Josh Siviour 48749576c3 test: rebalance E2E into in-process integration tier + shared-guest live scenarios (#556)
* test: add in-process integration test tier

Roughly half of the behavioural tests under tests/e2e/ assert control-plane
API shapes, authz and error codes that need no live environment, yet they can
only run against a tofu-provisioned environment on a scarce self-hosted
runner. This adds the tier they can move down to.

The real gateway router runs in-process: SetupRoutes() is a pure function of
GatewayConfig, so it serves from an httptest server over embedded NATS
JetStream with real IAM/STS services and genuine SigV4 verification. Only the
daemon side of the wire is faked -- the ec2.*/ebs.* NATS subjects a live node
would answer are stubbed per test.

Nothing is provisioned and no fixed ports are bound, so the tier runs
concurrently on a shared build host and is safe as a CI front gate ahead of
the live suites. It is build-tagged and kept out of preflight, which stays
unit-only.

* test(integration): add IAM/STS client accessors and port the zero-stub authz tests

Adds IAMClient/STSClient plus ClientsWithCreds/ClientsWithSessionCreds so a
test can act as a principal other than the seeded root user, and stubs the
node-discovery subject in StartGateway so call paths that trigger discovery
resolve immediately instead of riding out the fan-out timeout.

Ports the four enforcement tests that guard on ec2:DescribeRegions, a
gateway-local action, so they need no daemon-side stub at all.

* test(integration): port remaining IAM/STS authz tests from e2e

Ports TestIAMUserCRUD, TestIAMAccessKeyLifecycle, TestIAMUserAuthentication,
TestIAMPolicyCRUD, TestIAMPolicyAttachmentEnforcement, TestIAMPolicyLifecycle,
TestIAMGroupsLifecycle, TestIAMRolesAndProfiles and
TestSTSAssumeRoleAndGetCallerIdentity from tests/e2e/iam/ into the in-process
integration tier. Each test now self-bootstraps its own users/policies/roles
instead of relying on shared suite-level state, since every integration test
gets its own gateway and embedded NATS. TestIAMRolesAndProfiles stubs
ec2.IamProfileAssociation.describe because DeleteInstanceProfile always
counts live associations over NATS regardless of which guard actually fires.
TestIAMCleanup is not ported: it only swept a shared long-lived E2E
environment, and every ordering/dependency assertion it made is already
covered by TestIAMPolicyLifecycle, TestIAMGroupsLifecycle and
TestIAMRolesAndProfiles's own delete-conflict guards.

* test(e2e): remove IAM/STS authz tests migrated to the integration tier

All 13 signed-request authz tests plus TestIAMCleanup now have faithful,
mutation-proven equivalents in tests/integration/ — the gateway dispatches
IAM/STS actions directly with no daemon hop, so the in-process tier is a
faithful and far cheaper substitute. The iam/ e2e suite now runs only
TestIAMInstanceProfileAssociation and TestIMDS.

Drop the now fully-dead iam_helpers_test.go alongside the six deleted test
files, and remove harness.IAMGroupARN/IAMDeleteGroupBestEffort, which had no
remaining caller anywhere in the repo once iam_groups_test.go was gone.

* feat(integration): daemon-lite harness for key/tags/routetable/vpc

Adds DaemonLite, an in-process stand-in for a live spinifex daemon that
subscribes the real key, tags, route table, and VPC/subnet/SG/IGW service
implementations directly to their NATS subjects, backed by memory and
embedded-JetStream stores. Ports TestKeyPairs, TestTagManagement,
TestRouteTableValidation, and TestReplaceRouteConvergence from
tests/e2e/single so the integration tier drives genuine daemon-side
business logic instead of StubSubject canned replies.

vpcd (OVN) is out of scope, so its "vpc.create-sg"/"vpc.delete-sg"
acknowledgements are stubbed with a fixed success reply — the SG record
itself is still written by the real service impl before that event fires,
so the stub only unblocks the synchronous round-trip rather than
replacing tested behavior.

* ci(e2e): gate live E2E jobs behind the in-process integration tier

Runs the in-process integration suite first, on the ci-single runner host
rather than inside a provisioned VM, so a broken control plane is caught
before either live job pays the Spinifex install. Both e2e_single and
e2e_multi now require it, and e2e_status treats a skipped integration job as
a failure so the gating status cannot go green on a gate that never ran.

Drops the shadow-mode suite selector: targeted per-diff suite selection is
not the direction being pursued, and leaving a non-functional shadow job in
the gating workflow only invited it to be mistaken for a live gate.

* test(e2e): remove single/ tests superseded by daemon-lite ports

TestKeyPairs, TestTagManagement, TestRouteTableValidation, and
TestReplaceRouteConvergence now have proven-equivalent ports in
tests/integration/ (mutation testing confirmed parity). Delete the
e2e originals and their runX helpers, along with keypair_test.go's
and tags_test.go's file-local helpers left with no caller.
generateImportPubKey is shared by other single/ tests so it moves to
helpers_test.go instead of being deleted. Slims the manifest-lint
baseline for the removed create-call entries.

* ci: run the lb e2e suite on multinode only

Both e2e jobs filter SUITES by exclusion, and neither excluded lb, so the
suite ran twice per e2e run: 354s on single and 654s on multi. Balancing
across instances on one node is not a deployment mode we support, and
ELBv2 proper requires two AZs, so the single-node run was redundant.

Drops ~354s from the single-node job, which is the gate critical path.

* test(integration): port 3 of 7 ECR tests to the in-process tier

Wires the gateway's ECR control plane (repository/policy/lifecycle
metadata over an in-process daemon-lite NATS subscriber, blob and
manifest bytes via a memory object store, JWT issuer/verifier keyed off
the existing IAM master key) into the integration harness, and ports
TestECRControlPlane, TestECRGetLoginPassword, and
TestECRIAMAuthorization_AssumedRolePullOnly from tests/e2e/ecr — each
proven equivalent by mutation (evaluatePrincipalPolicy forced to allow,
and the repo-describe path forced to not-found) before its E2E original
was removed.

The other 4 authorization tests (PullOnly, ReadOnly,
DetachPolicyDeniesImmediately, DeactivatedKeyReturns401) stay on the E2E
tier: AttachUserPolicy lacks the AWS-managed-ARN existence-check bypass
that AttachRolePolicy/AttachGroupPolicy already have, so attaching
AmazonEC2ContainerRegistryPullOnly/ReadOnly straight to a user fails
NoSuchEntity in both tiers alike. Left untouched pending a fix to that
shared IAM code.

* fix(iam): accept AWS-managed policy ARNs on AttachUserPolicy

AttachUserPolicy called getPolicyByARN unconditionally, so attaching an
AWS-managed ARN to a user returned NoSuchEntity. AttachRolePolicy and
AttachGroupPolicy already skip that lookup for AWS-managed ARNs and store
them opaquely; the user path was missed when that guard was introduced.

ListAttachedUserPolicies had the mirror of the same gap: it resolved every
ARN through getPolicyByARN and silently dropped the ones it could not find,
so a managed ARN would disappear from the listing rather than round-trip.

Evaluation already handled these correctly via resolveAttachedPolicy, so
only the write and list paths needed the guard.

