Files

621 lines
15 KiB
Markdown
Raw Permalink Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Flowfish - Roadmap and Phase Planning
## 🎯 Overview
Development of the Flowfish platform is planned in three main phases. Each phase is designed to deliver value incrementally.
---
## 📅 Phase Summary
| Phase | Duration | Milestones | Deliverable |
|-------|----------|------------|-------------|
| **Phase 1: MVP** | 0–3 months | M1, M2, M3 | Production-ready core platform |
| **Phase 2: Advanced** | 4–6 months | M4, M5 | Enterprise features |
| **Phase 3: AI/ML** | 7–9 months | M6, M7 | Advanced analytics |
---
## 🚀 Phase 1: MVP (Minimum Viable Product)
**Target Duration**: 0–3 months
**Status**: Planning
**Goal**: Complete core platform infrastructure and core features
### Milestone 1: Foundation (Month 1)
**Sprint 1–2: Infrastructure Setup**
**Backend**:
- ✅ FastAPI project setup
- ✅ PostgreSQL schema implementation
- ✅ Database migrations (Alembic)
- ✅ Authentication (JWT)
- ✅ RBAC implementation
- ✅ API documentation (OpenAPI)
**Frontend**:
- ✅ React + TypeScript + Ant Design setup
- ✅ Layout components (Header, Sidebar, Content)
- ✅ Authentication flow (Login, OAuth)
- ✅ Route structure
- ✅ State management (Redux Toolkit)
**DevOps**:
- ✅ Docker containers (backend, frontend)
- ✅ Docker Compose for local development
- ✅ CI/CD pipeline (GitHub Actions)
- ✅ Kubernetes base manifests
**Deliverables**:
- ✅ Working login page
- ✅ Basic dashboard skeleton
- ✅ API health check endpoint
- ✅ Database schema deployed
---
**Sprint 3–4: Cluster Management & Inspektor Gadget**
**Backend**:
- ✅ Kubernetes API client integration
- ✅ Cluster CRUD operations
- ✅ Namespace discovery
- ✅ Workload discovery (Pod, Deployment, Service, StatefulSet)
- ✅ Inspektor Gadget DaemonSet integration
- ✅ eBPF data collection pipeline
**Frontend**:
- ✅ Cluster management page
- ✅ Cluster selector component
- ✅ Namespace list view
- ✅ Workload explorer
**Testing**:
- ✅ Unit tests (backend)
- ✅ Integration tests (API)
- ✅ E2E tests (frontend)
**Deliverables**:
- ✅ Add/edit/delete clusters
- ✅ View discovered workloads
- ✅ Inspektor Gadget collecting data
---
### Milestone 2: Core Features (Month 2)
**Sprint 5–6: Analysis Wizard & Communication Discovery**
**Backend**:
- ✅ Analysis wizard API (4-step workflow)
- ✅ Gadget module configuration
- ✅ Analysis execution engine
- ✅ Communication discovery logic
- ✅ ClickHouse integration
- ✅ Data enricher (K8s metadata)
**Frontend**:
- ✅ Analysis wizard (4 steps)
- ✅ Analysis list page
- ✅ Analysis detail page
- ✅ Communication list view
**Neo4j**:
- ✅ Graph schema creation
- ✅ Vertex/Edge insertion logic
- ✅ Basic graph queries
**Deliverables**:
- ✅ Create analysis via wizard
- ✅ Start/stop analysis
- ✅ View discovered communications
- ✅ Data flowing to databases
---
**Sprint 7–8: Dependency Map Visualization**
**Backend**:
- ✅ Graph service (Neo4j queries)
- ✅ Graph data transformation (Node/Edge format)
- ✅ Filtering logic (namespace, workload type, risk)
- ✅ Real-time updates (WebSocket)
**Frontend**:
- ✅ Live Map page (Cytoscape.js integration)
- ✅ Graph rendering (nodes, edges, styling)
- ✅ Layout algorithms (hierarchical, force-directed)
- ✅ Interaction (click, hover, zoom)
- ✅ Detail panel (node/edge info)
- ✅ Filters (namespace, type, risk)
**Deliverables**:
- ✅ Interactive dependency map
- ✅ Real-time updates visible on graph
- ✅ Filtering and search working
- ✅ Export graph as PNG/JSON
---
### Milestone 3: Polish & Testing (Month 3)
**Sprint 9–10: Dashboard & Refinement**
**Backend**:
- ✅ Dashboard metrics API
