# Async-CA Polling — Operator Reference
|
|
|
|
> Last reviewed: 2026-05-05
|
|
|
|
Closes audit fix #5 from the 2026-05-01 issuer-coverage acquisition-readiness audit.
|
|
|
|
## What this is
|
|
|
|
Four issuer connectors talk to Certificate Authorities that issue
|
|
certificates **asynchronously** — `IssueCertificate` returns an order
|
|
ID immediately, and the caller (or scheduler) must call
|
|
`GetOrderStatus` later to retrieve the issued cert:
|
|
|
|
- **DigiCert** (CertCentral)
|
|
- **Sectigo** (Certificate Manager)
|
|
- **Entrust** (Certificate Services / CA Gateway)
|
|
- **GlobalSign** (Atlas HVCA)
|
|
|
|
Pre-fix, each connector's `GetOrderStatus` made one HTTP call per
|
|
invocation with no exponential backoff, no retry cap, and no deadline.
|
|
Under a renewal sweep, certctl would hammer the upstream CA's
|
|
rate-limit budget. A 429 response was treated as a hard error,
|
|
which then caused the scheduler to retry on the next tick — re-fanning
|
|
out the same call that just got rate-limited.
|
|
|
|
Post-fix, `GetOrderStatus` blocks for up to `PollMaxWait` (default
|
|
10 minutes) doing **bounded internal polling**:
|
|
|
|
```
|
|
attempt 1 → wait 5s → attempt 2 → wait 15s → attempt 3 → wait 45s →
|
|
attempt 4 → wait 2m → attempt 5 → wait 5m → ... (capped at 5m)
|
|
```
|
|
|
|
±20% jitter applied at every wait so multiple certctl instances
|
|
never synchronize on the upstream CA's rate-limit window. The
|
|
`PollMaxWait` deadline is a hard cap; if the upstream still hasn't
|
|
completed by then, `GetOrderStatus` returns `StillPending` and the
|
|
scheduler can re-enqueue the job for a future tick.
|
|
|
|
## Status-code triage
|
|
|
|
Each connector classifies HTTP responses to drive polling decisions:
|
|
|
|
| Response | Meaning | Decision |
|
|
|---|---|---|
|
|
| 2xx + status="issued"/"completed" | Cert ready | Done — return the cert |
|
|
| 2xx + status="pending"/"processing" | Still working | StillPending — keep polling |
|
|
| 2xx + status="rejected"/"denied"/"failed" | Permanent | Done — return `OrderStatus{Status:"failed"}` |
|
|
| 2xx + parse failure | Body is broken | Failed — return error |
|
|
| 4xx (404/400/401/403) | Permanent client error | Failed — return error |
|
|
| 429 (rate limited) | Transient | StillPending — keep polling with backoff |
|
|
| 5xx | Transient | StillPending — keep polling with backoff |
|
|
| Network / TLS error | Transient | StillPending — keep polling with backoff |
|
|
|
|
## Operator tuning
|
|
|
|
Each connector exposes a `PollMaxWaitSeconds` config field and
|
|
matching env var:
|
|
|
|
| Connector | Env var | Default |
|
|
|---|---|---|
|
|
| DigiCert | `CERTCTL_DIGICERT_POLL_MAX_WAIT_SECONDS` | 600 (10m) |
|
|
| Sectigo | `CERTCTL_SECTIGO_POLL_MAX_WAIT_SECONDS` | 600 (10m) |
|
|
| Entrust | `CERTCTL_ENTRUST_POLL_MAX_WAIT_SECONDS` | 600 (10m) |
|
|
| GlobalSign | `CERTCTL_GLOBALSIGN_POLL_MAX_WAIT_SECONDS` | 600 (10m) |
|
|
|
|
Tune up (e.g., `86400` = 24 hours) for **Entrust approval-pending
|
|
workflows** where humans manually approve enrollments. Tune down (e.g.,
|
|
`60`) for high-throughput environments that prefer to recycle the
|
|
scheduler tick rather than block one renewal goroutine for minutes.
|
|
|
|
A value of 0 (or unset) falls back to the package default in
|
|
`internal/connector/issuer/asyncpoll`.
|
|
|
|
## Failure modes
|
|
|
|
**Upstream returns 429 forever.** The Poller respects the backoff
|
|
(5s → 15s → 45s → 2m → 5m), so a sustained 429 stream burns through
|
|
the full `PollMaxWait` budget with at most 7-8 attempts (instead of
|
|
~600 attempts at 1/sec). After `PollMaxWait` expires, `GetOrderStatus`
|
|
returns `StillPending`; the scheduler re-enqueues for the next tick.
|
|
The total request volume against the upstream is bounded by `tick
|
|
interval / minimum backoff` — typically 1-2 requests per minute even
|
|
under heavy load.
|
|
|
|
**Sectigo `collectNotReady` sentinel.** When the SCM status endpoint
|
|
reports `Issued` but the cert collect endpoint isn't yet ready, the
|
|
old code branched into a special "pending" return. Now that branch
|
|
returns `StillPending` from the poll closure, so the cert collection
|
|
rides the same backoff schedule.
|
|
|
|
**Entrust approval-pending.** The `AWAITING_APPROVAL` status maps to
|
|
`StillPending`. With the default `PollMaxWait=10m`, the scheduler
|
|
will re-enqueue once per tick if approval hasn't happened yet; with
|
|
`PollMaxWait=24h` the same renewal goroutine waits the full approval
|
|
window. Pick the latter when you have many approval-pending
|
|
enrollments per tick.
|
|
|
|
## Where the implementation lives
|
|
|
|
- `internal/connector/issuer/asyncpoll/asyncpoll.go` — shared `Poller`
|
|
with backoff math, jitter, deadline, and ctx-aware cancellation.
|
|
- `internal/connector/issuer/digicert/digicert.go` —
|
|
`pollOrderOnce` + `GetOrderStatus` orchestrator.
|
|
- `internal/connector/issuer/sectigo/sectigo.go` —
|
|
`pollEnrollmentOnce` + status-code permanence triage
|
|
(`isPermanentStatusError`).
|
|
- `internal/connector/issuer/entrust/entrust.go` —
|
|
`pollEnrollmentOnce` + approval-pending mapping.
|
|
- `internal/connector/issuer/globalsign/globalsign.go` —
|
|
`pollCertificateOnce` (serial-number tracking).
|
|
- `internal/connector/issuer/asyncpoll/asyncpoll_test.go` — 11 unit
|
|
tests covering happy path, transient-then-success, Failed
|
|
termination, MaxWait timeout, last-error wrap, ctx cancel,
|
|
multiplicative backoff, jitter bounds, defaults.
|
|
|
|
## Audit blocker reference
|
|
|
|
the 2026-05-01 issuer coverage audit, Top-10 fix #5
|
|
(Part 1.5 finding #4: "No polling backoff for async CAs").
|