam) = self.ready() else {
return Err(IamError::IamSysNotInitialized);
};
iam.check_key(access_key).await
})
}
}
impl IamPrincipalLookup for ServerIam {
fn group_memberships(&self, user: &str) -> Vec<String> {
self.ready().map(|iam| iam.user_group_memberships(user)).unwrap_or_default()
}
}
#[cfg(test)]
mod tests;
@@ -0,0 +1,687 @@
// Copyright 2024 RustFS Team
//
// Licensed under the Apache License, Version 2.0 (the "License");
// you may not use this file except in compliance with the License.
// You may obtain a copy of the License at
//
// http://www.apache.org/licenses/LICENSE-2.0
//
// Unless required by applicable law or agreed to in writing, software
// distributed under the License is distributed on an "AS IS" BASIS,
// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
// See the License for the specific language governing permissions and
// limitations under the License.
//! The gateway `Authorizer` of the RustFS assembly: an early gate, never the authorization.
//!
//! Responsible for: [`AUTHORIZATION_TABLE`], one row per registered operation, and
//! [`RustfsAuthorizer`], which answers both gateway authorization stages from it.
//! NOT responsible for: the authoritative decision. That is the legacy access hook in its owned
//! form, run by the operation's handler immediately before its use case
//! (`server/gateway_handlers`), where the legacy stack runs it; decisions, error codes and their
//! order are therefore the same code on both stacks (rustfs/backlog#2761).
//! Upstream: the gateway's route and input authorization stages. Downstream: the shared
//! authorization core, through [`DecisionCore`].
//!
//! # What this gate may do
//!
//! It may refuse a request the hook would certainly refuse too, and nothing else. It is never
//! the only check, and it never allows by default:
//!
//! - an operation without a row is denied;
//! - a `RouteDecidable` row asks the shared decision core the hook asks, with the same facts;
//! - a `DeferToHandlerHook` row evaluates only its [`RouteGate`], which names exactly what the
//! route stage can know, and leaves the rest to the hook;
//! - a `LegacyNoCheck` row is an operation whose legacy hook is empty, said so explicitly;
//! - a core that cannot answer is `Indeterminate`, which the gateway refuses.
//!
//! Plain rows therefore evaluate policy twice, once here and once in the hook. That is accepted
//! until it is measured.
//!
//! A row may be `RouteDecidable` only when its denial concerns the one routed resource and the
//! one routed action. An operation whose denial can concern a second resource (a copy source) or
//! a version-specific action (a versioned read) is a `DeferToHandlerHook` row: the hook writes
//! the denial record with the resource and action it actually refused, and an early refusal
//! here would record the wrong ones.
//!
//! # Deferred rows
//!
//! Every row that is not `RouteDecidable` is listed here, and the census below holds the table
//! to these two lists, so a deferral cannot be added without this section changing.
//!
//! `DeferToHandlerHook`:
//!
//! - `ListBuckets`: the legacy hook is empty and the use case decides per caller. It lists every
//! bucket for a caller allowed `s3:ListAllMyBuckets`, otherwise the buckets the caller may list
//! or locate, and refuses when there is none; that needs the bucket inventory. The route stage
//! refuses an anonymous caller, which the use case refuses with the same answer.
//!
//! `LegacyNoCheck`: none.
use crate::app::{RequestCredentials, RequestEnvelope, RequestHead, authorize_owned_request};
use crate::auth::get_session_token;
use crate::runtime_sources::ServerContextSlot;
use crate::shared_types::RemoteAddr;
use crate::storage_api::server::http::access::resolve_req_info;
use crate::storage_api::server::http::request_context::RequestContext;
use http::{Extensions, HeaderMap, Method, Uri};
use rustfs_gateway::{
Authorizer, AuthzRequest, BoxFuture, Decision, InputAuthzRequest, InputDecisions, RequestContext as GatewayRequestContext,
};
use rustfs_policy::policy::action::{Action, S3Action};
use rustfs_s3_types::{S3Error, S3ErrorCode, S3Result};
use rustfs_trusted_proxies::ClientInfo;
use std::net::SocketAddr;
use std::sync::Arc;
/// The resource an operation's action is asked about.
#[derive(Clone, Copy, Debug, PartialEq, Eq)]
pub(crate) enum ResourceForm {
/// The service itself: no bucket and no key.
Service,
/// One bucket.
#[cfg_attr(not(test), expect(dead_code, reason = "constructed by the first bucket-level row"))]
Bucket,
/// One object in one bucket.
#[cfg_attr(not(test), expect(dead_code, reason = "constructed by the first object-level row"))]
Object,
}
/// What a deferred row's route stage evaluates: only facts that do not depend on the body.
#[derive(Clone, Copy, Debug, PartialEq, Eq)]
pub(crate) enum RouteGate {
/// Refuses a request that presented no credentials. A request with a verified caller passes
/// to the hook, which decides.
AuthenticatedCaller,
}
/// How much of an operation's decision the route stage can make.
#[derive(Clone, Copy, Debug, PartialEq, Eq)]
pub(crate) enum RouteStage {
/// The route stage asks the shared decision core the same question, with the same facts, as
/// the hook.
#[cfg_attr(not(test), expect(dead_code, reason = "constructed by the first plain operation row"))]
RouteDecidable,
/// The route stage evaluates `gate` and the hook in the handler decides the rest.
DeferToHandlerHook {
/// Exactly what the route stage evaluates.
gate: RouteGate,
/// Why the route stage cannot decide the whole of it.
reason: &'static str,
},
/// The legacy hook for this operation is empty, so there is nothing to evaluate early.
#[cfg_attr(
not(test),
expect(dead_code, reason = "constructed by the row of an operation whose legacy hook is empty")
)]
LegacyNoCheck {
/// Why legacy checks nothing.
reason: &'static str,
},
}
/// The checks an operation's legacy hook performs beyond its one action, which the shared
/// decision core does not perform. There is no default: every row states this column.
#[derive(Clone, Copy, Debug, PartialEq, Eq)]
pub(crate) enum ExtraChecks {
/// The hook asks its one action and nothing else.
#[cfg_attr(not(test), expect(dead_code, reason = "constructed by the first plain operation row"))]
None,
/// The hook, or the use case it defers to, also performs these.
Performed(&'static [&'static str]),
}
/// One operation's authorization, as the legacy access hook performs it.
///
/// A struct literal names every column, so a row cannot leave one unspecified.
#[cfg_attr(
not(test),
expect(
dead_code,
reason = "the body-input and extra-check columns record what the handler hook does and are read by the census"
)
)]
#[derive(Clone, Copy, Debug)]
pub(crate) struct AuthorizationRow {
/// The operation, by the name it is registered under.
pub(crate) operation: &'static str,
/// The action the legacy hook asks, mapped from the operation and not from the gateway's
/// spelling of its action: the two differ for 22 operations, and legacy's is the baseline.
pub(crate) action: Action,
pub(crate) resource: ResourceForm,
pub(crate) route_stage: RouteStage,
/// The body-derived inputs the hook needs, which no route stage has.
pub(crate) body_inputs: &'static [&'static str],
pub(crate) extra_checks: ExtraChecks,
}
/// Every operation the gateway stack registers. Kept equal to the registered set by the census
/// in `server/gateway_stack.rs`.
pub(crate) static AUTHORIZATION_TABLE: &[AuthorizationRow] = &[AuthorizationRow {
operation: "ListBuckets",
action: Action::S3Action(S3Action::ListAllMyBucketsAction),
resource: ResourceForm::Service,
route_stage: RouteStage::DeferToHandlerHook {
gate: RouteGate::AuthenticatedCaller,
reason: "the use case decides per caller from the bucket inventory",
},
body_inputs: &[],
extra_checks: ExtraChecks::Performed(&[
"a caller without s3:ListAllMyBuckets sees the buckets it may list (s3:ListBucket) or locate (s3:GetBucketLocation), \
judged by IAM alone, and is refused when there is none",
]),
}];
/// The request line as it reached RustFS, attached by the host before the gateway accepts the
/// request. The gateway hands an authorizer the headers and the query, but neither the method
/// nor the target, and the shared core is asked about the request as it arrived.
#[derive(Clone, Debug)]
pub(crate) struct RequestLine {
pub(crate) method: Method,
pub(crate) uri: Uri,
}
/// The request facts the shared decision core is asked with, each copied from where the gateway
/// or a RustFS layer in front of it put it.
pub(crate) struct RouteFacts<'a> {
/// The access key the gateway verified; `None` for an anonymous request.
pub(crate) access_key: Option<&'a str>,
/// The bucket, key and version the gateway routed, when the request names them.
pub(crate) bucket: Option<&'a str>,
pub(crate) key: Option<&'a str>,
pub(crate) version_id: Option<&'a str>,
/// The accepted header lines; `None` when the gateway handed over none.
pub(crate) headers: Option<HeaderMap>,
pub(crate) request_line: Option<&'a RequestLine>,
pub(crate) client_info: Option<&'a ClientInfo>,
pub(crate) remote_addr: Option<SocketAddr>,
pub(crate) request_context: Option<&'a RequestContext>,
}
/// The shared authorization decision core, as the route stage of a `RouteDecidable` row asks it.
pub(crate) trait DecisionCore: Send + Sync + 'static {
/// Decides `row`'s action for the caller and resource of `facts`: `Ok` to allow,
/// `AccessDenied` to deny, and any other error when the core could not answer.
fn decide<'a>(&'a self, row: &'a AuthorizationRow, facts: &'a RouteFacts<'a>) -> BoxFuture<'a, S3Result<()>>;
}
/// The decision core both stacks share: the owned authorization entry point, asked about the
/// request the route stage sees.
///
/// The caller is resolved by the function the legacy access check resolves it with, and the
/// decision is `authorize_owned_request`, which the handler's access hook calls too. It is only
/// the policy decision: a row that needs a body-derived input or a composite check is not
/// `RouteDecidable`.
pub(crate) struct OwnedDecisionCore {
server_ctx: Arc<ServerContextSlot>,
}
impl OwnedDecisionCore {
pub(crate) fn new(server_ctx: Arc<ServerContextSlot>) -> Self {
Self { server_ctx }
}
async fn authorize(&self, row: &AuthorizationRow, facts: &RouteFacts<'_>) -> S3Result<()> {
let (Some(line), Some(headers)) = (facts.request_line, facts.headers.as_ref()) else {
return Err(unanswerable("the route stage was handed no request line or headers"));
};
let session_token = get_session_token(&line.uri, headers).unwrap_or_default().to_owned();
let mut req_info =
resolve_req_info(&self.server_ctx, facts.access_key, &session_token, facts.request_context.cloned()).await?;
match row.resource {
ResourceForm::Service => {}
ResourceForm::Bucket => req_info.bucket = Some(routed(facts.bucket)?),
ResourceForm::Object => {
req_info.bucket = Some(routed(facts.bucket)?);
req_info.object = Some(routed(facts.key)?);
req_info.version_id = facts.version_id.map(str::to_owned);
}
}
let credentials = facts.access_key.map(|access_key| {
let session_token = (!session_token.is_empty()).then(|| session_token.clone());
RequestCredentials::without_secret_key(access_key.to_owned(), session_token)
});
let mut extensions = Extensions::new();
extensions.insert(facts.remote_addr.map(RemoteAddr));
if let Some(client_info) = facts.client_info {
extensions.insert(client_info.clone());
}
if let Some(request_context) = facts.request_context {
extensions.insert(request_context.clone());
}
extensions.insert(Arc::clone(&self.server_ctx));
let head = RequestHead {
method: line.method.clone(),
uri: line.uri.clone(),
headers: headers.clone(),
credentials,
region: None,
service: None,
};
let mut envelope = RequestEnvelope::from_parts(head, extensions);
envelope.install_req_info(req_info);
authorize_owned_request(&mut envelope, row.action, None).await
}
}
impl DecisionCore for OwnedDecisionCore {
fn decide<'a>(&'a self, row: &'a AuthorizationRow, facts: &'a RouteFacts<'a>) -> BoxFuture<'a, S3Result<()>> {
Box::pin(self.authorize(row, facts))
}
}
/// The routed name a row's resource form requires. Its absence is a question the core cannot
/// answer, never a decision about some other resource.
fn routed(name: Option<&str>) -> S3Result<String> {
name.map(str::to_owned)
.ok_or_else(|| unanswerable("the route stage was handed no name for the row's resource"))
}
fn unanswerable(message: &'static str) -> S3Error {
S3Error::with_message(S3ErrorCode::InternalError, message)
}
/// What the table decides about one request by itself, and what it leaves to the core.
enum Question<'a> {
Decided(Decision),
AskCore(&'static AuthorizationRow, Box<RouteFacts<'a>>),
}
/// The RustFS implementation of the gateway's two authorization stages.
pub(crate) struct RustfsAuthorizer {
table: &'static [AuthorizationRow],
core: Arc<dyn DecisionCore>,
}
impl RustfsAuthorizer {
/// The authorizer over `table`, asking `core` for `RouteDecidable` rows.
pub(crate) fn new(table: &'static [AuthorizationRow], core: Arc<dyn DecisionCore>) -> Self {
Self { table, core }
}
/// Reads `operation`'s row. `facts` is built only for a row that asks the core.
fn question<'f>(&self, operation: &str, anonymous: bool, facts: impl FnOnce() -> RouteFacts<'f>) -> Question<'f> {
let table: &'static [AuthorizationRow] = self.table;
let Some(row) = table.iter().find(|row| row.operation == operation) else {
// No row, no answer to give: refused, never allowed.
return Question::Decided(Decision::Deny);
};
match row.route_stage {
RouteStage::RouteDecidable => Question::AskCore(row, Box::new(facts())),
RouteStage::DeferToHandlerHook { gate, .. } => Question::Decided(match gate {
RouteGate::AuthenticatedCaller if anonymous => Decision::Deny,
RouteGate::AuthenticatedCaller => Decision::Allow,
}),
RouteStage::LegacyNoCheck { .. } => Question::Decided(Decision::Allow),
}
}
async fn answer(&self, question: Question<'_>) -> Decision {
match question {
Question::Decided(decision) => decision,
Question::AskCore(row, facts) => core_decision(self.core.decide(row, &facts).await),
}
}
fn ask<'a>(&self, context: &GatewayRequestContext<'a>, request: &AuthzRequest<'a>) -> Question<'a> {
self.question(request.operation, request.identity.is_none(), || route_facts(context, request))
}
}
/// Reads the core's answer as a decision. Only an explicit denial is a `Deny`; a failure to
/// answer is `Indeterminate` and never an allowance.