- ✅ Aggregation queries (ClickHouse)
- ✅ Performance optimization
- ✅ Caching (Redis)
**Frontend**:
- ✅ Overview Dashboard (metrics cards, charts)
- ✅ Application Inventory page
- ✅ Risk scoring visualization
- ✅ UI polish (responsive, dark mode)
**Documentation**:
- ✅ User guide
- ✅ API documentation
- ✅ Deployment guide
- ✅ Troubleshooting guide
**Deliverables**:
- ✅ Production-ready platform
- ✅ Comprehensive documentation
- ✅ Performance benchmarks met
**Phase 1 Success Criteria**:
- ✅ 1000+ pods handled
- ✅ Real-time graph updates <5s
- ✅ API response time p95 <500ms
- ✅ 4 user roles working
- ✅ OAuth SSO working
- ✅ Deployment on Kubernetes successful
---
## 🌟 Phase 2: Advanced Features
**Target Duration**: 4–6 months
**Status**: Planned
**Goal**: Enterprise features and advanced analytics
### Milestone 4: Historical Analysis (Month 4)
**Sprint 11–12: Time Travel & Baseline**
**Backend**:
- ✅ Historical graph snapshots
- ✅ Time-range queries
- ✅ Baseline creation logic
- ✅ Baseline storage (PostgreSQL)
- ✅ Comparison engine
**Frontend**:
- ✅ Historical Map page
- ✅ Time slider component
- ✅ Playback mode
- ✅ Snapshot comparison view
- ✅ Baseline management page
**Deliverables**:
- ✅ View past dependency maps
- ✅ Compare snapshots
- ✅ Create traffic baselines
---
**Sprint 13–14: Change Detection**
**Backend**:
- ✅ Change detection algorithm
- ✅ New/lost connection tracking
- ✅ Traffic spike detection
- ✅ Change event storage
**Frontend**:
- ✅ Change Detection page
- ✅ Change timeline visualization
- ✅ Change details panel
- ✅ Change filtering
**Deliverables**:
- ✅ Automatic change detection
- ✅ Change notifications
- ✅ Change review workflow
---
### Milestone 5: AI & Multi-Cluster (Months 5–6)
**Sprint 15–16: LLM Integration & Anomaly Detection**
**Backend**:
- ✅ LLM service (OpenAI/Anthropic/Azure)
- ✅ Prompt engineering
- ✅ Anomaly scoring algorithm
- ✅ Anomaly storage
- ✅ Scheduled anomaly checks
**Frontend**:
- ✅ LLM configuration page
- ✅ Anomaly Detection page
- ✅ Anomaly detail view
- ✅ Anomaly workflow (assign, resolve)
**Deliverables**:
- ✅ AI-powered anomaly detection
- ✅ LLM analysis reports
- ✅ Anomaly alerting
---
**Sprint 17–18: Import/Export & Multi-Cluster**
**Backend**:
- ✅ CSV export logic
- ✅ Graph JSON export
- ✅ Import parser (CSV, JSON)
- ✅ Import validation
- ✅ Multi-cluster management
- ✅ Cross-cluster queries
**Frontend**:
- ✅ Import/Export page
- ✅ Job progress tracking
- ✅ Multi-cluster selector
- ✅ Cross-cluster view
**Deliverables**:
- ✅ Data export (CSV, JSON)
- ✅ Data import with validation
- ✅ Multi-cluster dashboard
- ✅ Cross-cluster dependency view
---
**Sprint 19–20: Webhooks & SIEM Integration**
**Backend**:
- ✅ Webhook engine
- ✅ Event filtering
- ✅ Delivery retry logic
- ✅ SIEM connectors (Splunk, Elastic, Sentinel)
**Frontend**:
- ✅ Webhook configuration page
- ✅ Webhook test tool
- ✅ Delivery logs
**Deliverables**:
- ✅ Webhook notifications working
- ✅ SIEM integration tested
- ✅ Alert templates
**Phase 2 Success Criteria**:
- ✅ Historical data retained 30+ days
- ✅ Change detection 95% accuracy
- ✅ LLM response <10 seconds
- ✅ Multi-cluster 5+ clusters
- ✅ Import/export 10MB+ files
---
## 🔮 Phase 3: AI/ML & Enterprise
**Target Duration**: 7–9 months
**Status**: Conceptual
**Goal**: AI/ML and enterprise features
### Milestone 6: Policy & Change Simulation (Months 7–8)
**Sprint 21–22: What-If Analysis Engine**
**Backend**:
- ⏳ Policy parser (YAML)
- ⏳ Simulation engine
- ⏳ Impact calculator
- ⏳ Recommendation engine