* test(integration): port remaining 4 ECR authorization tests

Ports TestECRIAMAuthorization_PullOnly, _ReadOnly,
_DetachPolicyDeniesImmediately, and _DeactivatedKeyReturns401 from
tests/e2e/ecr now that AttachUserPolicy accepts AWS-managed policy ARNs.
Each was proven equivalent by mutation before its E2E original was
removed: PullOnly/ReadOnly/DetachPolicyDeniesImmediately fail when
evaluatePrincipalPolicy is forced to always allow, and
DeactivatedKeyReturns401 fails when the access-key-active check in
resolveECRLongLivedPrincipal is bypassed. All mutants were reverted and
a clean run confirmed before committing.

tests/e2e/ecr/iam_authorization_test.go is now fully removed — every
test it held has an in-process equivalent, and its helpers had no other
callers in the package.

* ci: select e2e suites by allow-list instead of deny-list

Both jobs filtered SUITES by exclusion, so any suite named in neither
deny-list ran in both jobs. That is how lb came to run twice per e2e run,
and it makes adding a suite silently fan it out everywhere.

Each job now names the suites it is eligible to run. Selection is still
driven by SUITES, so this is behaviour-preserving for the current default:
single/iam/cert on the single-node job, multinode/lb/cert on the multi-node
job, exactly as before. eks, ecs and storagegrowth are listed as eligible on
the single-node job but are not yet in the default SUITES.

* test(e2e): delete seven tests with no coverage

TestFinalClusterStats and TestInstanceLaunch assert nothing beyond
what other callers of their shared helpers already imply. The
multinode baseline, volume, guest-SSH, and preflight tests duplicate
single-node coverage or exercise per-guest behaviour that isn't
cluster-specific. TestMultinodeInstanceDistribution can't fail: three
independent RunInstances calls with no placement group make a strict
spread assertion flaky and a loose one meaningless.

Preflight checks (/dev/kvm writability, peer SSH reachability) move
into requireMultiNodeFixture so the package fixture singleton still
fails fast with a clear message instead of disappearing along with
the dedicated test. The remaining callers of needInstanceTrio
(CrossNodeOps, CrossNodeGateway, NodeFailure, VolumeDurability) still
trigger the shared trio launch on their own, so removing the
distribution and volume-lifecycle tests doesn't leave it unbuilt.

Also slims the manifest-lint baseline entry for the deleted
multinode volume test.

* fix(e2e): require full 3-node spread in TestMultinodeSpread

SpreadPlacement passed at unique>=3, warned via t.Logf at unique==2,
and only failed below that. A 33% spread failure (two instances
colocated) passed with a log line. The 243.6s NAT-egress scenario that
follows only proves what it claims to if the private trio actually
landed on three distinct chassis, so that premise needs to be a hard
assertion, not a warning.

* refactor(e2e): drop the unused spread-assertion harness helpers

AssertSpreadAcrossNodes and CountInstancesPerNode lost their only caller when
the instance-distribution test was removed. Beyond being dead, the assertion
helper documented minNodes=1 as an acceptable logging-only mode inherited from
the bash driver, which is the pattern that let a placement test pass while
every instance landed on one node.

InstanceHostingNode and its ps helpers stay; five multinode tests use them.

* fix(ec2): stop leaked goroutines on prepareEFIVolume error paths

newViperblock starts the chunk uploader and WAL syncer unconditionally,
but prepareEFIVolume only released them on the happy path via Close().
Six error returns between acquisition and Close left both goroutines
running. Add a defer immediately after acquisition, matching the
sibling prepareRootVolume; Close() remains the durability boundary.

* test(predastore): add real predastore fixture for integration tests

Extract predastore_integration_test.go's inline daemon startup into a
reusable testutil/predastore package so tests/integration can point
DaemonLite-style wiring at a real S3-compatible backend instead of an
unreachable host. Kept as its own leaf package rather than folding into
the shared testutil package: it transitively imports predastore's
quicclient, whose package-level connection pool starts a permanent
goroutine at init that would trip goleak checks in any of the ~80
other packages that import testutil for unrelated NATS helpers.

* test(integration): migrate CreateVolume to assert real predastore persistence

Add StartVolumeDaemonLite, an opt-in DaemonLite variant wired to the
real predastore fixture, and migrate TestCreateVolume_PersistsToRealPredastore
off memory-backed DaemonLite so CreateVolume/DescribeVolumes exercise
viperblock's real S3 backend end to end instead of stopping at input
validation.

* test(integration): add real storage-state oracle for CreateVolume

DescribeVolumes only proves the handler's own read path agrees with its
own write path, both via the same deserialization; it cannot catch a bug
in a field it never re-derives (e.g. a unit-conversion error in the bytes
handed to viperblock, since VolumeMetadata.SizeGiB is copied from the
request directly). vbscan reads a volume's persisted config.json and
chunk objects straight over S3, independent of any spinifex handler code,
so TestCreateVolume_PersistsToRealPredastore can assert on what viperblock
actually wrote rather than only on what the handler claims.

vbscan is a local reimplementation of scripts/vbrefscan's read-only scan
rather than an import: spinifex cannot depend on mulga, the module that
contains it. It only reimplements the config/chunk-listing half of
vbrefscan — the checkpoint-based reference-integrity half needs
viperblock.ParseBlockCheckpointBytes, which does not exist in the
viperblock version spinifex currently depends on (v1.12.1) and is also
moot for this volume: CreateVolume never calls SaveLiveCheckpoint, so a
freshly created volume has no checkpoint to scan regardless of version.

* refactor(test): move the predastore daemon fixture out of the coverage scope

test-cover runs go test ./spinifex/..., so anything under spinifex/ is
compiled and measured. The daemon fixture cannot be exercised by unit
tests, so it reported a coverage gap no unit test could close. The e2e
harness already avoids this by living under tests/; the fixture now
does the same. vbscan stays put, being ordinary library code with its
own unit tests.

* test(integration): migrate RunInstances multi-count expansion off live guests

RunInstances with MinCount/MaxCount=2 expands into a single per-node
targeted launch (distributeInstances in gateway/ec2/instance/placement.go)
before the daemon-facing NATS hop, so the real gateway router plus a
stubbed daemon response is sufficient to prove it — no throwaway VM is
needed to exercise the expansion logic itself.

The live single-node E2E test's WaitForInstanceState/TerminateInstances
sequence was teardown hygiene for the real guests it booted, not an
assertion of the expansion behavior, so it is dropped rather than
emulated. The migrated test additionally asserts the per-node launch
request itself carries MinCount=MaxCount=2, proving the count actually
propagates rather than the launch succeeding by coincidence or via the
zero-daemon degenerate path in placement.go.

* docs: drop a doc reference to the deleted live test

* test(integration): migrate launch-template RunInstances expansion off live guests

RunInstances --launch-template resolves ImageId/InstanceType from the
stored template entirely gateway-side (expandLaunchTemplate, before
validation/placement/the daemon-facing NATS hop), so proving it forwards
the resolved fields never needed a real guest boot. Ports the assertion
to tests/integration via a new opt-in StartLaunchTemplateDaemonLite (real
LaunchTemplateServiceImpl over embedded JetStream) plus a direct
subscription on the per-node launch subject to capture what the gateway
actually dispatched, rather than only the client-visible response.

The live test keeps its CRUD/versioning lifecycle (create/modify/delete
version, tag-filtered describe) — none of it touches a guest — and drops
only the RunInstances-from-template + wait-for-running + terminate tail,
whose only job was waiting out a real boot to read back fields already
proven resolved.

* test(integration): migrate KV-only account-scoping checks off live tenants

Ports the KeyPair/VPC-Subnet/IGW-EIGW/AccountSettings cross-account
isolation assertions from tests/e2e/single/account_test.go to the
in-process integration tier. Each of these resources resolves ownership
from a plain account-scoped KV key (utils.AccountKey(accountID, id), or
an account-keyed settings record) with no vm.Manager or real guest
involved, so DaemonLite now also wires the real EgressOnlyIGWServiceImpl
and AccountSettingsServiceImpl alongside the existing VPC/IGW/Key
services. Two independently minted tenant accounts (via
IAMService.CreateAccount/CreateUser/CreateAccessKey/CreatePolicy/
AttachUserPolicy, in-process — the same calls runAccountCreate makes
without the CLI/stdout round-trip) replace the live tier's carousel so
isolation is checked between real, separately owned accounts.