fn core_decision(answer: S3Result<()>) -> Decision {
match answer {
Ok(()) => Decision::Allow,
Err(error) if error.code() == &S3ErrorCode::AccessDenied => Decision::Deny,
Err(_) => Decision::Indeterminate,
}
}
fn route_facts<'a>(context: &GatewayRequestContext<'a>, request: &AuthzRequest<'a>) -> RouteFacts<'a> {
let host = context.server_extensions();
RouteFacts {
access_key: request.identity.map(|identity| identity.access_key_id()),
bucket: request.bucket.map(|bucket| bucket.as_str()),
key: request.key.map(|key| key.as_str()),
version_id: request.version_id,
headers: context.headers().map(|accepted| {
let mut headers = HeaderMap::new();
for (name, value) in accepted.iter_raw() {
headers.append(name.clone(), value.clone());
}
headers
}),
request_line: host.get::<RequestLine>(),
client_info: host.get::<ClientInfo>(),
remote_addr: host
.get::<Option<RemoteAddr>>()
.and_then(|peer| peer.as_ref().map(|peer| peer.0)),
request_context: host.get::<RequestContext>(),
}
}
impl Authorizer for RustfsAuthorizer {
fn authorize_route<'a>(
&'a self,
context: &'a GatewayRequestContext<'a>,
request: &'a AuthzRequest<'a>,
) -> BoxFuture<'a, Decision> {
let question = self.ask(context, request);
Box::pin(self.answer(question))
}
fn authorize_input<'a>(
&'a self,
context: &'a GatewayRequestContext<'a>,
request: &'a InputAuthzRequest<'a>,
) -> BoxFuture<'a, InputDecisions> {
// `decide_all` visits every derived resource and then the visibility question, in that
// order; each is read from the table now and answered below, where the core is awaited.
let stage = self.ask(context, request.route());
let mut derived: Vec<Question<'a>> = request
.resources()
.iter()
.map(|resource| self.ask(context, resource))
.collect();
if let Some(visibility) = request.visibility() {
derived.push(self.ask(context, visibility));
}
Box::pin(async move {
let stage = self.answer(stage).await;
let mut answers = Vec::with_capacity(derived.len());
for question in derived {
answers.push(self.answer(question).await);
}
let mut answers = answers.into_iter();
request.decide_all(stage, |_| answers.next().unwrap_or(Decision::Deny))
})
}
}
#[cfg(test)]
mod tests {
use super::*;
use std::collections::BTreeSet;
use std::sync::Mutex;
/// The rows documented as `DeferToHandlerHook` in this file's header.
const DOCUMENTED_DEFERRED_ROWS: &[&str] = &["ListBuckets"];
/// The rows documented as `LegacyNoCheck` in this file's header.
const DOCUMENTED_NO_CHECK_ROWS: &[&str] = &[];
static PLAIN_TABLE: &[AuthorizationRow] = &[
AuthorizationRow {
operation: "HeadBucket",
action: Action::S3Action(S3Action::ListBucketAction),
resource: ResourceForm::Bucket,
route_stage: RouteStage::RouteDecidable,
body_inputs: &[],
extra_checks: ExtraChecks::None,
},
AuthorizationRow {
operation: "GetObjectTorrent",
action: Action::S3Action(S3Action::GetObjectAction),
resource: ResourceForm::Object,
route_stage: RouteStage::LegacyNoCheck {
reason: "the legacy hook is empty",
},
body_inputs: &[],
extra_checks: ExtraChecks::None,
},
];
/// A core that gives one scripted answer and records what it was asked.
struct ScriptedCore {
answer: fn() -> S3Result<()>,
asked: Mutex<Vec<(&'static str, Action, Option<String>)>>,
}
impl ScriptedCore {
fn answering(answer: fn() -> S3Result<()>) -> Arc<Self> {
Arc::new(Self {
answer,
asked: Mutex::new(Vec::new()),
})
}
}
impl DecisionCore for ScriptedCore {
fn decide<'a>(&'a self, row: &'a AuthorizationRow, facts: &'a RouteFacts<'a>) -> BoxFuture<'a, S3Result<()>> {
self.asked
.lock()
.expect("core lock")
.push((row.operation, row.action, facts.access_key.map(str::to_owned)));
let answer = (self.answer)();
Box::pin(async move { answer })
}
}
fn denied() -> S3Result<()> {
Err(S3Error::with_message(S3ErrorCode::AccessDenied, "Access Denied"))
}
fn unavailable() -> S3Result<()> {
Err(S3Error::with_message(S3ErrorCode::InternalError, "the policy store is unavailable"))
}
/// One request as a test asks about it.
struct Asked<'a> {
operation: &'a str,
facts: RouteFacts<'a>,
}
fn facts<'a>(operation: &'a str, access_key: Option<&'a str>) -> Asked<'a> {
Asked {
operation,
facts: RouteFacts {
access_key,
bucket: None,
key: None,
version_id: None,
headers: None,
request_line: None,
client_info: None,
remote_addr: None,
request_context: None,
},
}
}
async fn decision(table: &'static [AuthorizationRow], core: Arc<dyn DecisionCore>, asked: Asked<'_>) -> Decision {
let authorizer = RustfsAuthorizer::new(table, core);
let anonymous = asked.facts.access_key.is_none();
let question = authorizer.question(asked.operation, anonymous, || asked.facts);
authorizer.answer(question).await
}
/// The real decision core of a server that has no object store yet.
fn owned_core() -> Arc<dyn DecisionCore> {
Arc::new(OwnedDecisionCore::new(ServerContextSlot::new()))
}
fn head_bucket() -> RequestLine {
RequestLine {
method: Method::HEAD,
uri: Uri::from_static("/bucket"),
}
}
fn rows_where(predicate: fn(&RouteStage) -> bool) -> BTreeSet<&'static str> {
AUTHORIZATION_TABLE
.iter()
.filter(|row| predicate(&row.route_stage))
.map(|row| row.operation)
.collect()
}
#[tokio::test]
async fn an_operation_without_a_row_is_denied() {
let core = ScriptedCore::answering(|| Ok(()));
for operation in ["GetObject", "PutObject", "", "listbuckets"] {
let decided = decision(AUTHORIZATION_TABLE, core.clone(), facts(operation, Some("AKIDUSER0001"))).await;
assert_eq!(decided, Decision::Deny, "{operation:?}");
}
assert!(core.asked.lock().expect("core lock").is_empty(), "an unmapped operation asks nothing");
}
#[tokio::test]
async fn a_core_that_cannot_answer_is_indeterminate_never_an_allowance() {
let decided = decision(
PLAIN_TABLE,
ScriptedCore::answering(unavailable),
facts("HeadBucket", Some("AKIDUSER0001")),
)
.await;
assert_eq!(decided, Decision::Indeterminate);
}
#[tokio::test]
async fn the_owned_core_without_a_store_cannot_answer_and_never_allows() {
let line = head_bucket();
let mut asked = facts("HeadBucket", None);
asked.facts.bucket = Some("bucket");
asked.facts.headers = Some(HeaderMap::new());
asked.facts.request_line = Some(&line);
assert_eq!(decision(PLAIN_TABLE, owned_core(), asked).await, Decision::Indeterminate);
}
#[tokio::test]
async fn the_owned_core_refuses_a_request_the_host_did_not_describe() {
let line = head_bucket();
let mut without_a_line = facts("HeadBucket", None);
without_a_line.facts.bucket = Some("bucket");
without_a_line.facts.headers = Some(HeaderMap::new());
assert_eq!(decision(PLAIN_TABLE, owned_core(), without_a_line).await, Decision::Indeterminate);
let mut without_headers = facts("HeadBucket", None);
without_headers.facts.bucket = Some("bucket");
without_headers.facts.request_line = Some(&line);
assert_eq!(decision(PLAIN_TABLE, owned_core(), without_headers).await, Decision::Indeterminate);
}
#[tokio::test]
async fn the_owned_core_refuses_a_bucket_row_whose_request_names_no_bucket() {
let line = head_bucket();
let mut asked = facts("HeadBucket", None);
asked.facts.headers = Some(HeaderMap::new());
asked.facts.request_line = Some(&line);
assert_eq!(decision(PLAIN_TABLE, owned_core(), asked).await, Decision::Indeterminate);
}
#[tokio::test]
async fn a_core_denial_is_a_denial() {
let decided = decision(PLAIN_TABLE, ScriptedCore::answering(denied), facts("HeadBucket", Some("AKIDUSER0001"))).await;
assert_eq!(decided, Decision::Deny);
}
#[tokio::test]
async fn a_route_decidable_row_asks_the_core_its_legacy_action_for_the_verified_caller() {
let core = ScriptedCore::answering(|| Ok(()));
let decided = decision(PLAIN_TABLE, core.clone(), facts("HeadBucket", Some("AKIDUSER0001"))).await;
assert_eq!(decided, Decision::Allow);
assert_eq!(
*core.asked.lock().expect("core lock"),
[(
"HeadBucket",
Action::S3Action(S3Action::ListBucketAction),
Some("AKIDUSER0001".to_owned())
)]
);
}
#[tokio::test]
async fn a_deferred_row_refuses_an_anonymous_caller_without_asking_the_core() {
let core = ScriptedCore::answering(|| Ok(()));
assert_eq!(
decision(AUTHORIZATION_TABLE, core.clone(), facts("ListBuckets", None)).await,
Decision::Deny
);
assert_eq!(
decision(AUTHORIZATION_TABLE, core.clone(), facts("ListBuckets", Some("AKIDUSER0001"))).await,
Decision::Allow,
"a verified caller passes to the hook"
);
assert!(
core.asked.lock().expect("core lock").is_empty(),
"a deferred row decides nothing through the core"
);
}
#[tokio::test]
async fn a_no_check_row_is_allowed_only_because_its_row_says_so() {
let core = ScriptedCore::answering(denied);
assert_eq!(
decision(PLAIN_TABLE, core.clone(), facts("GetObjectTorrent", None)).await,
Decision::Allow
);
assert_eq!(decision(AUTHORIZATION_TABLE, core, facts("GetObjectTorrent", None)).await, Decision::Deny);
}
#[test]
fn the_deferred_rows_are_exactly_the_documented_ones() {
let deferred = rows_where(|stage| matches!(stage, RouteStage::DeferToHandlerHook { .. }));
assert_eq!(deferred, DOCUMENTED_DEFERRED_ROWS.iter().copied().collect::<BTreeSet<_>>());
}
#[test]
fn the_no_check_rows_are_exactly_the_documented_ones() {
let unchecked = rows_where(|stage| matches!(stage, RouteStage::LegacyNoCheck { .. }));
assert_eq!(unchecked, DOCUMENTED_NO_CHECK_ROWS.iter().copied().collect::<BTreeSet<_>>());
}
#[test]
fn every_row_states_every_column_and_names_one_operation() {
let mut seen = BTreeSet::new();
for row in AUTHORIZATION_TABLE {
assert!(seen.insert(row.operation), "{} has two rows", row.operation);
assert!(!row.operation.is_empty());
match row.route_stage {
RouteStage::DeferToHandlerHook { reason, .. } | RouteStage::LegacyNoCheck { reason } => {
assert!(!reason.is_empty(), "{} defers without a reason", row.operation);
}
RouteStage::RouteDecidable => {}
}
match row.extra_checks {
ExtraChecks::Performed(checks) => {
assert!(!checks.is_empty(), "{} lists no extra check; say `ExtraChecks::None`", row.operation);
assert!(checks.iter().all(|check| !check.is_empty()), "{}", row.operation);
}
ExtraChecks::None => {}
}
assert!(row.body_inputs.iter().all(|input| !input.is_empty()), "{}", row.operation);
}
}
#[test]
fn list_buckets_asks_the_legacy_action_on_the_service() {
let row = AUTHORIZATION_TABLE
.iter()
.find(|row| row.operation == "ListBuckets")
.expect("ListBuckets is registered");
assert_eq!(row.action, Action::S3Action(S3Action::ListAllMyBucketsAction));
assert_eq!(row.resource, ResourceForm::Service);
assert_eq!(
row.route_stage,
RouteStage::DeferToHandlerHook {
gate: RouteGate::AuthenticatedCaller,
reason: "the use case decides per caller from the bucket inventory",
}
);
assert!(row.body_inputs.is_empty());
assert!(matches!(row.extra_checks, ExtraChecks::Performed(_)));
}
}
+577
View File
@@ -0,0 +1,577 @@
// Copyright 2024 RustFS Team
//
// Licensed under the Apache License, Version 2.0 (the "License");
// you may not use this file except in compliance with the License.
// You may obtain a copy of the License at
//
// http://www.apache.org/licenses/LICENSE-2.0
//
// Unless required by applicable law or agreed to in writing, software
// distributed under the License is distributed on an "AS IS" BASIS,
// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
// See the License for the specific language governing permissions and
// limitations under the License.
//! The assembled gateway stack, driven through [`GatewayStack::call`] exactly as `server/http.rs`
//! drives it. Requests that need object storage are in `rustfs/tests/embedded_gateway_stack_test.rs`.
use super::authorizer::AUTHORIZATION_TABLE;
use super::*;
use bytes::Bytes;
use http::{HeaderMap, Method, StatusCode};
use http_body_util::{BodyExt, Empty};
use rustfs_gateway::{AuthzRequest, ClientFacts, Decision, HostRequestId, InputAuthzRequest, InputDecisions, NO_DEADLINE};
use std::collections::BTreeSet;
use std::net::{IpAddr, SocketAddr};
use std::sync::Mutex;
use std::time::Instant;
const ROOT_ACCESS_KEY: &str = "rustfsgatewayroot";
const ROOT_SECRET_KEY: &str = "rustfs-gateway-root-secret";
const REQUEST_ID: &str = "7c9e6679-7425-40de-944b-e07fc1f90ae7";
const PEER: ([u8; 4], u16) = ([10, 0, 0, 7], 41000);
const CLIENT: [u8; 4] = [203, 0, 113, 9];
const EMPTY_SHA256: &str = "e3b0c44298fc1c149afbf4c8996fb92427ae41e4649b934ca495991b7852b855";
fn assembly() -> GatewayAssembly {
GatewayAssembly {
server_ctx: ServerContextSlot::new(),
root_access_key: ROOT_ACCESS_KEY.to_owned(),
root_secret_key: ROOT_SECRET_KEY.to_owned(),
region: Some("us-east-1".to_owned()),
server_domains: Vec::new(),
body_read_timeout: Duration::from_secs(300),
keystone_enabled: false,
}
}
/// An IAM whose readiness and answer are scripted.
struct ScriptedIam {
ready: bool,
}
impl IamKeyLookup for ScriptedIam {
fn is_ready(&self) -> bool {
self.ready
}
fn check_key<'a>(&'a self, _access_key: &'a str) -> BoxFuture<'a, Result<(Option<UserIdentity>, bool), IamError>> {
Box::pin(async { Ok((None, false)) })
}
}
impl IamPrincipalLookup for ScriptedIam {
fn group_memberships(&self, _user: &str) -> Vec<String> {
Vec::new()
}
}
/// A settable live root, standing in for the server's runtime credentials.