- ⏳ Change simulation engine
- ⏳ Dependency impact analyzer
- ⏳ Risk scoring algorithm
**Frontend**:
- ⏳ Policy Simulator page
- ⏳ Policy editor (Monaco)
- ⏳ Simulation results view
- ⏳ Impact visualization
- ⏳ **Change Simulation page**
- ⏳ **CAP workflow interface**
- ⏳ **Approval dashboard**
**Deliverables**:
- ⏳ Network policy simulation
- ⏳ Impact analysis
- ⏳ What-if scenarios
- ⏳ **Change impact assessment**
- ⏳ **CAP workflow integration**
---
**Sprint 23–24: CAP Integration & Change Management**
**Backend**:
- ⏳ Change Request API
- ⏳ Approval workflow engine
- ⏳ ServiceNow integration
- ⏳ Jira integration
- ⏳ Pre/post-change validation
- ⏳ Automated rollback triggers
- ⏳ Change history tracking
**Frontend**:
- ⏳ Change Request creation wizard
- ⏳ Impact analysis dashboard
- ⏳ Approval workflow UI
- ⏳ Change history viewer
- ⏳ Analytics dashboard
**Integrations**:
- ⏳ ServiceNow connector
- ⏳ Jira connector
- ⏳ PagerDuty integration
- ⏳ Slack/Teams notifications
**Deliverables**:
- ⏳ **Full CAP workflow**
- ⏳ **Change approval automation**
- ⏳ **Impact assessment reports**
- ⏳ **Integration with enterprise tools**
- ⏳ **Automated rollback capability**
---
**Sprint 25–26: Universal Ingestion & Governance**
**Backend**:
- ⏳ Prometheus metrics collector
- ⏳ Service mesh telemetry integration (Istio, Linkerd)
- ⏳ APM trace correlation (Jaeger, Zipkin)
- ⏳ Log correlation engine
- ⏳ CI/CD event collectors (GitLab, Jenkins, ArgoCD)
- ⏳ Provenance tracking system
- ⏳ Admission controller webhook
- ⏳ Policy-as-code engine
- ⏳ CI/CD plugins (GitHub Actions, GitLab CI, Jenkins)
**Frontend**:
- ⏳ Data source configuration page
- ⏳ Provenance viewer
- ⏳ Policy management UI
- ⏳ CI/CD integration dashboard
**Deliverables**:
- ⏳ Multi-source data ingestion working
- ⏳ Dependency provenance tracking
- ⏳ Admission controller deployed
- ⏳ CI/CD plugins for 3+ platforms
---
**Sprint 27–28: DR Assessment & Predictive Analytics**
**Backend**:
- ⏳ DR posture scanner
- ⏳ RPO/RTO calculator
- ⏳ Backup status checker (Velero, Stash)
- ⏳ Replication lag monitor
- ⏳ ML model training pipeline
- ⏳ Traffic forecasting model
- ⏳ Capacity planning algorithm
**Frontend**:
- ⏳ DR Posture Dashboard
- ⏳ Stateful workload inventory
- ⏳ Backup compliance view
**Deliverables**:
- ⏳ DR posture assessment for 100+ workloads
- ⏳ RPO/RTO compliance reporting
- ⏳ Traffic predictions
- ⏳ Capacity recommendations
---
### Milestone 7: AI & Enterprise Features (Month 9)
**Sprint 29–30: Natural Language & Explainable AI**
**Backend**:
- ⏳ Natural language query parser
- ⏳ Intent recognition (90%+ accuracy)
- ⏳ Query-to-SQL/GQL translator
- ⏳ Evidence collection engine
- ⏳ Confidence scoring algorithm
- ⏳ Provenance linker
- ⏳ Interactive debugging assistant
**Frontend**:
- ⏳ Natural language search bar
- ⏳ Conversational UI
- ⏳ Evidence viewer
- ⏳ AI explanation panel
- ⏳ Interactive troubleshooting wizard
**Deliverables**:
- ⏳ Natural language queries working
- ⏳ 90%+ intent recognition accuracy
- ⏳ Grounded AI responses with evidence
- ⏳ AI-assisted troubleshooting
---
**Sprint 31–32: Advanced Features & Polish**
**Backend**:
- ⏳ Custom dashboard builder API
- ⏳ Report generation (PDF)
- ⏳ Compliance scanning
- ⏳ Auto-remediation engine
**Frontend**:
- ⏳ Custom dashboard builder (drag & drop)
- ⏳ Report scheduler
- ⏳ Compliance dashboard
- ⏳ Remediation playbooks
**Deliverables**:
- ⏳ Custom dashboards
- ⏳ Automated reports
- ⏳ Compliance reports (PCI-DSS, HIPAA, SOC 2)
- ⏳ Auto-remediation playbooks
**Phase 3 Success Criteria**:
- ⏳ What-if simulation <30s