Left live: instance scoping (Step2) and volume scoping (Step3) —
checkInstanceOwnership, the actual cross-account gate for stop/start/
reboot/terminate/attach-volume, runs daemon-side only after a real
vm.Manager lookup, so it cannot be exercised without a live guest.
Snapshot scoping (Step5) needs a real backing volume for CreateSnapshot
(viperblock, out of DaemonLite's scope), so it stays live entirely rather
than split off only its two KV-only assertions. Global-resources (Step9)
carries no account branching in the handlers at all, so asserting its
equality across two accounts wouldn't exercise anything a fake node
responder didn't already trivially satisfy — not migrated.

* test(integration): migrate launch-template CRUD lifecycle off live guests

TestLaunchTemplates booted zero guests: its RunInstances coverage had
already moved to TestRunInstances_LaunchTemplateExpansion, leaving only
template CRUD/versioning assertions occupying a full live-cluster slot.
Port the remaining create/describe/version/modify/delete lifecycle,
including the SourceVersion merge and a nested timestamp round-trip, into
TestLaunchTemplates_CRUDLifecycle against the in-process integration
gateway.

* refactor(tests): move spot instance lifecycle coverage to integration tier

RequestSpotInstances is a mock over on-demand RunInstances (no bidding,
interruption, or reclamation), so booting real VMs in the e2e tier proved
nothing spot-specific. Migrate the SIR CRUD lifecycle (request, describe,
cancel, close-on-terminate, insufficient-capacity error) to a NATS-level
integration test that exercises the real gateway orchestration and daemon
service impl without a live guest. Real-VM-boot assertions are already
covered by TestRunInstances_MultiCountExpansion and the e2e baseline tests.

* fix(tests): share one embedded NATS server across the integration package

ClientTokenStore in spinifex/gateway/ec2/instance is a process-wide
sync.Once singleton bound to whichever *nats.Conn first initialises it.
Every integration test booted its own embedded NATS server, so the first
RunInstances-calling test captured the singleton, and any later test
inherited a KV handle bound to that server's now-closed connection.

TestMain now boots one embedded NATS+JetStream server for the whole
package; every StartGateway call connects into its own dynamically
provisioned NATS account (accountAuthenticator in shared_nats.go), giving
each test a private JetStream namespace despite the shared server, and
none of the per-test connections are closed until every test has finished
- whichever one the singleton latches onto stays live for the run.

Also wire the suite into the required PR gate: it was previously only
invoked from e2e.yml's push-triggered (main/dev), self-hosted "Integration
(front gate)" job, so a regression here never blocked a PR. The whole
package runs in single-digit seconds, so it now runs inline in
`make preflight` and as its own step in spinifex.yml's build_and_test job.

* test(integration): migrate serial-console access checks off live guests

Enable/Disable/GetSerialConsoleAccessEnabled is pure gateway+account-settings
logic with no guest involved, so it moves to the in-process integration tier
against the real AccountSettingsServiceImpl wired into DaemonLite.

* test(integration): migrate DescribeImages round-trip off live guests

runImage's AMI describe round-trip needs no real cluster: it registers an
AMI against a hand-seeded snapshot via the real ImageServiceImpl, backed by
a new StartImageDaemonLite helper wiring RegisterImage/DescribeImages onto an
in-memory object store.

* test(integration): migrate predastore object lifecycle off live guests

runPredastoreObjectLifecycle only needs a real predastore daemon, not a
tofu-provisioned cluster: it now runs against tests/fixtures/predastore's
in-process fixture, covering the same create/put/get/delete/list contract.

* test(integration): migrate ListFoundationModels catalog check off live cluster

ListFoundationModels is pure gateway-side static catalog logic with no
NATS/daemon hop, so it moves to the integration tier via a new BedrockClient
harness accessor; this tier configures no credential resolver, so the
Anthropic entry's absence is asserted explicitly rather than left optional.

* test(integration): cover RunInstances client-token idempotency

Proves replaying the same ClientToken through the real gateway returns the original reservation without a second daemon dispatch, and a different token launches independently.

* test(integration): cover RunInstances launch-template expansion

Proves version selection (omitted Version resolves to the template default, explicit Version selects that version) and field precedence (explicit RunInstances parameters override the template, unset fields inherit it) through the real gateway.

* test(integration): cover RunInstances malformed-input rejection

Proves a malformed ImageId and a malformed targeted-launch CapacityReservationId are rejected before any NATS dispatch, with no daemon stub registered so a regression that let either through would fail fast instead of hanging.

* test(integration): cover RunInstances iam:PassRole enforcement

Proves a caller granted ec2:RunInstances but not iam:PassRole on an instance profile's role is denied, and the identical session succeeds once PassRole is granted for that exact role ARN.

* test(integration): cover RunInstances placement-group strategy routing

Adds a placement-group daemon-lite wiring a real PlacementGroupServiceImpl over NATS, then proves spread strategy assigns exactly one instance per node while cluster strategy pins the whole launch to the single highest-capacity node.

* test(integration): cover RunInstances capacity distribution across nodes

Proves the default (non-placement-group) path packs a multi-instance launch across nodes proportionally to spare capacity rather than exhausting one node first.

* test(e2e): merge SameSGComms and SGToSGDatapath around one client/target pair

Both booted their own instance pair to check SG-to-SG datapath enforcement
and same-default-SG east-west connectivity. Merging them around one shared
client/target pair cuts four boots to two, and converting the inline
harness.Step sequence into named t.Run stages (PortGroupMembership,
AllowedTraffic, DeniedTraffic, RevokeAndVerifyBlocked,
ReauthorizeAndVerifyRestored, SameSGComms) gives each its own pass/fail
attribution instead of one opaque test result.

SameSGComms now runs last and joins the default SG onto each ENI via
ModifyNetworkInterfaceAttribute only after every SG-to-SG allow/deny
assertion has already recorded its own result, since the default SG's
self-reference rule admits all traffic between co-members and would
otherwise defeat the denied-traffic check.

* test(e2e): merge default-SG reachability, guest DNS, and egress enforcement

DefaultSGReachabilityBaseline, GuestDNSResolution, and SecurityGroupEgress
each booted their own instance to check one facet of "a guest is reachable
only when policy says so": ingress deny/authorize, resolver + WAN egress,
and egress ACL enforcement. Merging them around one shared guest cuts
three boots to one, with named t.Run stages (Deny, Authorize, Resolver,
WANEgress, RevokeEgress/RestoreEgress) giving each its own attribution.

The egress revoke/restore round-trip now mutates this scenario's own
dedicated SG instead of the shared default SG the rest of the suite
depends on, isolating its egress-rule mutation from every other test.

* fix(ci): single-quote e2e test_run regex across the ssh boundary

* fix(e2e): anchor SG egress-enforcement probe to a WAN IP, not the gateway

* test(e2e): merge single-node guest churn tests into one durability scenario

Combines TestSSHProbe, TestENIHotplug, TestENIHotplugReconcile,
TestVolumeDurability, TestModifyInstanceAttribute, and TestRebootInstance
into TestGuestChurnDurability, a single shared-guest scenario that
re-verifies a data-integrity sentinel sha256 after every perturbation
stage (ENI hotplug, daemon restart, ENI detach, instance-type resize,
stop/start, reboot). This proves the sentinel survives the full churn
sequence rather than just one isolated stop/start.