#[derive(Clone)]
struct LiveRoot(Arc<Mutex<Option<Arc<RootCredentials>>>>);
impl LiveRoot {
fn set(&self, root: RootCredentials) {
*self.0.lock().expect("root lock") = Some(Arc::new(root));
}
fn clear(&self) {
*self.0.lock().expect("root lock") = None;
}
fn source(&self) -> Arc<dyn RootSource> {
let cell = Arc::clone(&self.0);
Arc::new(move || cell.lock().expect("root lock").clone())
}
}
/// A live root holding the test root.
fn root() -> LiveRoot {
let root = RootCredentials::new(ROOT_ACCESS_KEY, ROOT_SECRET_KEY, ROOT_SECRET_KEY).expect("a usable root");
LiveRoot(Arc::new(Mutex::new(Some(Arc::new(root)))))
}
/// The authorizer production installs: the registered table over the shared decision core.
fn production_authorizer() -> RustfsAuthorizer {
RustfsAuthorizer::new(AUTHORIZATION_TABLE, Arc::new(OwnedDecisionCore::new(ServerContextSlot::new())))
}
/// The stack as production assembles it, over an IAM that knows no key but the root's.
fn stack_over(iam: ScriptedIam) -> GatewayStack {
let authorizer = production_authorizer();
GatewayStack::assemble_with(assembly(), Arc::new(iam), root().source(), authorizer).expect("the stack assembles")
}
fn request(method: Method, target: &str) -> http::request::Builder {
Request::builder().method(method).uri(target).header("host", "localhost")
}
/// A well-formed SigV4 header signature for `access_key` whose signature is not the right one.
fn signed_with_a_wrong_signature(builder: http::request::Builder, access_key: &str) -> http::request::Builder {
let now = jiff::Timestamp::now().strftime("%Y%m%dT%H%M%SZ").to_string();
let date = &now[..8];
builder
.header("x-amz-date", now.as_str())
.header("x-amz-content-sha256", EMPTY_SHA256)
.header(
"authorization",
format!(
"AWS4-HMAC-SHA256 Credential={access_key}/{date}/us-east-1/s3/aws4_request, \
SignedHeaders=host;x-amz-content-sha256;x-amz-date, Signature={}",
"0".repeat(64)
),
)
}
async fn answer(stack: &GatewayStack, builder: http::request::Builder) -> (StatusCode, HeaderMap, String) {
let response = stack.call(builder.body(Empty::<Bytes>::new()).expect("static request")).await;
let (parts, body) = response.into_parts();
let body = body.collect().await.expect("the answer is read").to_bytes();
(parts.status, parts.headers, String::from_utf8_lossy(&body).into_owned())
}
fn rustfs_request_context(request_id: &str) -> RequestContext {
RequestContext {
request_id: request_id.to_owned(),
x_amz_request_id: request_id.to_owned(),
trace_id: None,
span_id: None,
start_time: Instant::now(),
}
}
#[test]
fn every_registered_operation_has_an_authorization_row_and_every_row_an_operation() {
let stack = stack_over(ScriptedIam { ready: true });
let registered: BTreeSet<&str> = stack.registered_operations().into_iter().collect();
let mapped: BTreeSet<&str> = AUTHORIZATION_TABLE.iter().map(|row| row.operation).collect();
assert_eq!(registered, mapped);
assert_eq!(registered, BTreeSet::from(["ListBuckets"]), "the walking skeleton serves one operation");
}
#[test]
fn production_assembly_registers_what_the_test_assembly_does() {
let stack = GatewayStack::assemble(assembly()).expect("the stack assembles");
assert_eq!(stack.registered_operations(), ["ListBuckets"]);
}
#[test]
fn an_unusable_region_fails_the_assembly() {
let refused = GatewayStack::assemble(GatewayAssembly {
region: Some("Not A Region".to_owned()),
..assembly()
});
assert!(matches!(refused, Err(GatewayAssemblyError::Region { .. })), "{:?}", refused.err());
}
#[test]
fn an_unusable_root_access_key_fails_the_assembly_without_naming_the_secret() {
let refused = GatewayStack::assemble(GatewayAssembly {
root_access_key: String::new(),
..assembly()
});
let error = refused.err().expect("an empty access key verifies nothing");
assert!(
matches!(error, GatewayAssemblyError::RootCredentials(RootCredentialsError::InvalidAccessKey)),
"{error:?}"
);
for rendered in [error.to_string(), format!("{error:?}")] {
assert!(!rendered.contains(ROOT_SECRET_KEY), "{rendered}");
}
}
#[test]
fn a_missing_or_short_root_secret_fails_the_assembly() {
for weak in ["", "1234567"] {
let refused = GatewayStack::assemble(GatewayAssembly {
root_secret_key: weak.to_owned(),
..assembly()
});
assert!(
matches!(
refused.as_ref().err(),
Some(GatewayAssemblyError::RootCredentials(RootCredentialsError::WeakSecretKey))
),
"{} bytes",
weak.len()
);
}
}
#[tokio::test]
async fn a_root_change_reaches_the_next_request_and_a_withdrawn_root_signs_nothing() {
const ROTATED_ACCESS_KEY: &str = "rotatedgatewayroot";
let live = root();
let authorizer = production_authorizer();
let stack = GatewayStack::assemble_with(assembly(), Arc::new(ScriptedIam { ready: true }), live.source(), authorizer)
.expect("the stack assembles");
let signed_as = |access_key: &str| signed_with_a_wrong_signature(request(Method::GET, "/"), access_key);
let (_, _, known) = answer(&stack, signed_as(ROOT_ACCESS_KEY)).await;
assert!(known.contains("<Code>SignatureDoesNotMatch</Code>"), "the root key is known: {known}");
// The root access key changes: the old one is now just an unknown key, and the new one is
// known to the very next request.
live.set(RootCredentials::new(ROTATED_ACCESS_KEY, ROOT_SECRET_KEY, ROOT_SECRET_KEY).expect("a usable root"));
let (status, _, retired) = answer(&stack, signed_as(ROOT_ACCESS_KEY)).await;
assert_eq!(status, StatusCode::FORBIDDEN, "{retired}");
assert!(retired.contains("<Code>InvalidAccessKeyId</Code>"), "{retired}");
let (_, _, rotated) = answer(&stack, signed_as(ROTATED_ACCESS_KEY)).await;
assert!(
rotated.contains("<Code>SignatureDoesNotMatch</Code>"),
"the new root key is known: {rotated}"
);
// Injected: a root source that returns nothing, so the provider returns an error for the
// lookup. The key that was root a moment ago verifies nothing, and the fault is answered as
// one, `500`, as the legacy stack answers a failed lookup. Ledger entry R-068
// (rustfs/backlog#2684): the gateway's RustFS authenticator preset sets the switch of
// rustfs/gateway#1585; the assembly sets nothing of its own.
live.clear();
let (status, _, withdrawn) = answer(&stack, signed_as(ROTATED_ACCESS_KEY)).await;
assert_eq!(status, StatusCode::INTERNAL_SERVER_ERROR, "{withdrawn}");
assert!(withdrawn.contains("<Code>InternalError</Code>"), "{withdrawn}");
assert!(!withdrawn.contains("ListAllMyBucketsResult"), "{withdrawn}");
assert_fault_answer_names_nothing(&withdrawn, ROTATED_ACCESS_KEY);
}
#[test]
fn keystone_enabled_fails_the_assembly_and_names_both_settings() {
let refused = GatewayStack::assemble(GatewayAssembly {
keystone_enabled: true,
..assembly()
});
let error = refused.err().expect("the gateway stack is not served with Keystone enabled");
assert!(matches!(error, GatewayAssemblyError::KeystoneEnabled), "{error:?}");
let message = error.to_string();
for named in ["RUSTFS_S3_STACK=gateway", "RUSTFS_KEYSTONE_ENABLE", "rustfs/gateway#1586"] {
assert!(message.contains(named), "{named} is missing from: {message}");
}
}
#[test]
fn keystone_disabled_assembles() {
GatewayStack::assemble(GatewayAssembly {
keystone_enabled: false,
..assembly()
})
.expect("the gateway stack assembles without Keystone");
}
#[test]
fn keystone_is_read_from_configuration_and_an_unreadable_one_counts_as_enabled() {
const ENABLE: &str = "RUSTFS_KEYSTONE_ENABLE";
const AUTH_URL: &str = "RUSTFS_KEYSTONE_AUTH_URL";
temp_env::with_vars([(ENABLE, None::<&str>), (AUTH_URL, None)], || {
assert!(!keystone_enabled_in_configuration(), "unset is off");
});
temp_env::with_vars([(ENABLE, Some("false")), (AUTH_URL, None)], || {
assert!(!keystone_enabled_in_configuration(), "false is off");
});
temp_env::with_vars([(ENABLE, Some("true")), (AUTH_URL, Some("http://keystone.example.test:5000"))], || {
assert!(keystone_enabled_in_configuration(), "true is on");
});
temp_env::with_vars([(ENABLE, Some("true")), (AUTH_URL, None)], || {
assert!(keystone_enabled_in_configuration(), "on but unreadable is still on");
});
}
#[test]
fn no_handler_runs_under_a_total_deadline_and_the_body_keeps_the_rustfs_idle_bound() {
let config = service_config(Duration::from_secs(300));
assert_eq!(config.handler_deadline(HandlerDeadlineClass::Standard), NO_DEADLINE);
assert_eq!(config.handler_deadline(HandlerDeadlineClass::Extended), NO_DEADLINE);
assert_eq!(config.commit_progress_deadline(), NO_DEADLINE);
assert_eq!(config.request_body_deadlines().read_idle(), Duration::from_secs(300));
assert_eq!(config.request_body_deadlines().first_byte(), Duration::from_secs(300));
assert_eq!(config.request_body_deadlines().throughput_window(), NO_DEADLINE);
}
#[test]
fn a_disabled_body_read_timeout_lifts_the_idle_bound_instead_of_arming_zero() {
let deadlines = body_deadlines(Duration::ZERO);
assert_eq!(deadlines.read_idle(), NO_DEADLINE);
assert_eq!(deadlines.first_byte(), NO_DEADLINE);
}
#[test]
fn host_facts_come_from_what_rustfs_layers_attached() {
let peer = SocketAddr::from(PEER);
let mut extensions = Extensions::new();
extensions.insert(Some(RemoteAddr(peer)));
extensions.insert(ClientInfo::direct(SocketAddr::new(IpAddr::from(CLIENT), 443)));
extensions.insert(NativeTlsTransport(true));
extensions.insert(rustfs_request_context(REQUEST_ID));
attach_host_facts(&mut extensions);
assert_eq!(extensions.get::<TransportSecurity>(), Some(&TransportSecurity::Encrypted));
assert_eq!(
extensions.get::<ClientAddr>().map(|address| address.ip()),
Some(IpAddr::from(CLIENT)),
"the trusted-proxy-corrected address wins over the socket peer"
);
assert_eq!(
extensions
.get::<HostRequestId>()
.map(|id| id.request_id().as_str().to_owned()),
Some(REQUEST_ID.to_owned())
);
}
#[test]
fn host_facts_never_lean_towards_secure_or_invent_an_address() {
let mut bare = Extensions::new();
attach_host_facts(&mut bare);
assert_eq!(bare.get::<TransportSecurity>(), Some(&TransportSecurity::Plaintext));
assert!(bare.get::<ClientAddr>().is_none(), "no address is known");
assert!(bare.get::<HostRequestId>().is_none(), "no identifier is known");
let mut plaintext = Extensions::new();
plaintext.insert(Some(RemoteAddr(SocketAddr::from(PEER))));
plaintext.insert(NativeTlsTransport(false));
plaintext.insert(rustfs_request_context("not a request id"));
attach_host_facts(&mut plaintext);
assert_eq!(plaintext.get::<TransportSecurity>(), Some(&TransportSecurity::Plaintext));
assert_eq!(
plaintext.get::<ClientAddr>().map(|address| address.ip()),
Some(IpAddr::from(PEER.0)),
"without a proxy the socket peer is the client"
);
assert!(
plaintext.get::<HostRequestId>().is_none(),
"an identifier outside the alphabet is not handed over"
);
let mut peerless = Extensions::new();
peerless.insert(None::<RemoteAddr>);
attach_host_facts(&mut peerless);
assert!(peerless.get::<ClientAddr>().is_none());
}
/// Records what the gateway hands its authorizer about the client and the request line, and
/// refuses.
struct RecordingAuthorizer {
seen: Arc<Mutex<Option<Option<ClientFacts>>>>,
line: Arc<Mutex<Option<RequestLine>>>,
}
impl Authorizer for RecordingAuthorizer {
fn authorize_route<'a>(
&'a self,
context: &'a rustfs_gateway::RequestContext<'a>,
_request: &'a AuthzRequest<'a>,
) -> BoxFuture<'a, Decision> {
*self.seen.lock().expect("recording lock") = Some(context.client().copied());
*self.line.lock().expect("recording lock") = context.server_extensions().get::<RequestLine>().cloned();
Box::pin(async { Decision::Deny })
}
fn authorize_input<'a>(
&'a self,
_context: &'a rustfs_gateway::RequestContext<'a>,
request: &'a InputAuthzRequest<'a>,
) -> BoxFuture<'a, InputDecisions> {
let decisions = request.decide_all(Decision::Deny, |_| Decision::Deny);
Box::pin(async move { decisions })
}
}
#[tokio::test]
async fn the_authorizer_sees_the_client_facts_the_host_attached() {
let seen = Arc::new(Mutex::new(None));
let line = Arc::new(Mutex::new(None));
let authorizer = RecordingAuthorizer {
seen: Arc::clone(&seen),
line: Arc::clone(&line),
};
let stack = GatewayStack::assemble_with(assembly(), Arc::new(ScriptedIam { ready: true }), root().source(), authorizer)
.expect("assembles");
let proxied = request(Method::GET, "/?prefix=probe")
.extension(Some(RemoteAddr(SocketAddr::from(PEER))))
.extension(ClientInfo::direct(SocketAddr::new(IpAddr::from(CLIENT), 443)))
.extension(NativeTlsTransport(true));
let (status, _, _) = answer(&stack, proxied).await;
assert_eq!(status, StatusCode::FORBIDDEN);
let facts = seen
.lock()
.expect("recording lock")
.take()
.expect("the authorizer was asked")
.expect("the host attached client facts");
assert!(facts.transport_secure, "the listener terminated TLS");
assert_eq!(facts.client_ip, Some(IpAddr::from(CLIENT)));
assert_eq!(facts.source_ip(), Some(IpAddr::from(CLIENT)));
let line = line
.lock()
.expect("recording lock")
.take()
.expect("the host attached the request line");
assert_eq!(line.method, Method::GET);
assert_eq!(line.uri.path(), "/");
assert_eq!(line.uri.query(), Some("prefix=probe"));
}
#[tokio::test]
async fn the_authorizer_sees_a_cleartext_transport_as_cleartext() {
let seen = Arc::new(Mutex::new(None));
let line = Arc::new(Mutex::new(None));
let authorizer = RecordingAuthorizer {
seen: Arc::clone(&seen),
line: Arc::clone(&line),
};
let stack = GatewayStack::assemble_with(assembly(), Arc::new(ScriptedIam { ready: true }), root().source(), authorizer)
.expect("assembles");
let (status, _, _) = answer(&stack, request(Method::GET, "/").extension(NativeTlsTransport(false))).await;
assert_eq!(status, StatusCode::FORBIDDEN);
let facts = seen
.lock()
.expect("recording lock")
.take()
.expect("the authorizer was asked")
.expect("the transport declaration alone makes the facts present");
assert!(!facts.transport_secure);
assert_eq!(facts.client_ip, None);
}
#[tokio::test]
async fn an_anonymous_list_buckets_is_denied() {
let stack = stack_over(ScriptedIam { ready: true });
let (status, _, body) = answer(&stack, request(Method::GET, "/")).await;
assert_eq!(status, StatusCode::FORBIDDEN);
assert!(body.contains("<Code>AccessDenied</Code>"), "{body}");
}
#[tokio::test]
async fn an_unregistered_operation_is_not_implemented() {
let stack = stack_over(ScriptedIam { ready: true });
for (method, target) in [
(Method::GET, "/bucket/key"),
(Method::PUT, "/bucket"),
(Method::DELETE, "/bucket/key"),
] {
let (status, _, body) = answer(&stack, request(method.clone(), target)).await;
assert_eq!(status, StatusCode::NOT_IMPLEMENTED, "{method} {target}: {body}");
assert!(body.contains("<Code>NotImplemented</Code>"), "{method} {target}: {body}");
}
}
#[tokio::test]
async fn a_wrong_signature_is_a_signature_mismatch() {
let stack = stack_over(ScriptedIam { ready: true });
let (status, _, body) = answer(&stack, signed_with_a_wrong_signature(request(Method::GET, "/"), ROOT_ACCESS_KEY)).await;
assert_eq!(status, StatusCode::FORBIDDEN);
assert!(body.contains("<Code>SignatureDoesNotMatch</Code>"), "{body}");
assert!(!body.contains(ROOT_SECRET_KEY), "{body}");
}
#[tokio::test]
async fn an_unknown_access_key_is_refused_as_the_caller_s_fault() {
let stack = stack_over(ScriptedIam { ready: true });
let (status, _, body) = answer(&stack, signed_with_a_wrong_signature(request(Method::GET, "/"), "AKIDUNKNOWN0001")).await;
assert_eq!(status, StatusCode::FORBIDDEN, "{body}");
assert!(body.contains("<Code>InvalidAccessKeyId</Code>"), "{body}");
}
/// The answer to a credential-store fault names neither the key that was looked up, nor a secret,
/// nor why the lookup failed.