- ⏳ **Change simulation <20s**
- ⏳ Prediction accuracy >80%
- ⏳ **Change approval automation working**
- ⏳ **CAP integration with ServiceNow/Jira**
- ⏳ Custom dashboard builder working
- ⏳ Compliance reports generated
---
## 📊 Sprint Structure
### Typical 2-Week Sprint
**Week 1**:
- Day 1–2: Sprint planning, task breakdown
- Day 3–5: Development (backend + frontend parallel)
- Day 6–8: Integration & testing
- Day 9–10: Code review, refinement
**Week 2**:
- Day 1–3: Bug fixes, polish
- Day 4–5: Documentation
- Day 6–7: QA testing
- Day 8: Demo & retrospective
- Day 9–10: Sprint planning (next sprint)
---
## 👥 Team Structure
### Recommended Team (Phase 1)
| Role | Count | Responsibility |
|------|-------|------------------|
| **Product Owner** | 1 | Backlog, prioritization |
| **Scrum Master** | 1 | Sprint facilitation |
| **Backend Developer** | 2 | Python, FastAPI, databases |
| **Frontend Developer** | 2 | React, TypeScript, UI/UX |
| **DevOps Engineer** | 1 | K8s, CI/CD, infrastructure |
| **QA Engineer** | 1 | Testing, automation |
| **UI/UX Designer** | 0.5 (part-time) | UI design, wireframes |
**Total**: 7.5 FTE
### Expansion in Phase 2
- +1 Backend Developer (LLM, ML)
- +1 Data Engineer (ClickHouse optimization)
- +1 Security Engineer (Penetration testing)
---
## 🎯 Key Performance Indicators (KPIs)
### Development KPIs
| KPI | Target |
|-----|--------|
| Sprint Velocity | 40–50 story points/sprint |
| Code Coverage | >80% |
| Bug Escape Rate | <5% |
| API Response Time | p95 < 500ms |
| Frontend Load Time | <3 seconds |
### Product KPIs (Post-Launch)
| KPI | Target (6 months) |
|-----|------------------|
| Active Users | 100+ |
| Clusters Managed | 50+ |
| Daily API Calls | 1M+ |
| Anomalies Detected | 1000+ |
| Customer Satisfaction | NPS > 50 |
---
## 🚧 Risks & Mitigation
### Technical Risks
| Risk | Impact | Probability | Mitigation |
|------|--------|-------------|------------|
| Inspektor Gadget performance issues | High | Medium | Early POC, load testing |
| Neo4j scalability limits | High | Low | Benchmark, alternative (Neo4j) |
| LLM API cost explosion | Medium | Medium | Rate limiting, caching |
| Kubernetes version compatibility | Medium | High | Support 3 latest versions |
### Project Risks
| Risk | Impact | Probability | Mitigation |
|------|--------|-------------|------------|
| Scope creep | High | High | Strict backlog prioritization |
| Team turnover | High | Medium | Knowledge sharing, documentation |
| Dependency delays | Medium | Medium | Buffer time in planning |
| Budget overrun | High | Low | Bi-weekly budget review |
---
## 📅 Release Schedule
### Alpha Release (End of Phase 1 - Month 3)
- Internal testing
- Limited feature set
- Kubernetes clusters only
### Beta Release (End of Phase 2 - Month 6)
- Select customer testing
- Full feature set (Phase 1 + 2)
- OpenShift support added
### GA (General Availability) Release (End of Phase 3 - Month 9)
- Public release
- All features complete
- Production-ready
- Enterprise support
---
## 🔄 Continuous Improvement
### Post-GA (Month 10+)
**Maintenance & Support**:
- Bug fixes (P0/P1: 24h, P2: 1 week, P3/P4: next sprint)
- Security patches (immediate)
- Dependency updates (monthly)
**Feature Enhancements**:
- Community feedback incorporation
- New gadget modules
- New LLM providers
- Performance improvements
**Innovation**:
- AI/ML model improvements
- New visualization types
- Advanced analytics
- Integration with more tools
---
**Version**: 1.0.0
**Last Updated**: January 2025
**Status**: Detailed Roadmap