* fix(vpc): clear subnet drop gate when installing egress reroute

A subnet with an attached IGW but no 0.0.0.0/0 route carries a
priority-1100 drop gate on the VPC router. When a route later lands
(NATGW reroute at 900, IGW reroute at 1000) the reroute is installed but
the drop gate was never removed, so the higher-priority gate wins and
black-holes the subnet's egress in lr_in_policy before it reaches routing
or SNAT. This left NAT-gateway private-subnet egress with 100% packet
loss: the SNAT stage saw zero packets and no conntrack was committed.

Remove the subnet's drop gate for the same prefix once a reroute is
installed. Idempotent and prefix-scoped, so a specific-prefix reroute is
a no-op and leaves the default gate intact.

* test(e2e): merge VPC subnet, NAT gateway, and EIP single-node tests

Merges the former TestVPCSubnetE2E, TestNewVPCEgressBaseline,
TestNATGateway, and TestInstanceEIP into one staged scenario,
TestVPCEgressPaths, around one scenario-owned VPC and its two guests,
cutting five guest boots to three.

The public guest serves PublicSubnetEgress, then the NAT Gateway
bastion hop, then (last, since association rewrites its public IP)
the EIP flip. The private guest serves the NAT Gateway path, launched
directly into the same VPC's already-existing private subnet instead
of a dedicated one. RouteBeforeSubnet keeps its own second VPC and
instance since it exercises the implicit main-route-table code path,
a different one than the explicit route table this scenario's own VPC
uses for its public subnet — collapsing the two would drop coverage of
whichever path got merged away.

The NAT Gateway up/down flip now repeats for an env-tunable round
count (SPINIFEX_VPCEGRESS_NAT_ROUNDS, default 1), matching every other
merged single-node scenario.

* test: TEMPORARY mutation-check — revert a795c2b2 drop-gate clear

Reverts the RemoveSubnetEgressDrop call in ensureSubnetEgressAtPriority
to confirm TestVPCEgressPaths/Round1/NATGatewayUp actually detects the
regression it guards against. This commit will be reverted immediately
after the live run confirms a failure.

* test: TEMPORARY mutation-check v2 — neutralize RemoveSubnetEgressDrop

Restores the real a795c2b2 fix in ensureSubnetEgressAtPriority (the
first mutation attempt only reverted this call site and was masked by
the independent gate-recompute path in routetable service_impl.go's
CreateRoute, which also clears the drop gate on every 0.0.0.0/0 route
add and predates a795c2b2). Neutralizing RemoveSubnetEgressDrop itself
disables gate-clearing regardless of caller, reproducing the literal
regression. Will be reverted immediately after live verification.

* Revert "test: TEMPORARY mutation-check v2 — neutralize RemoveSubnetEgressDrop"

Mutation-check confirmed: neutralizing RemoveSubnetEgressDrop reproduced
a795c2b2's regression exactly (stale priority-1100 drop gate outranking
the priority-1000 IGW reroute, confirmed via OVN flow dump; PublicSubnetEgress
failed with an SSH handshake timeout to the public instance). Restoring
the real fix; igw.go is now byte-identical to a795c2b2.

* fix(e2e): stop pruning shared multinode SSH key pem mid-run

The multinode package fixture cached Fixture.Artifacts once, computed
from harness.ArtifactDir(t, env) against whichever top-level Test*
happened to win the pkgFixOnce race. That helper both names the
directory after that one test and registers a t.Cleanup that removes
it once that test passes. needKeyPair wrote the shared EC2 key pair's
pem into that same directory, so as soon as the winning test finished,
its own artifact-dir cleanup deleted the pem every later test in the
package still needed to SSH into fresh guests, even though the
underlying EC2 key pair itself was untouched (its DeleteKeyPair
cleanup already correctly drains at process Close() in TestMain).

Fix: give Fixture an ArtifactDir(t) method — the same per-call pattern
already used by the gpu/single/storagegrowth/iam fixtures — so each
diagnostic dump site recomputes its own dir against the CURRENT test.
The shared key pair pem now lives under Fixture.TmpDir, which is
genuinely package-scoped and only removed once in TestMain after
m.Run() completes.

* refactor(e2e): parallelize LB e2e scenarios on multinode clusters

Each of the 8 TestLoadBalancer scenarios already stands up its own
dedicated LB + target group (ModifyListener/ListenerRules mutate their
LB's listener in place, so it can never be shared). The bottleneck was
running them serially: each teardown made createActiveLB back off
waiting for the previous LB's sys.micro slot to be reclaimed before the
next one could stand up.

On multinode clusters (peer != "", i.e. the 3-node cluster this suite
targets) there's spare capacity to stand up all 8 dedicated LBs at once,
so scenarios now run as t.Parallel() subtests instead of serial
create/teardown/backoff. Since each scenario owns an independent LB,
one never reaching active only fails that scenario — it no longer
cascades into five sequential 5-minute timeouts, so the serial fail-fast
gate is skipped in this mode; concurrency itself bounds the worst case
to a single timeout window.

Single-node dev boxes (no peer) keep the original serial path,
including the fail-fast gate, since they lack the spare capacity for
concurrent LB standup. No subtest body, assertion, or call signature
changed — only the dispatch/gating logic in TestLoadBalancer.

* fix(ci): gate e2e jobs on the suites they actually run

* fix(e2e): serialize internet-facing LB subtests among themselves

Live multinode verification showed InternetFacing_ALB and
InternetFacing_NLB running concurrently each clobber the other's
public-LB DNS record mid-registration, so neither ever resolves within
the 90s wait. The old serial suite never had two internet-facing LBs
alive at once, so this never surfaced.

Drop t.Parallel() from the three internet-facing subtests so their
register+resolve windows never overlap each other, while leaving the
internal subtests parallel as before. They may still run alongside the
internal group, which resolves internal (not public) DNS and isn't
affected.

* fix(e2e): give each ALB LB scenario its own security group

Concurrent internal subtests all created ALBs with no explicit
SecurityGroups, so each ALB's ENI fell back to the one shared VPC
default SG. One scenario authorizing/reconfiguring its own listener
racing another mutating the same SG made Internal_ALB_ModifyListener
intermittently fail to serve on the modified port under parallel load.

Each ALB scenario now creates a dedicated SG (createScenarioSG),
authorized only for the ports that scenario's listener(s) use, and
passes it to CreateLoadBalancer. The shared app-instance/probe-client
SG is untouched, since SG ingress is enforced at the destination ENI
regardless of the source ENI's SG. NLBs are unaffected: they already
get an auto-managed per-LB SG when none is supplied.

* test(e2e): annotate intentional create-path calls for manifest-lint

The vpcegress and per-scenario LB security-group tests create raw AWS
resources on purpose — the egress datapath, the route-before-subnet
ordering, and per-scenario SG isolation are the subjects under test, so
they cannot route through a shared Ensure* fixture. Mark each with
// e2e:allow-create and slim the baseline of entries for the removed
single-node network tests.

* test(e2e): restore live spot terminate-close and cancel-running coverage

The integration-tier spot test calls CloseForInstance directly and infers
cancel-keeps-running from the SIR's InstanceId, because DaemonLite has no
vm.Manager to drive the real TerminateInstances -> daemon teardown cleaner
-> RemoveFromSpotRequest -> CloseForInstance chain or to observe a real
VM's running state. Add a thin live e2e test that drives both terminal
transitions through a real backing VM: cancel one spot-backed instance and
observe it stays running, terminate the other and observe its SIR reach
closed through the genuine async delegation.