fn assert_fault_answer_names_nothing(body: &str, access_key: &str) {
assert!(!body.contains(access_key), "the looked-up key is not echoed: {body}");
assert!(!body.contains(ROOT_SECRET_KEY), "{body}");
let lowered = body.to_ascii_lowercase();
for detail in ["iam", "credential", "lookup", "store", "not ready", "unavailable", "root"] {
assert!(!lowered.contains(detail), "the answer says `{detail}`: {body}");
}
}
/// Injected: a credential provider that returns an error for the lookup of a non-root key.
///
/// The fault is answered as one, `500 InternalError`, as the legacy stack answers a failed lookup,
/// and not as an unknown key. Up to gateway pin 21283e87 this test observed `403
/// InvalidAccessKeyId`; pin 7915d069 changed the answer. Ledger entry R-068 (rustfs/backlog#2684): the gateway's RustFS
/// authenticator preset sets the switch of rustfs/gateway#1585; the assembly sets nothing of its
/// own. Nothing is served either way.
#[tokio::test]
async fn a_credential_lookup_that_fails_is_refused_and_never_served() {
let stack = stack_over(ScriptedIam { ready: false });
let (status, _, body) = answer(&stack, signed_with_a_wrong_signature(request(Method::GET, "/"), "AKIDUSER0001")).await;
assert_eq!(status, StatusCode::INTERNAL_SERVER_ERROR, "{body}");
assert!(body.contains("<Code>InternalError</Code>"), "{body}");
assert!(!body.contains("InvalidAccessKeyId"), "a store fault is not an unknown key: {body}");
assert_fault_answer_names_nothing(&body, "AKIDUSER0001");
assert!(!body.contains("ListAllMyBucketsResult"), "{body}");
}
#[tokio::test]
async fn the_root_key_verifies_while_iam_is_unavailable() {
let stack = stack_over(ScriptedIam { ready: false });
let (status, _, body) = answer(&stack, signed_with_a_wrong_signature(request(Method::GET, "/"), ROOT_ACCESS_KEY)).await;
assert_eq!(status, StatusCode::FORBIDDEN, "the root secret is known without IAM: {body}");
assert!(body.contains("<Code>SignatureDoesNotMatch</Code>"), "{body}");
}
#[tokio::test]
async fn the_answer_carries_the_request_identifier_rustfs_assigned() {
let stack = stack_over(ScriptedIam { ready: true });
let (_, headers, _) = answer(&stack, request(Method::GET, "/").extension(rustfs_request_context(REQUEST_ID))).await;
assert_eq!(headers.get("x-amz-request-id").and_then(|value| value.to_str().ok()), Some(REQUEST_ID));
assert_eq!(headers.get("x-request-id").and_then(|value| value.to_str().ok()), Some(REQUEST_ID));
}
#[tokio::test]
async fn without_a_rustfs_identifier_the_gateway_mints_its_own() {
let stack = stack_over(ScriptedIam { ready: true });
let (_, headers, _) = answer(&stack, request(Method::GET, "/")).await;
let minted = headers
.get("x-amz-request-id")
.and_then(|value| value.to_str().ok())
.expect("every answer names its request");
assert!(!minted.is_empty());
assert_ne!(minted, REQUEST_ID);
}
#[tokio::test]
async fn the_gateway_writes_no_cors_header() {
let stack = stack_over(ScriptedIam { ready: true });
let browser = |builder: http::request::Builder| builder.header("origin", "https://app.example.test");
for (method, target) in [(Method::GET, "/"), (Method::GET, "/bucket/key"), (Method::PUT, "/bucket/key")] {
let (_, headers, _) = answer(&stack, browser(request(method.clone(), target))).await;
let cors: Vec<&str> = headers
.keys()
.map(http::HeaderName::as_str)
.filter(|name| name.starts_with("access-control-"))
.collect();
assert!(cors.is_empty(), "{method} {target}: {cors:?}");
}
}
+82 -1
View File
@@ -18,6 +18,9 @@ use crate::app::object::request_body::{BodyReadControl, ObservedBody};
use crate::auth::IAMAuth;
use crate::auth_keystone;
use crate::config;
#[cfg(feature = "gateway-stack")]
use crate::server::gateway_stack::{GatewayAssembly, GatewayStack, keystone_enabled_in_configuration};
use crate::server::stack::{S3StackService, select_stack};
use crate::server::{
Http12ShutdownOutcome, ReadinessGateLayer, RemoteAddr, ShutdownHandle,
compress::{HttpCompressionConfig, PathAwareHttpCompressionPredicate, PathCategoryInjectionLayer},
@@ -259,6 +262,7 @@ const EVENT_HTTP_TRANSPORT_FAILED: &str = "http_transport_failed";
const EVENT_SOCKET_FALLBACK: &str = "socket_fallback";
const EVENT_HTTP_BIND_FAILED: &str = "http_bind_failed";
const EVENT_HTTP_STARTUP_ENDPOINTS: &str = "http_startup_endpoints";
const EVENT_S3_STACK_SELECTED: &str = "s3_stack_selected";
const EVENT_HTTP_HOST_ROUTING: &str = "http_host_routing";
const EVENT_HTTP_COMPRESSION_STATE: &str = "http_compression_state";
const EVENT_API_RATE_LIMIT_STATE: &str = "api_rate_limit_state";
@@ -1460,6 +1464,41 @@ fn control_request_body(body: s3s::Body) -> ControlRequestBody {
ControlRequestBody(body)
}
/// The S3 service mounted under the middleware: the legacy stack or the gateway stack, selected
/// at startup (`server/stack.rs`).
type S3EdgeService = S3StackService<S3Service, GatewayEdgeService>;
/// A build without the `gateway-stack` feature has no gateway stack to select, so this side of
/// [`S3EdgeService`] is never constructed.
#[cfg(not(feature = "gateway-stack"))]
type GatewayEdgeService = S3Service;
/// The gateway stack where the legacy service is mounted: the same response and error types, so
/// the layers around it do not change with the stack.
#[cfg(feature = "gateway-stack")]
#[derive(Clone)]
struct GatewayEdgeService(GatewayStack);
#[cfg(feature = "gateway-stack")]
impl<B> Service<HttpRequest<B>> for GatewayEdgeService
where
B: http_body::Body<Data = Bytes> + Send + 'static,
B::Error: std::error::Error + Send + Sync + 'static,
{
type Response = Response<s3s::Body>;
type Error = s3s::HttpError;
type Future = Pin<Box<dyn Future<Output = std::result::Result<Self::Response, Self::Error>> + Send>>;
fn poll_ready(&mut self, _cx: &mut Context<'_>) -> Poll<std::result::Result<(), Self::Error>> {
Poll::Ready(Ok(()))
}
fn call(&mut self, request: HttpRequest<B>) -> Self::Future {
let answer = self.0.call(request);
Box::pin(async move { Ok(answer.await.map(s3s::Body::http_body_unsync)) })
}
}
#[derive(Clone)]
struct ControlBodyDigestService<S> {
inner: S,
@@ -2452,6 +2491,48 @@ async fn start_http_server_inner(
rustfs_config::ENV_HTTP_REQUEST_BODY_READ_TIMEOUT,
rustfs_config::DEFAULT_HTTP_REQUEST_BODY_READ_TIMEOUT,
));
// The S3 stack is selected once, for the whole server. A gateway stack that cannot be
// assembled fails startup here; the legacy stack is never started in its place.
#[cfg(feature = "gateway-stack")]
let assemble_gateway = || -> Result<GatewayEdgeService> {
let stack = GatewayStack::assemble(GatewayAssembly {
server_ctx: Arc::clone(&server_ctx),
root_access_key: config.access_key.clone(),
root_secret_key: config.secret_key.clone(),
region: config.region.clone(),
server_domains: vh_domain_hosts.to_vec(),
body_read_timeout: http_request_body_read_timeout,
keystone_enabled: keystone_enabled_in_configuration(),
})
.map_err(Error::other)?;
info!(
event = EVENT_S3_STACK_SELECTED,
component = LOG_COMPONENT_SERVER,
subsystem = LOG_SUBSYSTEM_STARTUP,
stack = "gateway",
registered_operations = stack.registered_operations().len(),
"S3 stack selected"
);
Ok(GatewayEdgeService(stack))
};
#[cfg(not(feature = "gateway-stack"))]
let assemble_gateway = || {
Err(Error::new(
std::io::ErrorKind::Unsupported,
"the gateway S3 stack is not built into this binary",
))
};
let s3_service: S3EdgeService = select_stack(config.s3_stack, s3_service, assemble_gateway)?;
if s3_service.selected() == crate::config::S3Stack::Legacy {
info!(
event = EVENT_S3_STACK_SELECTED,
component = LOG_COMPONENT_SERVER,
subsystem = LOG_SUBSYSTEM_STARTUP,
stack = "legacy",
"S3 stack selected"
);
}
#[cfg(feature = "http3")]
let http3_server = if let Some(server_config) = http3_server_config {
let h3_s3_service = s3_service.clone();
@@ -2889,7 +2970,7 @@ async fn start_http_server_inner(
struct ConnectionContext {
http_server: Arc<ConnBuilder<HttpTaskExecutor>>,
task_owner: HttpTaskExecutor,
s3_service: S3Service,
s3_service: S3EdgeService,
compression_config: HttpCompressionConfig,
is_console: bool,
/// Whether `RUSTFS_SERVER_DOMAINS` is configured (i.e. s3s virtual-hosted-style routing is active).
+5
View File
@@ -16,6 +16,10 @@ mod audit;
mod compress;
pub mod cors;
mod event;
#[cfg(feature = "gateway-stack")]
mod gateway_handlers;
#[cfg(feature = "gateway-stack")]
mod gateway_stack;
mod health;
mod http;
mod hybrid;
@@ -29,6 +33,7 @@ mod runtime;
pub(crate) mod runtime_sources;
mod service_state;
mod ssec_transport;
mod stack;
pub mod tls_material;
pub(crate) mod tls_publish;
+1 -1
View File
@@ -92,7 +92,7 @@ fn carries_ssec_headers(headers: &HeaderMap) -> bool {
/// protocol is only consulted as a second source because the trusted-proxy
/// layer has already decided whether the peer is allowed to assert it; a
/// request that arrives direct carries no such assertion.
fn is_secure_transport(connection_is_tls: bool, client_info: Option<&ClientInfo>) -> bool {
pub(crate) fn is_secure_transport(connection_is_tls: bool, client_info: Option<&ClientInfo>) -> bool {
if connection_is_tls {
return true;
}
+253
View File
@@ -0,0 +1,253 @@
// Copyright 2024 RustFS Team
//
// Licensed under the Apache License, Version 2.0 (the "License");
// you may not use this file except in compliance with the License.
// You may obtain a copy of the License at
//
// http://www.apache.org/licenses/LICENSE-2.0
//
// Unless required by applicable law or agreed to in writing, software
// distributed under the License is distributed on an "AS IS" BASIS,
// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
// See the License for the specific language governing permissions and
// limitations under the License.
//! The S3 protocol stack one server runs, selected once at startup (rustfs/backlog#2734 T2.5).
//!
//! Responsible for: [`S3StackService`], the service mounted where the legacy S3 service used to
//! be, and [`select_stack`], the only place a stack is chosen. The whole stack is one or the
//! other: no request is routed between stacks by its operation, and a request the gateway stack
//! refuses is answered by that refusal and never retried on the legacy stack.
//! NOT responsible for: assembling either stack (`server/http.rs` builds the legacy service,
//! `server/gateway_stack.rs` the gateway one), or the middleware around them.
//! Upstream: `server/http.rs`. Downstream: the legacy S3 service and the gateway stack.
//!
//! This file names neither stack's types: it is generic over two services with one response
//! type, so `server/http.rs` decides what they are and how their bodies meet.
use super::layer::is_sts_query_request;
use super::prefix::{HEALTH_PREFIX, PROFILE_CPU_PATH, PROFILE_MEMORY_PATH, has_path_prefix, is_admin_path};
use crate::admin::console::is_console_path;
use crate::config::S3Stack;
use http::{HeaderMap, Method, Request, Uri};
use std::future::Future;
use std::pin::Pin;
use std::task::{Context, Poll, ready};
use tower::Service;
/// The MinIO-compatible health probes share this prefix.
const MINIO_HEALTH_PREFIX: &str = "/minio/health";
/// The S3 service of one server: the legacy stack, or the gateway stack with the legacy router
/// kept for the routes that are not S3 operations.
#[derive(Clone)]
pub(crate) struct S3StackService<L, G> {
legacy: L,
gateway: Option<G>,
}
impl<L, G> S3StackService<L, G> {
/// The stack this service runs.
pub(crate) fn selected(&self) -> S3Stack {
match self.gateway {
Some(_) => S3Stack::Gateway,
None => S3Stack::Legacy,
}
}
}
/// Builds the service for the selected stack.
///
/// `assemble_gateway` runs only when the gateway stack is selected, and its failure is the
/// failure of the whole selection: the caller refuses to start.
///
/// # Errors
///
/// Whatever `assemble_gateway` refused with. The legacy stack is never substituted.
pub(crate) fn select_stack<L, G, E>(
stack: S3Stack,
legacy: L,
assemble_gateway: impl FnOnce() -> Result<G, E>,
) -> Result<S3StackService<L, G>, E> {
let gateway = match stack {
S3Stack::Legacy => None,
S3Stack::Gateway => Some(assemble_gateway()?),
};
Ok(S3StackService { legacy, gateway })
}
/// Whether the legacy router answers this request while the gateway stack is selected: the admin
/// and table-catalog APIs, the console, STS, health and profiling, none of which is an S3
/// operation. Every other request is the gateway's, whatever it answers.
fn is_legacy_only_route(method: &Method, uri: &Uri, headers: &HeaderMap) -> bool {
let path = uri.path();
is_admin_path(path)
|| is_console_path(path)
|| has_path_prefix(path, HEALTH_PREFIX)
|| has_path_prefix(path, MINIO_HEALTH_PREFIX)
|| path == PROFILE_CPU_PATH
|| path == PROFILE_MEMORY_PATH
|| is_sts_query_request(method, uri, headers)
}
impl<L, G, B, R, E> Service<Request<B>> for S3StackService<L, G>
where
L: Service<Request<B>, Response = http::Response<R>, Error = E>,
G: Service<Request<B>, Response = http::Response<R>, Error = E>,
L::Future: Send + 'static,
G::Future: Send + 'static,
{
type Response = http::Response<R>;
type Error = E;
type Future = Pin<Box<dyn Future<Output = Result<Self::Response, Self::Error>> + Send>>;
fn poll_ready(&mut self, cx: &mut Context<'_>) -> Poll<Result<(), Self::Error>> {
if let Some(gateway) = &mut self.gateway {
ready!(gateway.poll_ready(cx))?;
}
self.legacy.poll_ready(cx)
}
fn call(&mut self, request: Request<B>) -> Self::Future {
match &mut self.gateway {
// REMOVED BY T2.11: the gateway serves these routes itself once they are migrated.
Some(gateway) if !is_legacy_only_route(request.method(), request.uri(), request.headers()) => {
Box::pin(gateway.call(request))
}
_ => Box::pin(self.legacy.call(request)),
}
}
}
#[cfg(test)]
mod tests {
use super::*;
use http::{Response, StatusCode};
use std::convert::Infallible;
use std::future::{Ready, ready as ready_future};
/// Answers every request with its own name.
#[derive(Clone)]
struct Named(&'static str);
impl Service<Request<()>> for Named {
type Response = Response<&'static str>;
type Error = Infallible;
type Future = Ready<Result<Self::Response, Self::Error>>;
fn poll_ready(&mut self, _cx: &mut Context<'_>) -> Poll<Result<(), Self::Error>> {
Poll::Ready(Ok(()))
}
fn call(&mut self, _request: Request<()>) -> Self::Future {
ready_future(Ok(Response::new(self.0)))
}
}
fn request(method: Method, target: &str) -> Request<()> {
Request::builder()
.method(method)
.uri(target)
.body(())
.expect("static request")
}
async fn answered_by(service: &mut S3StackService<Named, Named>, request: Request<()>) -> &'static str {
let response = service.call(request).await.expect("infallible");
assert_eq!(response.status(), StatusCode::OK);
response.into_body()
}
fn gateway_stack() -> S3StackService<Named, Named> {
select_stack(S3Stack::Gateway, Named("legacy"), || Ok::<_, Infallible>(Named("gateway"))).expect("assembles")
}
#[test]
fn a_gateway_assembly_failure_fails_the_selection_instead_of_falling_back() {
let selection = select_stack::<_, Named, _>(S3Stack::Gateway, Named("legacy"), || Err("the assembly was refused"));
assert_eq!(selection.err(), Some("the assembly was refused"));
}
#[test]
fn the_legacy_selection_never_assembles_a_gateway() {
let service = select_stack::<_, Named, &str>(S3Stack::Legacy, Named("legacy"), || {
panic!("the legacy stack must not assemble the gateway")
})
.expect("legacy needs no assembly");
assert_eq!(service.selected(), S3Stack::Legacy);
}
#[tokio::test]
async fn the_legacy_stack_answers_every_request_itself() {
let mut service = select_stack(S3Stack::Legacy, Named("legacy"), || Ok::<_, Infallible>(Named("gateway")))
.expect("legacy needs no assembly");
for target in ["/", "/bucket/key", "/rustfs/admin/v3/info", "/health"] {
assert_eq!(answered_by(&mut service, request(Method::GET, target)).await, "legacy", "{target}");
}
}
#[tokio::test]
async fn the_gateway_stack_answers_every_s3_request_whatever_the_operation() {
let mut service = gateway_stack();
assert_eq!(service.selected(), S3Stack::Gateway);
for (method, target) in [
(Method::GET, "/"),
(Method::GET, "/bucket/key"),
(Method::PUT, "/bucket/key"),
(Method::DELETE, "/bucket"),
(Method::GET, "/bucket?versions"),
(Method::POST, "/bucket/key?uploads"),
// Prefixes of the legacy-only routes that are bucket names, not those routes.
(Method::GET, "/healthy/key"),
(Method::GET, "/rustfs/administrator"),
(Method::GET, "/minio/healthcheck"),
(Method::GET, "/profile/cpus"),
] {
assert_eq!(
answered_by(&mut service, request(method.clone(), target)).await,
"gateway",
"{method} {target}"
);
}
}
#[tokio::test]
async fn the_gateway_stack_leaves_the_non_s3_routes_to_the_legacy_router() {
let mut service = gateway_stack();
for target in [
"/rustfs/admin/v3/info",
"/minio/admin/v3/info",
"/iceberg/v1/config",
"/health",
"/health/ready",
"/minio/health/live",
"/profile/cpu",
"/profile/memory",
] {
assert_eq!(answered_by(&mut service, request(Method::GET, target)).await, "legacy", "{target}");
}
}
#[tokio::test]
async fn an_sts_form_post_stays_on_the_legacy_router_and_a_plain_post_does_not() {
let mut service = gateway_stack();
let sts = Request::builder()
.method(Method::POST)
.uri("/")
.header(http::header::CONTENT_TYPE, "application/x-www-form-urlencoded")
.body(())
.expect("static request");
assert!(
is_sts_query_request(sts.method(), sts.uri(), sts.headers()),
"the fixture is an STS request"
);
assert_eq!(answered_by(&mut service, sts).await, "legacy");
assert_eq!(answered_by(&mut service, request(Method::POST, "/")).await, "gateway");
}
}
+39 -7
View File
@@ -41,7 +41,8 @@ const EVENT_SERVER_STARTING: &str = "server_starting";
const EVENT_ACTION_CREDENTIALS_INITIALIZED: &str = "action_credentials_initialized";
const EVENT_ACTION_CREDENTIALS_INITIALIZATION_FAILED: &str = "action_credentials_initialization_failed";
const DEFAULT_CREDENTIALS_WARNING_MESSAGE: &str = "Detected default root credentials; set RUSTFS_ACCESS_KEY and RUSTFS_SECRET_KEY to non-default values for production deployments";
const GATEWAY_STACK_NOT_ASSEMBLED: &str = "gateway stack is not assembled yet (rustfs/backlog#2734 T2.5)";
#[cfg(not(feature = "gateway-stack"))]
const GATEWAY_STACK_NOT_BUILT: &str = "RUSTFS_S3_STACK=gateway needs a binary built with the `gateway-stack` feature, which no release build enables (rustfs/backlog#2734)";
pub(crate) struct StartupListenContext {
pub(crate) readiness: Arc<GlobalReadiness>,
@@ -82,12 +83,7 @@ pub(crate) async fn init_startup_listen_context(
config: &Config,
instance_ctx: &Arc<InstanceContext>,
) -> Result<StartupListenContext> {
match config.s3_stack {
S3Stack::Legacy => {}
// REPLACED BY T2.5
// Refuse before any listener or storage exists; never fall back to legacy.
S3Stack::Gateway => return Err(Error::new(ErrorKind::Unsupported, GATEWAY_STACK_NOT_ASSEMBLED)),
}
refuse_unbuilt_stack(config.s3_stack)?;
crate::server::init_console_prefix()?;
log_sanitized_server_config(config);
let readiness = Arc::new(GlobalReadiness::new());
@@ -138,6 +134,18 @@ pub(crate) async fn init_startup_listen_context(
})
}
/// Refuses a selected S3 stack this binary cannot serve, before any listener or storage exists.
/// The selection is never replaced by another stack.
fn refuse_unbuilt_stack(stack: S3Stack) -> Result<()> {
match stack {
S3Stack::Legacy => Ok(()),
#[cfg(feature = "gateway-stack")]
S3Stack::Gateway => Ok(()),
#[cfg(not(feature = "gateway-stack"))]
S3Stack::Gateway => Err(Error::new(ErrorKind::Unsupported, GATEWAY_STACK_NOT_BUILT)),
}
}
pub(crate) async fn prepare_embedded_startup_config(
address: String,
access_key: String,
@@ -166,6 +174,10 @@ pub(crate) async fn prepare_embedded_startup_config(
config.secret_key = secret_key.clone();
config.region = Some(region.clone());
config.console_enable = false;
// The stack is selected for the whole process, so an embedded server reads the same variable
// the binary does.
config.s3_stack = S3Stack::from_env()?;
refuse_unbuilt_stack(config.s3_stack)?;
Ok(EmbeddedStartupConfig {
config,
@@ -518,6 +530,26 @@ mod tests {
));
}
#[cfg(not(feature = "gateway-stack"))]
#[test]
fn a_binary_without_the_gateway_stack_refuses_to_select_it() {
let err = super::refuse_unbuilt_stack(crate::config::S3Stack::Gateway).expect_err("the gateway stack is not built");
assert_eq!(err.kind(), std::io::ErrorKind::Unsupported);
assert!(err.to_string().contains("gateway-stack"), "{err}");
}
#[cfg(feature = "gateway-stack")]
#[test]
fn a_binary_with_the_gateway_stack_accepts_its_selection() {
super::refuse_unbuilt_stack(crate::config::S3Stack::Gateway).expect("the gateway stack is built");
}
#[test]
fn the_legacy_stack_is_always_selectable() {
super::refuse_unbuilt_stack(crate::config::S3Stack::Legacy).expect("legacy is the default stack");
}
#[tokio::test]
async fn init_startup_listen_context_rejects_console_s3_port_conflict() {
let mut config = Config::new("127.0.0.1:9001", vec!["/tmp/rustfs-data".to_string()]);
+125 -67
View File
@@ -1357,7 +1357,12 @@ fn object_store_not_initialized_error() -> S3Error {
}
fn request_iam_store<R: AuthorizationRequest + ?Sized>(req: &R) -> S3Result<Arc<IamSys<ObjectStore>>> {
let iam_store = match req.server_context() {
iam_store_for(req.server_context())
}
/// The IAM store of `server_ctx`, or the process default when the request carries no server context.
fn iam_store_for(server_ctx: Option<&Arc<ServerContextSlot>>) -> S3Result<Arc<IamSys<ObjectStore>>> {
let iam_store = match server_ctx {
Some(server_ctx) => server_ctx
.installed_app_context()
.filter(|context| context.iam().is_ready())
@@ -1373,6 +1378,86 @@ fn request_iam_store<R: AuthorizationRequest + ?Sized>(req: &R) -> S3Result<Arc<
})
}
/// Resolves the caller of one request as the access phase of either edge needs it: the credential
/// IAM holds for `access_key` (validated against `session_token`), whether it owns the deployment,
/// and the request-scoped facts later authorization steps read.
///
/// `access_key` is the key whose signature the edge already verified; `None` is an anonymous
/// request. Resolved against `server_ctx` so each embedded server reads its own IAM domain.
///
/// # Errors
///
/// What [`check_key_valid_with_context`] refuses: an unknown, disabled or expired credential, a
/// session token that does not belong to it, or an IAM system that is not initialized.
pub(crate) async fn resolve_req_info(
server_ctx: &Arc<ServerContextSlot>,
access_key: Option<&str>,
session_token: &str,
request_context: Option<RequestContext>,
) -> S3Result<ReqInfo> {
let app_context = server_ctx.app_context();
let (cred, is_owner) = match access_key {
Some(access_key) => {
let (cred, is_owner) = check_key_valid_with_context(session_token, access_key, app_context.as_deref()).await?;
(Some(cred), is_owner)
}
None => (None, false),
};
let region = match app_context.as_deref() {
Some(context) => context.region().get(),
None => runtime_sources::current_region(),
};
Ok(ReqInfo {
cred,
is_owner,
region,
request_context,
..Default::default()
})
}
/// The operation-aware admission checks every S3 request passes after its caller is resolved and
/// before its own authorization: the signed upload-size capabilities are refused on any operation
/// but the one each is scoped to, and the license must be valid.
///
/// `operation` is the S3 operation name (`PutObject`). Both edges call this with the request they
/// accepted, so a capability query cannot be silently ignored on one of them.
///
/// # Errors
///
/// `InvalidRequest` for a misplaced capability query, `AccessDenied` for a refused license, and
/// `InternalError` when the license cannot be checked.
pub(crate) fn admit_operation(headers: &HeaderMap, raw_query: Option<&str>, operation: &str) -> S3Result<()> {
let auth_type = get_request_auth_type_with_query(headers, raw_query);
let verified_presigned = matches!(auth_type, AuthType::Presigned);
let verified_sigv4 = matches!(auth_type, AuthType::Presigned | AuthType::Signed);
// The size capability is intentionally scoped to the single-object
// PutObject operation. Validate this at the operation-aware access
// boundary so unsupported GET/HEAD/DELETE/bucket routes cannot silently
// ignore a signed capability query.
if parse_presigned_put_max_content_length(headers, raw_query, verified_presigned)?.is_some() && operation != "PutObject" {
return Err(S3Error::with_message(
S3ErrorCode::InvalidRequest,
format!("{RUSTFS_MAX_CONTENT_LENGTH_QUERY} is only supported for presigned PutObject"),
));
}
if parse_presigned_multipart_max_total_object_size(headers, raw_query, verified_sigv4)?.is_some()
&& operation != "CreateMultipartUpload"
{
return Err(S3Error::with_message(
S3ErrorCode::InvalidRequest,
format!("{RUSTFS_MAX_TOTAL_OBJECT_SIZE_QUERY} is only supported for CreateMultipartUpload"),
));
}
license_check().map_err(|er| match er.kind() {
std::io::ErrorKind::PermissionDenied => s3_error!(AccessDenied, "{er}"),
_ => {
tracing::error!("license check failed due to unexpected error: {er}");
s3_error!(InternalError, "License validation failed")
}
})
}
pub(crate) struct ListBucketsIamAuthorization {
iam_store: Arc<IamSys<ObjectStore>>,
prepared: PreparedIamAuth,
@@ -1410,22 +1495,46 @@ impl ListBucketsIamAuthorization {
}
}
/// The request facts the ListBuckets discovery decision reads.