* fix(network): refresh orphan-EIP prune liveness to spare mid-pass launches

pruneOrphanEIPs listed OVN NAT rows live but matched them against the intent
snapshot captured at the start of the reconcile pass. Because the apply phase
can block for tens of seconds on guest-port datapath waits, a guest launched
during the pass had a live dnat_and_snat row absent from the stale snapshot, so
the prune swept it and blackholed the guest's auto-assigned public IP until the
next pass re-added it — an intermittent multinode SSH-dark flake.

Add an optional FreshIntent re-read callback (wired in vpcd to LoadIntentFromKV)
and union its ports into the live set before pruning, so a mid-pass launch
counts as live. Skip the prune entirely when the re-read fails rather than risk
a false sweep against a snapshot known to be stale. Self-healing and idempotent:
a genuine orphan absent from both snapshot and fresh read is still pruned next
drift. Single-node behaviour is unchanged (callback nil in tests).
2026-07-21 16:46:18 +10:00
Ben Duncan 28a876d17d feat(dns): resolvable ALB/NLB + EKS DNS, forwarder hardening, cross-tenant reconcile (#532) 2026-07-17 12:02:59 +10:00
Julian Sommer 8a94886b13 feat: cloud-init EC2 datasource (#411) 2026-06-25 13:48:08 +10:00
Julian Sommer 9288ecc7dc chore: delete no op tests + speedup e2e 2026-06-17 12:19:13 +10:00
Josh Siviour 9a474220ce fix: preserve terminated-instance describe-visibility window in GC reaper (#363)
* fix: preserve terminated-instance describe-visibility window in GC reaper

The TerminatedTeardownReaper purged a terminated record the moment it drove
the instance's pending NAT/OVN teardown to done. Normal terminations always
arrive NAT/OVN-pending, so the first 2m GC sweep completed and purged them
immediately, removing the instance from DescribeInstances before clients could
observe state=terminated — an AWS-compat divergence that flaked e2e-single
TestRunInstancesMultiCount.

Stamp TerminatedAt on transition and purge a completed record only once it is
older than a 15m visibility window; fresher records are left to the terminated
bucket's 1h TTL, keeping the instance describable as terminated. The ADR-0003
§3 purge-on-completion invariants still hold (their seeded records predate the
window). Closes mulga-siv-328.

* test(e2e): poll intra-SG east-west ping until L2 converges

TestSameSGComms fired a single un-retried 'ping -c 3 -W 2' immediately after
the source instance's SSH became reachable, but the ICMP target is the
destination's east-west data plane. Two instances boot in parallel and the
destination guest NIC / OVN port flows come up several seconds after the EC2
running transition the launch waits on. When the probe wins that race the
source kernel reports 'Destination Host Unreachable' (ARP unresolved), not an
ACL drop, and the test flaked.

Replace the one-shot ping with pingConverged, a bounded poll that retries
until 0% packet loss or 45s. A genuine self-ingress/datapath break still
stays at 100% loss for the full window and fails, so coverage is preserved.
2026-06-16 11:38:05 +10:00
Josh Siviour 1873f45d26 Resilient resource lifecycle (ADR-0001..0006): EKS multi-node teardown, idempotent deletes, GC backstops (#357)
* fix: idempotent Delete* across VPC family + volume (RLC1)

Delete handlers now return empty success when the resource is already
absent (nats.ErrKeyNotFound), instead of *NotFound. Transient read
errors still map to ServerInternal. Covers DeleteVpc, DeleteSubnet,
DeleteSecurityGroup, DeleteNetworkInterface, DeleteInternetGateway,
DeleteNatGateway, DeleteRouteTable and DeleteVolume.

Makes destroy retries converge instead of failing mid-graph, removing a
source of orphaned/zombie resources between deploys. Adds a
TestRLC1_*DeleteIdempotentOnAbsent invariant per package and updates the
daemon delegation table; supersedes the old absent->NotFound tests.

* feat: prune orphan ENI LSPs in reconcile applyPorts (ADR-0003 §4)

applyPorts was create-or-update only, so a guest LSP whose
spinifex:eni_id no longer maps to an intent ENI survived instance
terminate and VM-host reinstall — the orphan-LSP capacity-drift root
cause. It now takes pruneOrphans (mirroring applySGs): on a full
reconcile it lists LSPs and tears down each managed ENI port absent from
intent via the composed topology.DeletePort cascade (clears port-group
memberships, then deletes the LSP). The apply-only startup path does not
prune, preserving in-flight ports until subscribers converge.

Adds ListLogicalSwitchPorts to the OVN client (live + mock). Invariant
TestRLC5_OrphanLSPPrunedAfterReconcile guards ADR-0003 §4; a startup-race
test guards the apply-only path.

* feat: idempotent + tracked instance terminate (ADR-0003 §1/§2)

Make terminate idempotent across all three layers and break the
un-terminable-ENI deadlock, and record per-dependency teardown so the
GC backstop can later tell a fully-reaped instance from a dangling one.

- vm.Manager.Terminate: absent / already-terminated / shutting-down now
  return nil instead of NotFound / invalid-transition (ADR-0003 §2).
- VM.Teardown map + teardown.go marks: sync steps stamped Done/Failed via
  cleaner error returns; fire-and-forget OVN LSP and NAT rule stamped
  Pending for the reconciler / GC reaper (ADR-0003 §1).
- InstanceCleaner: DeleteVolumes / ReleasePublicIP / DetachAndDeleteENI /
  RemoveFromPlacementGroup / ReleaseGPU now return error.
- vpc ForceDeleteInstanceENI bypasses the in-use guard for the owning
  instance, breaking the failed-detach deadlock; plain delete still
  rejects an in-use ENI held by another instance.
- gateway TerminateInstances: KV-health-gated idempotent absence (a failed
  terminated-bucket query does not fabricate success, ADR-0003 §3).
- Invariants: TestRLC1_TerminateIdempotentOnAbsent, TestRLC4 teardown-map
  stamping + failed-dependency, TestRLC_ENINonDeadlock.

* feat: reconciler GC backstop framework + terminated-teardown reaper (ADR-0003 §3)

Add the shared reality->desired garbage-collection framework (inverse of
Restore) and its first reaper, closing the gap 295.3 deferred: nothing
retried pending/failed teardown or purged the terminated record when its
dependents reached done.

- vm/gc.go: GarbageCollector + Reaper interface (Class/Scope/Sweep).
  KV-health gated — holds and alarms when the desired-state cannot be
  trusted, never reaps against it. ClusterWide reapers run only on the
  elected leader (optional elector); NodeLocal run on every node. Start
  sweeps immediately then every GCInterval.
- vm/teardown_reaper.go: TerminatedTeardownReaper (node-local). Scans this
  node's terminated records, re-drives each not-done dependent through the
  idempotent cleaner, and purges the record once all reach done. Records
  already complete on arrival are left to the bucket's 1h TTL.
- StateStore gains DeleteTerminatedInstance (JetStream impl already existed).
- daemon: wires the GC after the pending watchdog, gated on a cheap
  JetStream AccountInfo health probe.
- Cluster OVN-LSP arm already lands via the reconciler drift prune (295.2).
- Invariants: TestRLC5_GCRetriesPendingTeardownToDoneThenPurges,
  TestRLC5_GCNeverPurgesIncompleteRecord, TestRLC5_GCHoldsWhenKVDegraded,
  TestRLC5_GCSkipsOtherNodesRecords.