///
/// Owned by no HTTP framework: the legacy s3s edge and the gateway edge both fill it from their own
/// request, so the decision cannot differ by the edge that accepted the request.
pub(crate) struct ListBucketsAuthzRequest<'a> {
/// The caller as the access phase resolved it.
pub(crate) req_info: &'a ReqInfo,
pub(crate) headers: &'a HeaderMap,
/// The query exactly as it arrived, without its `?`.
pub(crate) raw_query: Option<&'a str>,
pub(crate) remote_addr: Option<std::net::SocketAddr>,
pub(crate) client_info: Option<&'a ClientInfo>,
pub(crate) server_context: Option<&'a Arc<ServerContextSlot>>,
}
/// Prepare the IAM-only authorization used to decide which buckets are visible in ListBuckets.
/// Bucket policies are intentionally excluded from this discovery decision, matching MinIO.
pub(crate) async fn prepare_list_buckets_iam_authorization<T>(req: &S3Request<T>) -> S3Result<ListBucketsIamAuthorization> {
let req_info = req_info_ref(req)?;
///
/// # Errors
///
/// `AccessDenied` for an anonymous caller, and `InternalError` when the IAM store is not ready.
pub(crate) async fn prepare_list_buckets_iam_authorization(
req: ListBucketsAuthzRequest<'_>,
) -> rustfs_s3_types::S3Result<ListBucketsIamAuthorization> {
let req_info = req.req_info;
let Some(cred) = req_info.cred.as_ref() else {
return Err(ApiError::access_denied().into());
};
let iam_store = request_iam_store(req)?;
let iam_store = iam_store_for(req.server_context)?;
let account = cred.access_key.clone();
let groups = cred.groups.clone();
let claims = cred.claims.clone().unwrap_or_default();
let action = Action::S3Action(S3Action::ListAllMyBucketsAction);
let root_access_key = root_access_key();
let principal = AuthzPrincipal::new(cred, &root_access_key);
let facts = request_authz_facts(
req,
let facts = AuthzFacts::from_request_parts(
req.headers,
req.raw_query,
req.remote_addr,
req.client_info,
AuthzTarget {
action,
bucket: "",
@@ -1433,8 +1542,12 @@ pub(crate) async fn prepare_list_buckets_iam_authorization<T>(req: &S3Request<T>
version_id: None,
location_constraint: None,
},
OffsetDateTime::now_utc(),
);
let base_conditions = authorization_conditions(req, &principal, &facts)?;
// The service-level listing has no bucket, object, tag or lock input, so its condition values
// are the request's own: the same values `authorization_conditions` yields for this action.
let mut base_conditions = build_conditions(&principal, &facts);
forward_secret_headers(req.headers, &mut base_conditions);
let mut bucket_conditions = base_conditions.clone();
bucket_conditions.insert("prefix".to_string(), vec![String::new()]);
bucket_conditions.insert("delimiter".to_string(), vec!["/".to_string()]);
@@ -1466,8 +1579,7 @@ pub(crate) async fn prepare_list_buckets_iam_authorization<T>(req: &S3Request<T>
/// Preserve the top-level IAM denial audit emitted before ListBuckets falls back
/// to bucket-level visibility checks.
pub(crate) fn log_list_buckets_iam_implicit_deny<T>(req: &S3Request<T>) -> S3Result<()> {
let req_info = req_info_ref(req)?;
pub(crate) fn log_list_buckets_iam_implicit_deny(req_info: &ReqInfo) {
let denial = DenialContext {
quiet: true,
suppress_audit: true,
@@ -1479,7 +1591,6 @@ pub(crate) fn log_list_buckets_iam_implicit_deny<T>(req: &S3Request<T>) -> S3Res
is_owner: req_info.is_owner,
};
denial.log("iam_implicit_deny", Action::S3Action(S3Action::ListAllMyBucketsAction));
Ok(())
}
pub(crate) fn delete_object_authorize_action(version_id: Option<&str>) -> Action {
@@ -2676,33 +2787,10 @@ impl S3Access for FS {
// second embedded server validates keys against its own root identity
// and IAM domain; the slot resolves the process default when it has
// not been installed, keeping single-instance behavior unchanged.
let app_context = self.server_ctx().app_context();
let (cred, is_owner) = if let Some(input_cred) = cx.credentials() {
let (cred, is_owner) = check_key_valid_with_context(
get_session_token(cx.uri(), cx.headers()).unwrap_or_default(),
&input_cred.access_key,
app_context.as_deref(),
)
.await?;
(Some(cred), is_owner)
} else {
(None, false)
};
let access_key = cx.credentials().map(|credentials| credentials.access_key.clone());
let session_token = get_session_token(cx.uri(), cx.headers()).unwrap_or_default().to_owned();
let request_context = cx.extensions_mut().get::<RequestContext>().cloned();
let region = match app_context.as_deref() {
Some(context) => context.region().get(),
None => runtime_sources::current_region(),
};
let req_info = ReqInfo {
cred,
is_owner,
region,
request_context,
..Default::default()
};
let req_info = resolve_req_info(self.server_ctx(), access_key.as_deref(), &session_token, request_context).await?;
let auth_type = get_request_auth_type_with_query(cx.headers(), cx.uri().query());
let verified_presigned = matches!(auth_type, AuthType::Presigned);
@@ -2725,37 +2813,7 @@ impl S3Access for FS {
}
}
// The size capability is intentionally scoped to the single-object
// PutObject operation. Validate this at the operation-aware access
// boundary so unsupported GET/HEAD/DELETE/bucket routes cannot silently
// ignore a signed capability query.
if parse_presigned_put_max_content_length(cx.headers(), cx.uri().query(), verified_presigned)?.is_some()
&& cx.s3_op().name() != "PutObject"
{
return Err(S3Error::with_message(
S3ErrorCode::InvalidRequest,
format!("{RUSTFS_MAX_CONTENT_LENGTH_QUERY} is only supported for presigned PutObject"),
));
}
if parse_presigned_multipart_max_total_object_size(cx.headers(), cx.uri().query(), verified_sigv4)?.is_some()
&& cx.s3_op().name() != "CreateMultipartUpload"
{
return Err(S3Error::with_message(
S3ErrorCode::InvalidRequest,
format!("{RUSTFS_MAX_TOTAL_OBJECT_SIZE_QUERY} is only supported for CreateMultipartUpload"),
));
}
license_check().map_err(|er| match er.kind() {
std::io::ErrorKind::PermissionDenied => s3_error!(AccessDenied, "{er}"),
_ => {
tracing::error!("license check failed due to unexpected error: {er}");
s3_error!(InternalError, "License validation failed")
}
})?;
// Verify uniformly here? Or verify separately below?
Ok(())
admit_operation(cx.headers(), cx.uri().query(), cx.s3_op().name())
}
/// Checks whether the CreateBucket request has accesses to the resources.
+21 -1
View File
@@ -45,6 +45,7 @@ use crate::storage::validate_website_configuration;
use crate::table_catalog;
use http::StatusCode;
use metrics::{counter, histogram};
use rustfs_gateway_types::compat::s3s_5761ddfe::generated::ops::list_buckets as gateway_list_buckets;
use rustfs_io_metrics::record_s3_op;
use rustfs_madmin::{SITE_REPL_API_VERSION, SRBucketMeta};
use rustfs_s3_ops::S3Operation;
@@ -740,6 +741,15 @@ impl FS {
}
}
/// A ListBuckets value the s3s edge and the gateway's types disagree on. The seam converts every
/// member both sides hold, so this is a defect in the conversion, never the caller's fault.
fn list_buckets_seam_error(error: rustfs_gateway_types::compat::ConversionError) -> S3Error {
S3Error::with_message(
S3ErrorCode::InternalError,
format!("failed to convert ListBuckets through the gateway compatibility seam: {error}"),
)
}
#[async_trait::async_trait]
impl S3 for FS {
#[instrument(level = "debug", skip(self, req))]
@@ -1596,7 +1606,17 @@ impl S3 for FS {
// List buckets not associated with a bucket, give it bucket label "*" to denote "all".
record_s3_op(S3Operation::ListBuckets);
let usecase = s3_api::bucket_usecase_for(self);
usecase.execute_list_buckets(req).await
// The use case speaks the envelope and the gateway's types; this edge only converts.
let envelope = crate::app::RequestEnvelope::from_s3s(&req);
let input = gateway_list_buckets::input_from_s3s(req.input).map_err(list_buckets_seam_error)?;
let output = usecase.execute_list_buckets(envelope, input).await?;
let mut output = gateway_list_buckets::output_to_s3s(output).map_err(list_buckets_seam_error)?;
// The seam writes a listing without buckets as an absent member. This edge has always
// answered the element, empty or not, and clients index the answer by it.
if output.buckets.is_none() {
output.buckets = Some(Vec::new());
}
Ok(S3Response::new(output))
}
async fn list_multipart_uploads(
+7 -58
View File
@@ -13,15 +13,14 @@
// limitations under the License.
use crate::storage::s3_api::common::rustfs_owner;
use crate::storage::storage_api::s3_api_consumer::bucket::contract::{
bucket::BucketInfo,
list::{ListObjectVersionsInfo as StorageListObjectVersionsInfo, ListObjectsV2Info as StorageListObjectsV2Info},
use crate::storage::storage_api::s3_api_consumer::bucket::contract::list::{
ListObjectVersionsInfo as StorageListObjectVersionsInfo, ListObjectsV2Info as StorageListObjectsV2Info,
};
use crate::storage::storage_api::s3_api_consumer::bucket::to_s3s_xml_etag;
use percent_encoding::percent_decode_str;
use s3s::dto::{
Bucket, CommonPrefix, DeleteMarkerEntry, EncodingType, ListBucketsOutput, ListObjectVersionsOutput, ListObjectsOutput,
ListObjectsV2Output, Object, ObjectStorageClass, ObjectVersion, ObjectVersionStorageClass, Timestamp,
CommonPrefix, DeleteMarkerEntry, EncodingType, ListObjectVersionsOutput, ListObjectsOutput, ListObjectsV2Output, Object,
ObjectStorageClass, ObjectVersion, ObjectVersionStorageClass, Timestamp,
};
use s3s::{S3Error, S3ErrorCode};
use tracing::debug;
@@ -126,23 +125,6 @@ pub(crate) fn build_list_objects_output(v2: ListObjectsV2Output, request_marker:
}
}
pub(crate) fn build_list_buckets_output(bucket_infos: &[BucketInfo]) -> ListBucketsOutput {
let buckets: Vec<Bucket> = bucket_infos
.iter()
.map(|bucket_info| Bucket {
creation_date: Some(Timestamp::from(bucket_info.created.unwrap_or(time::OffsetDateTime::UNIX_EPOCH))),
name: Some(bucket_info.name.clone()),
..Default::default()
})
.collect();
ListBucketsOutput {
buckets: Some(buckets),
owner: Some(rustfs_owner()),
..Default::default()
}
}
pub(crate) fn parse_list_object_versions_params(
prefix: Option<String>,
delimiter: Option<String>,
@@ -450,19 +432,16 @@ fn calculate_next_marker(v2: &ListObjectsV2Output) -> Option<String> {
#[cfg(test)]
mod tests {
use super::{
ListObjectVersionsInfo, ListObjectVersionsParams, ListObjectsV2Info, build_list_buckets_output,
build_list_object_versions_output, build_list_objects_output, build_list_objects_v2_output,
encode_list_objects_v2_continuation_token, parse_list_object_versions_params, parse_list_objects_v2_params,
to_s3s_xml_etag,
ListObjectVersionsInfo, ListObjectVersionsParams, ListObjectsV2Info, build_list_object_versions_output,
build_list_objects_output, build_list_objects_v2_output, encode_list_objects_v2_continuation_token,
parse_list_object_versions_params, parse_list_objects_v2_params, to_s3s_xml_etag,
};
use crate::storage::s3_api::common::rustfs_owner;
use crate::storage::storage_api::s3_api_consumer::bucket::StorageObjectInfo as ObjectInfo;
use crate::storage::storage_api::s3_api_consumer::bucket::contract::bucket::BucketInfo;
use rustfs_filemeta::FileInfo;
use rustfs_utils::http::headers::AMZ_STORAGE_CLASS;
use s3s::S3ErrorCode;
use s3s::dto::{CommonPrefix, EncodingType, ListObjectsV2Output, Object};
use time::OffsetDateTime;
use uuid::Uuid;
#[test]
@@ -525,36 +504,6 @@ mod tests {
}
}
#[test]
fn test_build_list_buckets_output_maps_bucket_infos_and_owner() {
let bucket_infos = vec![
BucketInfo {
name: "bucket-a".to_string(),
created: Some(OffsetDateTime::UNIX_EPOCH),
..Default::default()
},
BucketInfo {
name: "bucket-b".to_string(),
created: None,
..Default::default()
},
];
let output = build_list_buckets_output(&bucket_infos);
let buckets = output.buckets.as_ref().expect("buckets should be present");
let owner = output.owner.as_ref().expect("owner should be present");
assert_eq!(buckets.len(), 2);
assert_eq!(buckets[0].name.as_deref(), Some("bucket-a"));
assert_eq!(buckets[0].creation_date, Some(s3s::dto::Timestamp::from(OffsetDateTime::UNIX_EPOCH)));
assert_eq!(buckets[1].name.as_deref(), Some("bucket-b"));
assert_eq!(buckets[1].creation_date, Some(s3s::dto::Timestamp::from(OffsetDateTime::UNIX_EPOCH)));
let expected_owner = rustfs_owner();
assert_eq!(owner.display_name, expected_owner.display_name);
assert_eq!(owner.id, expected_owner.id);
}
#[test]
fn test_list_objects_marker_echoes_request_value() {
let output = build_list_objects_output(ListObjectsV2Output::default(), Some("m-1".to_string()));
+16 -18
View File
@@ -148,18 +148,20 @@ pub(crate) use super::sse::{
pub(crate) mod access_consumer {
pub(crate) use super::super::access::{
AuthorizationRequest, BucketConfigMutationSnapshot, BucketGenerationGuard, CopySourceBucketGenerationGuard,
MultipartStagingOperation, ObjectTagConditions, OdmReadGenerationGuard, PendingDeleteBucketGenerationGuard,
PostObjectPolicyHeaders, PostObjectRequestMarker, ReqInfo, RequestedCopySource, RequestedObjectLegalHold,
RequestedObjectLockRetainUntil, RequestedObjectLockRetention, RequestedObjectTags, StagedMultipartPartAuthorization,
TABLE_DATA_PLANE_LIST_CURSOR_PREFIX, TableDataPlaneListAccess, TableDataPlaneListCursorPosition,
TableDataPlanePublicationGuards, apply_bucket_generation_guard, apply_copy_source_bucket_generation_guard,
authorize_copy_object_tags, authorize_request, authorize_request_core, bucket_config_mutation_incarnation,
delete_object_authorize_action, has_bypass_governance_header, load_bucket_generation_from_store,
log_list_buckets_iam_implicit_deny, odm_read_generation, prepare_list_buckets_iam_authorization,
prepare_odm_read_generation, recursive_force_delete_has_authenticated_caller, replication_proxy_allowed,
replication_request_authorized, req_info_mut, req_info_ref, retained_table_data_plane_publication_guards,
set_requested_object_lock_retain_until,
ListBucketsAuthzRequest, MultipartStagingOperation, ObjectTagConditions, OdmReadGenerationGuard,
PendingDeleteBucketGenerationGuard, PostObjectPolicyHeaders, PostObjectRequestMarker, ReqInfo, RequestedCopySource,
RequestedObjectLegalHold, RequestedObjectLockRetainUntil, RequestedObjectLockRetention, RequestedObjectTags,
StagedMultipartPartAuthorization, TABLE_DATA_PLANE_LIST_CURSOR_PREFIX, TableDataPlaneListAccess,
TableDataPlaneListCursorPosition, TableDataPlanePublicationGuards, apply_bucket_generation_guard,
apply_copy_source_bucket_generation_guard, authorize_copy_object_tags, authorize_request, authorize_request_core,
bucket_config_mutation_incarnation, delete_object_authorize_action, has_bypass_governance_header,
load_bucket_generation_from_store, log_list_buckets_iam_implicit_deny, odm_read_generation,
prepare_list_buckets_iam_authorization, prepare_odm_read_generation, recursive_force_delete_has_authenticated_caller,
replication_proxy_allowed, replication_request_authorized, req_info_mut, req_info_ref,
retained_table_data_plane_publication_guards, set_requested_object_lock_retain_until,
};
#[cfg(feature = "gateway-stack")]
pub(crate) use super::super::access::{admit_operation, resolve_req_info};
pub(crate) use super::super::denial_audit::DenialAuditor;
pub(crate) use super::super::helper::{AuditRequestView, DenialScope};
}
@@ -369,16 +371,12 @@ pub(crate) mod heal_control_startup_consumer {
pub(crate) mod s3_api_consumer {
pub(crate) mod bucket {
pub(crate) use super::super::super::s3_api::bucket::{
ListObjectVersionsParams, ListObjectsV2Params, build_list_buckets_output, build_list_object_versions_output,
build_list_objects_output, build_list_objects_v2_output, encode_list_objects_v2_continuation_token,
parse_list_object_versions_params, parse_list_objects_v2_params,
ListObjectVersionsParams, ListObjectsV2Params, build_list_object_versions_output, build_list_objects_output,
build_list_objects_v2_output, encode_list_objects_v2_continuation_token, parse_list_object_versions_params,
parse_list_objects_v2_params,
};
pub(crate) mod contract {
pub(crate) mod bucket {
pub(crate) use super::super::super::super::contract::bucket::BucketInfo;
}
pub(crate) mod list {
pub(crate) use super::super::super::super::contract::list::{ListObjectVersionsInfo, ListObjectsV2Info};
}
+7
View File
@@ -232,6 +232,13 @@ pub(crate) mod server {
pub(crate) use crate::storage::storage_api::request_context_consumer::RequestContext;
}
/// The access-phase functions the gateway stack's handlers run, shared with the legacy
/// access hooks.
#[cfg(feature = "gateway-stack")]
pub(crate) mod access {
pub(crate) use crate::storage::storage_api::access_consumer::{admit_operation, resolve_req_info};
}
pub(crate) mod rpc {
pub(crate) use crate::storage::storage_api::rpc_consumer::InternodeRpcService;
#[cfg(test)]
+402
View File
@@ -0,0 +1,402 @@
// Copyright 2024 RustFS Team
//
// Licensed under the Apache License, Version 2.0 (the "License");
// you may not use this file except in compliance with the License.
// You may obtain a copy of the License at
//
// http://www.apache.org/licenses/LICENSE-2.0
//
// Unless required by applicable law or agreed to in writing, software
// distributed under the License is distributed on an "AS IS" BASIS,
// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
// See the License for the specific language governing permissions and
// limitations under the License.
// The gateway S3 stack inside an embedded RustFS server (rustfs/backlog#2734 T2.5): one
// operation, ListBuckets, is served end to end, and every other S3 operation is answered
// `501 NotImplemented`. Requests are signed by the AWS SDK and travel through the whole
// middleware stack, so what is asserted here is what a client sees.
#![recursion_limit = "256"]
use aws_sdk_s3::config::{Credentials, Region};
use aws_sdk_s3::error::{ProvideErrorMetadata, SdkError};
use aws_sdk_s3::primitives::ByteStream;
use aws_sdk_s3::{Client, Config};
use rustfs::app::context::get_global_app_context;
use rustfs::embedded::{RustFSServer, RustFSServerBuilder, find_available_port};
use rustfs_io_metrics::s3_http_metrics::s3_http_metrics_snapshot;
use rustfs_s3_ops::S3Operation;
use rustfs_storage_api::{BucketOperations, MakeBucketOptions};
use std::collections::BTreeMap;
use std::future::Future;
mod common;
const ROOT_ACCESS_KEY: &str = "gatewaystackroot";
const ROOT_SECRET_KEY: &str = "gateway-stack-root-secret";
const USER_SECRET_KEY: &str = "gateway-stack-user-secret";
const ENV_S3_STACK: &str = "RUSTFS_S3_STACK";
const ENV_KEYSTONE_ENABLE: &str = "RUSTFS_KEYSTONE_ENABLE";
const ENV_KEYSTONE_AUTH_URL: &str = "RUSTFS_KEYSTONE_AUTH_URL";
/// A Keystone endpoint nothing listens on: these tests are about start-up, not about tokens.
const UNREACHABLE_KEYSTONE: &str = "http://127.0.0.1:1/v3";
fn s3_client(endpoint: &str, access_key: &str, secret_key: &str) -> Client {
let config = Config::builder()
.credentials_provider(Credentials::new(access_key, secret_key, None, None, "test"))
.region(Region::new("us-east-1"))
.endpoint_url(endpoint)
.force_path_style(true)
.behavior_version_latest()
.build();
Client::from_conf(config)
}
/// Runs `test` against an embedded server started with `RUSTFS_S3_STACK` set to `stack`.
fn with_stack<F, Fut>(stack: Option<&'static str>, test: F)
where
F: FnOnce(RustFSServer) -> Fut + Send + 'static,
Fut: Future<Output = ()> + 'static,
{
with_environment(vec![(ENV_S3_STACK, stack)], test);
}
/// Runs `test` against an embedded server started under `environment`.
fn with_environment<F, Fut>(environment: Vec<(&'static str, Option<&'static str>)>, test: F)
where
F: FnOnce(RustFSServer) -> Fut + Send + 'static,
Fut: Future<Output = ()> + 'static,
{
temp_env::with_vars(environment, || {
common::run_embedded_test(move || async move {
let Some(started) = start_server().await else { return };
test(started.expect("start embedded server")).await;
});
});
}
/// Starts an embedded server on a free port; `None` when the sandbox allows no port at all.
async fn start_server() -> Option<Result<RustFSServer, String>> {
let port = match find_available_port() {
Ok(port) => port,
Err(err) if err.kind() == std::io::ErrorKind::PermissionDenied => return None,
Err(err) => panic!("find free port: {err}"),
};
let started = RustFSServerBuilder::new()
.address(format!("127.0.0.1:{port}"))
.access_key(ROOT_ACCESS_KEY)
.secret_key(ROOT_SECRET_KEY)
.build()
.await;
// Both renderings: the refusal's text may be in either.
Some(started.map_err(|error| format!("{error} {error:?}")))
}
/// The S3 error code and HTTP status an SDK call was refused with.
fn refusal<E: ProvideErrorMetadata>(error: &SdkError<E>) -> (Option<String>, Option<u16>) {
let status = error.raw_response().map(|response| response.status().as_u16());
(error.code().map(str::to_owned), status)
}
/// One series of the S3 request counter: method, operation and outcome.
type Series = (&'static str, &'static str, &'static str);
/// How often each series of the S3 request counter has been counted in this process.
fn s3_request_counts() -> BTreeMap<Series, u64> {
s3_http_metrics_snapshot()
.into_iter()
.map(|series| ((series.method, series.operation, series.outcome), series.total))
.collect()
}
/// Every series counted since `before`, with how often. Reading the whole counter, not one
/// series, is what makes a second count under another label visible.
fn counted_since(before: &BTreeMap<Series, u64>) -> BTreeMap<Series, u64> {
s3_request_counts()
.into_iter()
.filter_map(|(series, total)| {
let counted = total - before.get(&series).copied().unwrap_or(0);
(counted > 0).then_some((series, counted))
})
.collect()
}
async fn create_bucket_in_the_store(bucket: &str) {
get_global_app_context()
.expect("embedded server context")
.object_store()
.make_bucket(bucket, &MakeBucketOptions::default())
.await
.expect("create bucket in the store");
}
async fn create_user_without_a_policy(access_key: &str) {
get_global_app_context()
.expect("embedded server context")
.iam()
.handle()
.create_user(
access_key,
&rustfs_madmin::AddOrUpdateUserReq {
secret_key: USER_SECRET_KEY.to_string(),
policy: None,
status: rustfs_madmin::AccountStatus::Enabled,
},
)
.await
.expect("create user without a policy");
}
#[test]
fn the_gateway_stack_lists_the_caller_s_buckets_and_answers_every_other_operation_501() {
with_stack(Some("gateway"), |server| async move {
// CreateBucket is not served by this stack yet, so the buckets are made in the store.
create_bucket_in_the_store("gateway-stack-alpha").await;
create_bucket_in_the_store("gateway-stack-beta").await;
let client = s3_client(&server.endpoint(), server.access_key(), server.secret_key());
let listing = client.list_buckets().send().await.expect("signed ListBuckets");
let mut names: Vec<&str> = listing.buckets().iter().filter_map(|bucket| bucket.name()).collect();
names.sort_unstable();
assert_eq!(names, ["gateway-stack-alpha", "gateway-stack-beta"]);
assert!(listing.owner().and_then(|owner| owner.id()).is_some(), "the listing names its owner");
assert!(
listing.buckets().iter().all(|bucket| bucket.creation_date().is_some()),
"every bucket carries its creation date"
);
let get = client
.get_object()
.bucket("gateway-stack-alpha")
.key("object")
.send()
.await
.expect_err("GetObject is not registered");
assert_eq!(refusal(&get), (Some("NotImplemented".to_owned()), Some(501)));
let put = client
.put_object()
.bucket("gateway-stack-alpha")
.key("object")
.body(ByteStream::from_static(b"payload"))
.send()
.await
.expect_err("PutObject is not registered");
assert_eq!(refusal(&put), (Some("NotImplemented".to_owned()), Some(501)));
let create = client
.create_bucket()
.bucket("gateway-stack-gamma")
.send()
.await
.expect_err("CreateBucket is not registered");
assert_eq!(refusal(&create), (Some("NotImplemented".to_owned()), Some(501)));
let listing = client.list_buckets().send().await.expect("ListBuckets after the refusals");
assert_eq!(listing.buckets().len(), 2, "a refused write created nothing");
server.shutdown().await;
});
}
#[test]
fn the_gateway_stack_refuses_callers_it_cannot_admit() {
with_stack(Some("gateway"), |server| async move {
create_bucket_in_the_store("gateway-stack-alpha").await;
create_user_without_a_policy("gatewaystacknopolicy").await;
let endpoint = server.endpoint();
// Anonymous: no credentials at all.
let anonymous = reqwest::Client::builder()
.no_proxy()
.build()
.expect("http client")
.get(format!("{endpoint}/"))
.send()
.await
.expect("anonymous ListBuckets is answered");
assert_eq!(anonymous.status().as_u16(), 403);
let request_id = anonymous
.headers()
.get("x-amz-request-id")
.and_then(|value| value.to_str().ok())
.map(str::to_owned)
.expect("the refusal names its request");
assert_eq!(
anonymous.headers().get("x-request-id").and_then(|value| value.to_str().ok()),
Some(request_id.as_str()),
"one identifier names the request in both headers"
);
let body = anonymous.text().await.expect("refusal body");
assert!(body.contains("<Code>AccessDenied</Code>"), "{body}");
// The right access key with the wrong secret.
let wrong_secret = s3_client(&endpoint, ROOT_ACCESS_KEY, "not-the-root-secret")
.list_buckets()
.send()
.await
.expect_err("a wrong secret signs nothing");
assert_eq!(refusal(&wrong_secret), (Some("SignatureDoesNotMatch".to_owned()), Some(403)));
// An access key nobody issued: the caller's fault, not the server's.
let unknown_key = s3_client(&endpoint, "gatewaystackunknown", USER_SECRET_KEY)
.list_buckets()
.send()
.await
.expect_err("an unknown access key is refused");
assert_eq!(refusal(&unknown_key), (Some("InvalidAccessKeyId".to_owned()), Some(403)));
// A real user whose policy grants nothing: it may neither list every bucket nor see one.
let no_permission = s3_client(&endpoint, "gatewaystacknopolicy", USER_SECRET_KEY)
.list_buckets()
.send()
.await
.expect_err("a caller without permission lists nothing");
assert_eq!(refusal(&no_permission), (Some("AccessDenied".to_owned()), Some(403)));
// The root caller is still served by the same server.
let listing = s3_client(&endpoint, server.access_key(), server.secret_key())
.list_buckets()
.send()
.await
.expect("signed ListBuckets");
assert_eq!(listing.buckets().len(), 1);
server.shutdown().await;
});
}
/// The S3 request counter belongs to RustFS's layer in front of both stacks, and the operation
/// label is set by the code a handler calls. That only works if the gateway polls its handler
/// inside that layer's scope, on the request's own task, which is what this observes.