* feat: VPC-family dependency guards (ADR-0004 rule #3)

DeleteSubnet blocks while a live ENI attachment (a resident instance)
remains; available/orphan ENIs do not pin it. DeleteNetworkInterface
guards on the structured attachment (eniIsLiveAttachment), not a bare
in-use string. DeleteNatGateway blocks while a live route table forwards
to it and disassociates its EIP keeping the allocation (AWS parity);
CreateNatGateway now marks the EIP associated so the disassociate is
real and a second NAT GW cannot reuse the allocation.

Binding invariants: TestRLC3 dependency-guard completeness across the
subnet/ENI/NAT-gateway handlers.

* feat: EBS volume data-safety GC override (ADR-0005)

The shared GC backstop reaps actual-desired for every other class; for
volumes that default is forbidden because they carry customer data. Add
VolumeLeakReaper (node-local, rides the 295.5 GC): it marks a volume left
attached to a definitively-gone instance as orphaned (a non-destructive
tag) and alarms, but NEVER issues a delete. The daemon feeds it only this
node's terminated instances whose volumes-teardown failed, so the shared
predastore scan can never false-mark another node's live-instance volume.

DeleteVolume idempotency + the detach/snapshot guards + the
DeleteOnTermination teardown retry already landed (295.1/295.3/295.5).

Binding invariants: TestRLC5 (GC marks+alarms, never deletes data),
TestRLC3 (detach-before-delete).

* test(elbv2): lock ADR-0002 §3 live-only TG in-use guard (mulga-siv-295.4)

* feat(eks): idempotent DeleteCluster on absent + ADR-0006 lifecycle invariants (mulga-siv-295.8)

DeleteCluster returns empty success when the cluster meta is already swept
(Common Resource Lifecycle Contract #1), so tofu destroy retries converge.
Adds TestRLC1 (idempotent delete), TestRLC2 (billable-before-KV-sweep ordering)
and TestRLC3 (NLB target-group no-orphan, riding ADR-0002/172).

* fix(eks): GC reaper terminates orphan control-plane VM after cluster delete (mulga-siv-294)

A normal DeleteCluster can leave a running control-plane VM behind (terminate
completes async; a daemon restart re-launches it from saved running-state) after
the cluster meta is swept — a billable orphan with no owner. Add EKSBillableReaper
on the 0003 GC backstop: a running managed-by=eks CP VM whose cluster meta is
definitively gone is terminated. The CP ENI now carries the customer-account tag
so a system-account VM can be mapped back to its cluster meta; the reaper never
reaps on uncertainty (ENI gone/untagged or meta present).

* feat: reclaim orphan EKS NLB + NAT-GW EIP in billable reaper

The billable GC reaper terminated an orphan control-plane VM but left the
cluster's NAT-gateway EIP and NLB front-end NAT behind when the meta was
gone. After a successful terminate, run the name/tag-driven DeleteClusterNLB
+ DeleteClusterCPVPC teardown (idempotent, meta-independent) so the billable
NAT-GW EIP and NLB NAT are reclaimed too. ADR-0006 §5.

* fix: persist NAT-GW & route-table tags and reorder CP-VPC teardown to reclaim EKS NAT-GW EIP

CreateNatGateway and CreateRouteTable both dropped input.TagSpecifications,
so the tag-driven DeleteClusterCPVPC teardown could not discover the cluster
NAT gateway or its private route table. The explicit DeleteNatGateway +
ReleaseAddress were skipped and the billable NAT-GW EIP leaked under the
system account on every clean DeleteCluster.

Three fixes:
- CreateNatGateway persists ExtractTags(TagSpecifications, natgateway).
- CreateRouteTable persists ExtractTags(TagSpecifications, route-table).
- DeleteClusterCPVPC tears down route tables before the NAT gateway, so the
  rule #3 route-ref guard (DependencyViolation / InvalidAddress.Locked) is
  not tripped and the EIP releases.

Adds tag-persistence regression tests for both create paths and a teardown
ordering invariant (TestRLC5). Validated live: NAT-GW EIP released cleanly,
no DependencyViolation/Locked.

* fix: route EKS control-plane VM terminate cross-node + DELETING teardown backstop

Multi-node EKS cluster delete wedged in DELETING and stranded the billable
NAT-GW EIP. Two root causes, both invisible on a single-node box:

Cross-node terminate was never routed. TerminateSystemInstance was node-local,
so terminating a CP VM owned by another node returned NotFound (treated as
idempotent) and the teardown deleted a still-attached ENI
(InvalidNetworkInterface.InUse). That error short-circuited purgeClusterInfra
before the managed CP-VPC teardown that releases the NAT-GW EIP. Split
TerminateSystemInstance into a local body plus a routing wrapper that issues
system.TerminateInstance.<id> to the owning node. Bind that subscription for
every system-managed VM (elbv2 + eks) via the OnInstanceUp funnel, so CP VMs
placed on the coordinator's own node (and recovered after a daemon restart) are
reachable too, not only remotely-launched ones.

No DELETING backstop. A failed synchronous DeleteCluster left the cluster
DELETING with nothing to re-drive it. Add EKSDeletingReaper (vm.Reaper, class
eks-deleting) that re-runs purgeClusterInfra for clusters wedged past a min-age,
gated by the per-cluster reconciler leader lease. Stamp ClusterMeta.DeletingSince
on the transition into DELETING.

TerminateK3sServerVM additionally waits out any residual ENI-InUse with a bounded
budget as defense-in-depth.

Validated live on env19 3-node: first delete-cluster converges in 29s, both
remote CP VMs terminated cross-node, NAT-GW EIP released, backstop never fires.

* fix(network): gate gateway reconcile on real datapath reachability

Post-reboot the external OVN datapath can stay dead while every
control-plane signal is green: the chassisredirect SB binding is claimed
(up=true), NAT rows are present and the host neigh is primed, yet
ovn-controller leaves stale gateway/localnet flows so EIP north-south and
the VM->gateway heartbeat forward nothing. ensureGatewayClaimed only
nudges recompute when the binding is unclaimed, so a claimed-but-dead
datapath is never detected or repaired.

Add ensureGatewayDatapath: after the SB claim converges, probe the
gateway LRP IP (OVN answers ICMP natively, no guest or security-group
dependency), and on a miss force one ovn-controller recompute and
re-probe until a short deadline. Reuses the existing recompute nudge and
no-ops when no verifier is wired or no gateway IP resolves.

* fix: self-heal external uplink after reboot boot-race

Post-reboot, ovs-vswitchd/ovn-controller order after the passive
network.target rather than network-online.target, so they start
concurrently with systemd-networkd. Under a heavy boot the WAN-glue veth
(veth-wan-ovs) can come up admin-down before networkd brings it up,
leaving br-wan with no carrier and the external datapath dead while every
control-plane signal reconciles green.

Broaden the datapath health-gate remediation from recompute-only to
RepairDatapath: re-assert the veth admin state (covers the admin-down
link, which a flow recompute cannot revive) then recompute (covers a
stale gateway ofport). Idempotent; the veth ops are skipped in
physical-uplink mode where the device is absent.

Also capture ip -d link (veth admin/carrier) and ovs-ofctl show br-ext
(ofport) in the reboot diag bundle to disambiguate the two failure shapes
from CI artifacts.

* fix: restore AWS-faithful Delete* NotFound; move idempotency to teardown callers (mulga-siv-306)

RLC1 (f9218982) made EC2/VPC/EBS Delete* handlers return success on an absent
resource, breaking AWS compatibility and the cross-account isolation signal (a
cross-account delete reads as absent -> success instead of *.NotFound).

Restore the AWS contract at the API while keeping lifecycle convergence:
- Handlers return canonical *.NotFound on absent: DeleteVpc, DeleteSubnet,
  DeleteSecurityGroup, DeleteInternetGateway, DeleteNatGateway, DeleteRouteTable,
  DeleteVolume, and the public DeleteNetworkInterface (ForceDeleteInstanceENI
  keeps its idempotent force path, ADR-0003 section 2).
- Add awserrors.IsNotFound; destroy orchestration (instance terminate, EKS
  CP-VPC teardown, EKS IGW/SG cleanup, k3s rollback, ELBv2 ENI/SG teardown)
  tolerates NotFound so re-issued/double-targeted deletes converge.
- Flip the RLC1 unit invariants to assert *.NotFound on absent; revert the
  daemon round-trip cases; add IsNotFound + CP-VPC convergence tests.

ELBv2 deletes and TerminateInstances stay idempotent (AWS itself is).

* fix(network): gate ingress EIP datapath on guest SB Port_Binding convergence

TestMultinodeGuestSSH intermittently times out (Connection timed out, not
#355's reset-by-peer) connecting to a fresh trio instance's public IP after
the suite churns instances across all three chassis. The instance is running
and AddEIP has installed the DNAT row, flushed/primed the host neigh, and
barriered the gateway-chassis flow — but none of that proves the
gatewayLRP->guest geneve hop: until the guest ENI's southbound Port_Binding is
up on its hosting chassis the cross-node flow is missing and the DNAT-translated
packet blackholes.

Add ensureGuestPortDatapath, the guest-side analog of ensureGatewayDatapath:
after AddEIP, probe the guest LSP's SB Port_Binding (ovn-sbctl up column); on a
miss force one ovn-controller recompute (binds the port / installs the remote
flow) and re-probe until a short deadline. Recompute, not RepairDatapath: this
is flow/binding convergence, not a WAN-uplink fault. No-op when no verifier is
wired or the EIP carries no guest port. spec.PortName is populated for every
associated EIP regardless of NAT mode.

Extends GatewayClaimVerifier with GuestPortUp and wires the gate into
applyEIPs so it runs in the continuous reconcile loop on every node.

* Revert "fix(network): gate ingress EIP datapath on guest SB Port_Binding convergence"

This reverts commit 728b1a9cec6eaf5c7ef5e9eda4469f239b4d8fc0.

* fix(network): key EIP DNAT delete on external IP, not logical IP

A dnat_and_snat row's identity on the VPC gateway router is its external
IP. The logical (private) IP is not a stable key: the EIP pool round-robins
and instance private IPs are reused as instances recycle, so the same
logical IP is held by different EIPs over time.

DeleteEIP deleted the row by logical IP, so a stale or retried delete for a
freed EIP clobbered whichever live EIP now held that recycled private IP --
the next owner's row vanished with no re-add and its public IP went dark
(SSH SYN never left br-wan: Connection timed out). Lifecycle-resilience
teardown/GC retries amplified this by firing vpc.delete-nat repeatedly.

Key the delete on the external IP via DeleteNATByExternalIP and skip when
no external IP is supplied (no EIP means no dnat_and_snat row). A stale
delete now targets the freed EIP's own external IP (ErrNATNotFound no-op)
and can no longer touch the live row.

* refactor: relax DeleteNatGateway to AWS-faithful

Remove the route-reference dependency guard (checkNatGatewayRouteRefs) so a
NAT gateway deletes even while route tables still forward to it, matching AWS
(the route blackholes). The reconciler's loadNATGWs drops the SNAT once the
record leaves the active bucket, so a forwarding route is not a delete-blocking
dependent. EIP is still disassociated on delete (no leak).

* test: invert NAT-GW route-ref invariant to AWS-faithful

TestRLC3_NatGatewayBlocksWhileRouted asserted DependencyViolation while a
route forwarded to the NAT gateway, which is AWS-infaithful. Replace with
TestRLC3_NatGatewayDeletesWhileRouted: delete must succeed whether or not a
live route still targets it (the route blackholes; the reconciler drops the
SNAT). Per ADR-0004 §2.

* fix: tear down NAT-GW SNAT on delete (restore delete-time fan-out)

The guard commit (53ed55a9) dropped publishDeleteEventsForNatGateway on the
assumption a routed NAT GW could never be deleted. With the route-ref guard
removed, deleting a NAT GW while routes still target it left the SNAT in
place (applyNATGWs is create-only, so the reconciler never prunes it) and
egress kept working — TestNATGateway's post-teardown 'lost internet' check
failed. Restore the fan-out: on delete, scan route tables and publish
vpc.delete-nat-gateway per associated subnet so egress stops, while the
route entry survives as a blackhole (AWS-faithful).

* fix: probe EIP datapath in reboot self-heal, not the gateway LRP IP

The post-reboot gateway datapath self-heal probed the gateway LRP IP for
liveness, which OVN answers natively at the router — so it stayed green even
when the EIP NAT pipeline was stranded (ofproto/trace dropped EIP traffic at
table 0). RepairDatapath never fired and TestRebootResilience timed out, with
the drift loop re-probing the same false-green every cycle.

Prefer probing an associated EIP: force a fresh ARP of the dnat_and_snat
external IP (flush neigh, ping to trigger, read the resolved MAC). OVN answers
ARP for the external IP from the gateway chassis independent of the guest, so a
resolved MAC proves the WAN uplink forwards and the NAT flows are installed —
the signal the LRP IP cannot give. Fall back to the LRP IP for VPCs with no
EIP. The existing drift-loop cadence now re-heals a later flow strand.

* fix: lb-agent heartbeats over mgmt port, not the WAN/EIP datapath

The lb-agent heartbeat to awsgw is control-plane and must survive a host
reboot that strands the OVN/EIP north-south data plane. Customer
(internet-facing) lb-agents heartbeated over the WAN GatewayURL, riding the
EIP datapath, so after a reboot the ALB never reported healthy until the
datapath self-healed. System LBs already heartbeated over the on-link
br-mgmt NIC; this extends that path to every lb-agent.

buildLBAgentEnv now always uses mgmtGatewayURL (on-link MgmtBridgeIP, the
mgmt NIC the lb-agent VM already carries), falling back to the WAN URL only
when no mgmt bridge exists. Drops the account-id branch.

* fix: re-heal guest ENI SB Port_Binding post-reboot so EIP ingress converges

Post-reboot every EIP in a VPC goes dark north-south: the DNAT row, host
neigh and gateway-chassis flow are all in place (ARP to the EIP resolves)
but the gatewayLRP->guest flow is missing until ovn-controller binds the
guest ENI's SB Port_Binding, so the DNAT-translated packet blackholes and
the public IP is unreachable on an otherwise-running instance.

Restore the guest-port convergence gate in applyEIPs: probe the guest LSP's
SB Port_Binding up column; on a miss force an ovn-controller recompute and
re-probe until a deadline. Unlike the earlier reverted form, recompute on
every miss, not once: after a host reboot the guest tap is replumbed several
seconds after the reconcile runs, so a single early nudge fires before the
port exists and never binds it. The window is widened to span guest boot.

This is the southbound analog of the gateway datapath self-heal; the EIP
ARP probe cannot detect it because the gateway chassis answers ARP for the
external IP even while the guest delivery flow is absent.

* fix(network): force post-reboot EIP recompute on guest-port bind, startup-only

The reboot suite passed only by accident: the pre-#351 gateway-claim verifier
polled the always-chassis-less gateway LRP, so it fired an ovn-controller
inc-engine/recompute on every reconcile. That spurious recompute was load-bearing
- it reinstalled the centralised gateway DNAT flows that ovn-controller's
incremental engine misses on a cold (post-reboot) start. #351 correctly switched
the check to the chassisredirect port, eliminating the every-cycle recompute, and
the EIP datapath went dark post-reboot with every control-plane signal green.