#[test]
fn the_gateway_stack_counts_each_request_once_under_the_label_the_legacy_stack_uses() {
with_stack(Some("gateway"), |server| async move {
let endpoint = server.endpoint();
let before = s3_request_counts();
s3_client(&endpoint, server.access_key(), server.secret_key())
.list_buckets()
.send()
.await
.expect("signed ListBuckets");
assert_eq!(
counted_since(&before),
BTreeMap::from([(("GET", S3Operation::ListBuckets.as_str(), "2xx"), 1)]),
"one served request is counted once, as ListBuckets"
);
let before = s3_request_counts();
let refused = s3_client(&endpoint, ROOT_ACCESS_KEY, "not-the-root-secret")
.list_buckets()
.send()
.await
.expect_err("a wrong secret signs nothing");
assert_eq!(refusal(&refused), (Some("SignatureDoesNotMatch".to_owned()), Some(403)));
assert_eq!(
counted_since(&before),
BTreeMap::from([(("GET", "unknown", "4xx"), 1)]),
"a request refused by authentication is counted once, under no operation"
);
server.shutdown().await;
});
}
/// The pinned gateway admits a request that carries only `X-Auth-Token` as anonymous, while the
/// RustFS code behind it reads the Keystone identity. Until the gateway authenticates the token
/// (rustfs/gateway#1586) the two settings together refuse to start, and nothing is served.
#[test]
fn the_gateway_stack_refuses_to_start_with_keystone_enabled() {
let environment = [
(ENV_S3_STACK, Some("gateway")),
(ENV_KEYSTONE_ENABLE, Some("true")),
(ENV_KEYSTONE_AUTH_URL, Some(UNREACHABLE_KEYSTONE)),
];
temp_env::with_vars(environment, || {
common::run_embedded_test(|| async {
let Some(started) = start_server().await else { return };
let refusal = match started {
Ok(server) => {
server.shutdown().await;
panic!("the gateway stack started with Keystone enabled");
}
Err(refusal) => refusal,
};
for named in ["RUSTFS_S3_STACK=gateway", "RUSTFS_KEYSTONE_ENABLE", "rustfs/gateway#1586"] {
assert!(refusal.contains(named), "{named} is missing from: {refusal}");
}
});
});
}
#[test]
fn the_legacy_stack_starts_with_keystone_enabled() {
let environment = vec![
(ENV_S3_STACK, None),
(ENV_KEYSTONE_ENABLE, Some("true")),
(ENV_KEYSTONE_AUTH_URL, Some(UNREACHABLE_KEYSTONE)),
];
with_environment(environment, |server| async move {
let listing = s3_client(&server.endpoint(), server.access_key(), server.secret_key())
.list_buckets()
.send()
.await
.expect("signed ListBuckets on the legacy stack with Keystone enabled");
assert!(listing.buckets().is_empty());
server.shutdown().await;
});
}
#[test]
fn the_legacy_stack_still_serves_every_operation() {
with_stack(None, |server| async move {
let client = s3_client(&server.endpoint(), server.access_key(), server.secret_key());
client
.create_bucket()
.bucket("legacy-stack-alpha")
.send()
.await
.expect("CreateBucket on the legacy stack");
client
.put_object()
.bucket("legacy-stack-alpha")
.key("object")
.body(ByteStream::from_static(b"payload"))
.send()
.await
.expect("PutObject on the legacy stack");
let before = s3_request_counts();
let listing = client.list_buckets().send().await.expect("ListBuckets on the legacy stack");
assert_eq!(
counted_since(&before),
BTreeMap::from([(("GET", S3Operation::ListBuckets.as_str(), "2xx"), 1)]),
"the label the gateway stack is held to is the one this stack counts under"
);
let names: Vec<&str> = listing.buckets().iter().filter_map(|bucket| bucket.name()).collect();
assert_eq!(names, ["legacy-stack-alpha"]);
assert!(listing.owner().and_then(|owner| owner.id()).is_some(), "the listing names its owner");
let missing = client
.get_object()
.bucket("legacy-stack-alpha")
.key("missing")
.send()
.await
.expect_err("a missing key");
assert_eq!(refusal(&missing), (Some("NoSuchKey".to_owned()), Some(404)));
create_user_without_a_policy("legacystacknopolicy").await;
let no_permission = s3_client(&server.endpoint(), "legacystacknopolicy", USER_SECRET_KEY)
.list_buckets()
.send()
.await
.expect_err("a caller without permission lists nothing on either stack");
assert_eq!(refusal(&no_permission), (Some("AccessDenied".to_owned()), Some(403)));
server.shutdown().await;
});
}
+226
View File
@@ -0,0 +1,226 @@
#!/usr/bin/env bash
# Keeps the `gateway-stack` cargo feature of the rustfs crate out of every release build while the
# gateway S3 stack is under construction (rustfs/backlog#2734 T2.5).
#
# Usage: scripts/check_gateway_stack_release_boundary.sh [--root DIR]
# scripts/check_gateway_stack_release_boundary.sh --self-test
#
# Three facts are checked, none of which needs Cargo:
# 1. rustfs/src/server/gateway_stack.rs refuses to compile without debug assertions, so a
# release-profile build that enables the feature fails in the compiler;
# 2. neither the `default` nor the `full` feature list of rustfs/Cargo.toml enables it, directly
# or through a feature that enables it, and the feature itself still exists (a guard whose
# subject is gone must fail, not skip);
# 3. no file that produces a release artifact names the feature or one that enables it.
# A missing input is an error: every file below exists in this repository.
set -euo pipefail
FEATURE="gateway-stack"
GUARD_SOURCE="rustfs/src/server/gateway_stack.rs"
GUARD_CFG='#[cfg(not(debug_assertions))]'
GUARD_ERROR='compile_error!("gateway-stack is restricted to debug builds");'
MANIFEST="rustfs/Cargo.toml"
# Everything that builds or packages a release binary.
RELEASE_FILES=(
".github/workflows/build.yml"
".github/workflows/docker.yml"
"build-rustfs.sh"
"docker-buildx.sh"
"Dockerfile"
"Dockerfile.glibc"
"Dockerfile.source"
"rustfs.spec"
"Justfile"
".config/make/build.mak"
".config/make/build-docker.mak"
)
fail() {
echo "gateway-stack release boundary: $*" >&2
return 1
}
# Prints the value of one `name = [...]` feature line of the manifest.
feature_list() {
local manifest="$1" name="$2"
grep -E "^${name}[[:space:]]*=" "$manifest" || true
}
# Prints the feature and every feature that enables it, directly or through another, one per line.
enabling_features() {
local manifest="$1" known="$FEATURE" grown name
while true; do
grown="$known"
while IFS= read -r name; do
grep -qxF -- "$name" <<<"$grown" || grown+=$'\n'"$name"
done < <(
while IFS= read -r name; do
grep -E "^[A-Za-z0-9_-]+[[:space:]]*=.*\"${name}\"" "$manifest" | sed -E 's/[[:space:]]*=.*//' || true
done <<<"$known"
)
[[ "$grown" == "$known" ]] && break
known="$grown"
done
printf '%s\n' "$known"
}
check_root() {
local root="$1" status=0 file line name enabler
local -a enablers=("$FEATURE")
file="${root}/${GUARD_SOURCE}"
if [[ ! -f "$file" ]]; then
fail "${GUARD_SOURCE} is missing" || status=1
else
# The cfg must sit on the line directly above the compile_error.
line="$(grep -nF "$GUARD_ERROR" "$file" | head -n 1 | cut -d: -f1)"
if [[ -z "$line" ]]; then
fail "${GUARD_SOURCE} no longer refuses a build without debug assertions" || status=1
elif [[ "$(sed -n "$((line - 1))p" "$file" | tr -d '[:space:]')" != "$(tr -d '[:space:]' <<<"$GUARD_CFG")" ]]; then
fail "the compile_error in ${GUARD_SOURCE} is not gated on cfg(not(debug_assertions))" || status=1
fi
fi
file="${root}/${MANIFEST}"
if [[ ! -f "$file" ]]; then
fail "${MANIFEST} is missing" || status=1
else
if [[ -z "$(feature_list "$file" "$FEATURE")" ]]; then
fail "${MANIFEST} no longer declares the ${FEATURE} feature this guard protects" || status=1
fi
mapfile -t enablers < <(enabling_features "$file")
for name in default full; do
line="$(feature_list "$file" "$name")"
if [[ -z "$line" ]]; then
fail "${MANIFEST} has no ${name} feature list" || status=1
fi
for enabler in "${enablers[@]}"; do
if [[ "$enabler" == "$name" ]]; then
fail "the ${name} feature list of ${MANIFEST} enables ${FEATURE}" || status=1
fi
done
done
fi
for file in "${RELEASE_FILES[@]}"; do
if [[ ! -f "${root}/${file}" ]]; then
fail "release file ${file} is missing; update RELEASE_FILES" || status=1
continue
fi
for enabler in "${enablers[@]}"; do
if grep -qF -- "$enabler" "${root}/${file}"; then
fail "${file} names ${enabler}, which enables ${FEATURE}; release artifacts must not" || status=1
fi
done
done
return "$status"
}
self_test() {
local scratch fixture failures=0
scratch="$(mktemp -d)"
make_fixture() {
fixture="${scratch}/$1"
mkdir -p "${fixture}/rustfs/src/server" "${fixture}/.github/workflows" "${fixture}/.config/make"
printf '%s\n%s\n' "$GUARD_CFG" "$GUARD_ERROR" >"${fixture}/${GUARD_SOURCE}"
printf '%s\n' '[features]' 'default = ["ftps"]' 'full = ["ftps", "swift"]' 'gateway-stack = ["dep:rustfs-gateway"]' \
>"${fixture}/${MANIFEST}"
for file in "${RELEASE_FILES[@]}"; do
printf 'cargo build --release -p rustfs\n' >"${fixture}/${file}"
done
}
expect() {
local wanted="$1" label="$2"
if check_root "$fixture" >/dev/null 2>&1; then
[[ "$wanted" == "pass" ]] || { echo "self-test: ${label} was accepted" >&2; failures=$((failures + 1)); }
else
[[ "$wanted" == "fail" ]] || { echo "self-test: ${label} was refused" >&2; failures=$((failures + 1)); }
fi
}
make_fixture valid
expect pass "a repository that keeps the boundary"
make_fixture no-compile-error
printf '// nothing here\n' >"${fixture}/${GUARD_SOURCE}"
expect fail "a gateway stack without the compile-time refusal"
make_fixture ungated-compile-error
printf '%s\n%s\n' '#[cfg(test)]' "$GUARD_ERROR" >"${fixture}/${GUARD_SOURCE}"
expect fail "a compile_error gated on something else"
make_fixture missing-source
rm "${fixture}/${GUARD_SOURCE}"
expect fail "a missing guard source"
make_fixture default-enables
sed -i.bak 's/^default = .*/default = ["ftps", "gateway-stack"]/' "${fixture}/${MANIFEST}"
expect fail "a default feature list that enables the stack"
make_fixture full-enables
sed -i.bak 's/^full = .*/full = ["ftps", "gateway-stack"]/' "${fixture}/${MANIFEST}"
expect fail "a full feature list that enables the stack"
make_fixture feature-gone
sed -i.bak '/^gateway-stack = /d' "${fixture}/${MANIFEST}"
expect fail "a manifest without the feature"
make_fixture full-enables-through-another
printf '%s\n' 'hooks = ["gateway-stack"]' >>"${fixture}/${MANIFEST}"
sed -i.bak 's/^full = .*/full = ["ftps", "hooks"]/' "${fixture}/${MANIFEST}"
expect fail "a full feature list that enables the stack through another feature"
make_fixture debug-only-enabler
printf '%s\n' 'hooks = ["gateway-stack"]' >>"${fixture}/${MANIFEST}"
expect pass "a feature outside default and full that enables the stack"
make_fixture release-file-names-enabler
printf '%s\n' 'hooks = ["gateway-stack"]' >>"${fixture}/${MANIFEST}"
printf 'cargo build --release -p rustfs --features hooks\n' >"${fixture}/build-rustfs.sh"
expect fail "a release file that enables the stack through another feature"
make_fixture release-workflow
printf 'cargo build --release -p rustfs --features gateway-stack\n' >"${fixture}/.github/workflows/build.yml"
expect fail "a release workflow that enables the stack"
make_fixture missing-release-file
rm "${fixture}/build-rustfs.sh"
expect fail "a missing release file"
rm -rf "$scratch"
if ((failures > 0)); then
echo "gateway-stack release boundary self-test: ${failures} failure(s)" >&2
return 1
fi
echo "gateway-stack release boundary self-test passed"
}
main() {
local root
root="$(cd "$(dirname "${BASH_SOURCE[0]}")/.." && pwd)"
case "${1:-}" in
--self-test)
[[ $# -eq 1 ]] || { echo "usage: $0 [--root DIR] | --self-test" >&2; exit 2; }
self_test
;;
--root)
[[ $# -eq 2 ]] || { echo "usage: $0 [--root DIR] | --self-test" >&2; exit 2; }
check_root "$2"
echo "gateway-stack release boundary holds"
;;
"")
check_root "$root"
echo "gateway-stack release boundary holds"
;;
*)
echo "usage: $0 [--root DIR] | --self-test" >&2
exit 2
;;
esac
}
main "$@"
+4 -2
View File
@@ -17,7 +17,7 @@ ROOT = Path(__file__).resolve().parent.parent
ALWAYS_JOBS = ("classify-changes", "typos", "quick-checks")
CODE_JOBS = (
"workspace-lint-and-build", "workspace-tests", "core-contract", "connect-feature-boundaries", "fips-provider", "test-and-lint-rio-v2",
"test-and-lint-protocols", "build-rustfs-debug-binary", "uring-integration",
"test-and-lint-protocols", "test-and-lint-gateway-stack", "build-rustfs-debug-binary", "uring-integration",
"e2e-tests", "s3-implemented-tests", "s3-lifecycle-behavior-tests",
)
# Specialized boundary, hardware and alternate-feature lanes do not gate a
@@ -33,7 +33,7 @@ NIGHTLY_JOBS = ("connect-feature-boundaries", "fips-provider", "uring-integratio
# against this revision's expected job contract. The workflow refuses a plan
# that does not carry the current marker and falls back to the full matrix, so
# a base planner predating the contract cannot authorize a narrower selection.
PLAN_CONTRACT = "3"
PLAN_CONTRACT = "4"
# These jobs still exercise the server and its black-box harness when only E2E
# Rust sources change. Production code, manifests and shared test configuration
# always select the full matrix. No production package depends on e2e_test.
@@ -299,6 +299,8 @@ def configurations(jobs: dict[str, str]) -> list[dict]:
("protocol-sftp-tests", "test-and-lint-protocols", "test", ["sftp"]),
("protocol-http3-lint", "test-and-lint-protocols", "dev", ["http3", "swift"]),
("protocol-http3-tests", "test-and-lint-protocols", "test", ["http3", "swift"]),
("gateway-stack-lint", "test-and-lint-gateway-stack", "dev", ["gateway-stack"]),
("gateway-stack-tests", "test-and-lint-gateway-stack", "test", ["gateway-stack"]),
("server-rio-v2", "build-rustfs-debug-binary-rio-v2", "dev", ["e2e-test-hooks", "rio-v2"]),
]
return [{"id": identity, "job": job, "target": "x86_64-unknown-linux-gnu", "profile": profile,