Restore the kick, scoped to the post-reboot startup path: applyEIPs now gates a
single recompute on the guest ENI's SB Port_Binding chassis claim - the reliable
signal the tap is back, unlike the up column which stays stale-true across a
reboot. Drift never recomputes, preserving the #351 fix for freshly attached
EIPs. Probe renamed GuestPortUp -> GuestPortBound (chassis, not up).

* Revert "fix(network): force post-reboot EIP recompute on guest-port bind, startup-only"

This reverts commit 792e318211ef03efbe24febeb470749d88c0b03c.

* test(e2e/reboot): capture dataplane diag on ALB serve failure

The post-reboot ALB-serve assertion (8.6) failed with no flow/ARP evidence:
the OVN/OVS dataplane dumps only ran on the 8.5 targets-unhealthy path, but
8.5 passes on the daemon's own health view while the north-south EIP datapath
is dark, so the serve failure (8.6) left nothing to localise the drop.

On a serve failure, capture dumpALBProbe/dumpOVNDataplane/dumpOVNClaimState/
dumpHeartbeatDiagnostics/dumpAppDiagnostics before failing. Add to the OVN
dataplane dump: dump-flows br-ext and fdb/show br-ext (north-south bridge,
previously only br-int), and a real ARP probe that flushes the neigh entry
first so primeReachability's pre-seeded reachable entry can no longer mask an
unanswered ARP. Pure diagnostics; no production change.

* test(e2e/reboot): decisive datapath diag — untruncate br-int, real-ingress ofproto/trace, conntrack + tap capture

* test(e2e/reboot): add south->north return-path ofproto/trace to localize egress drop

* test(e2e/reboot): derive LRP MAC from realized flow + remediation experiment (recompute vs ovn-controller restart)

* test(e2e/reboot): dump persisted SB MAC_Binding + external MACs; flush experiments (conntrack vs MAC_Binding) to isolate recompute-resistant return-path drop

* test(e2e/reboot): untruncate Port_Binding + enumerate DGP/chassisredirect claim state (does cr-gw row exist + resident chassis)

* test(e2e/reboot): dump NB source of return-path drop (lflow stage, NAT external_mac/options, LR policy, LSP port_security)

* fix: exempt public-IP instances from subnet egress drop gate (mulga-siv-311)

Post-reboot reconcile installs the priority-1100 subnet egress drop gate for an
IGW-attached subnet that has no 0.0.0.0/0 route, but nothing punched the subnet's
public-IP instances through it. lr_in_policy runs before lr_out un-DNAT/SNAT, so an
inbound connection's reply still carries its private source when it hits the gate and
is dropped. The ALB/EIP datapath goes dark south->north post-reboot while NAT, ARP,
chassis and guest-port binding all read green; the pre-reboot path survives only
because the event-driven gate never evaluates a subnet created after IGW attach.

Install the existing priority-1200 /32 reroute (above the gate) for every public-IP
instance during reconcile. Reroute only: the instance's dnat_and_snat already supplies
SNAT, unlike EnsureSystemInstanceEgress which also adds a plain snat. Public IPs come
from two disjoint sources -- auto-assigned/ELB addresses on the ENI record and user
EIPs in the EIP bucket -- so drive the exemption from both intent.Ports (new
PortSpec.PublicIP) and intent.EIPs.

* refactor: scope public-IP drop-gate exemption to gated subnets

Only install the priority-1200 reroute when the instance's subnet actually carries
a drop gate. Routed subnets egress via their priority-1000 reroute and need no
exemption, so bounding on gate presence keeps the change inert for IGW-routed and
NATGW-routed subnets (no redundant or overriding policy). Adds a negative test.

* refactor: drop unused RemoveEIPInstanceEgress

No production caller; the exemption is install-only in reconcile. Removed the
interface method and impl rather than leave dead API surface.

* test: dump guest console + OVN/datapath diag on SG-to-SG client SSH timeout

TestSGToSGDatapath waited for client-vm SSH via EventuallyErr and reported
only 'exit status 255' on timeout — no guest-side or datapath state. When the
fresh public-IP VM is unreachable for the full window the failure was
undiagnosable from CI artifacts.

Swap the wait to the non-fatal trySSHReady probe and, on timeout, call
DumpVPCFlowDiagnostics (guest console tail, ovn-nbctl/sbctl show, NAT rows,
br-int flows / conntrack / host ARP keyed on the public + private IP) before
Fatal, mirroring vpc_test/baseline_test. Captures persist to the artifact dir
for the Stage 2 analyzer bundle.

* fix: ownership-scope public-IP teardown to survive IP recycling

A live instance's dnat_and_snat rule, host ARP, and IPAM lease were torn down
by the delayed garbage-collection teardown of a different, long-dead instance
that previously held the same recycled public IP. The 2-min vm/gc
instance-teardown reaper re-runs ReleasePublicIP on a stale terminated record;
because the external IPAM round-robins a small pool, the IP had already been
reassigned to a live instance, and both teardown primitives acted on the IP by
value with no ownership check:

- policy.DeleteEIP deleted the dnat_and_snat row by external IP alone,
  discarding the logical IP it receives.
- StaticPoolAllocator.Release freed the pool entry by IP value.

Scope both to the current owner so a stale or duplicated teardown for a
recycled IP is a no-op:

- DeleteEIP looks up the row by external IP and skips the delete (and the ARP
  flush) when its logical IP no longer matches, mirroring AddEIP's idempotency
  lookup. Defeats both external- and logical-IP reuse races.
- Allocator.Release / ExternalIPAM.ReleaseIP take an ownerENIID; the static
  allocator no-ops a release whose ENI differs from the live allocation, and
  treats an already-freed owner-scoped release as idempotent. Teardown and
  rollback callers pass their ENI; user-driven EIP release passes none.

Proven via E2E single TestSGToSGDatapath (run 27515293563): client-vm SSH
black-holed after its NAT was deleted by the dead instance's GC sweep.

* fix(eks): single-flight DeleteCluster teardown per cluster

SDK retries of one DeleteCluster get fanned across nodes by the worker
queue group, so purgeClusterInfra raced the same cluster on multiple
nodes: duplicate ENI/NLB teardown, duplicate TargetGroupNotFound
deregisters, and a real double-release risk on the billable NAT-GW EIP.
Idempotency kept it correct but noisy.

Add a dedicated per-cluster teardown lease (teardownLeaderKey =
reconcilerLeaderKey + "/teardown"), distinct from the reconciler lease
so a delete never contends with the still-live reconciler that holds the
reconciler lease until it observes DELETING and exits. DeleteCluster
acquires it after the NotFound-idempotency check: the loser returns the
cluster as DELETING (AWS-async semantics) without running the teardown;
the winner drives purgeClusterInfra and releases. The DELETING backstop
reaper shares the same lease, so at most one purgeClusterInfra runs per
cluster cluster-wide.

A nil leaderKV (single-node) skips gating, so local behavior is
unchanged.

* fix: env-driven SSH-ready budget for slow baremetal guests

Add SPINIFEX_SSH_READY_TIMEOUT override for the single-node SSH-handshake
probes (default unchanged at 3m). Baremetal boots q35 guests slower (OVMF +
NBD-backed disks) than CI loop devices and intermittently misses the 3m
window; the harness can now widen it to 5m without affecting shared-runner
e2e. Applied at all single-node probe sites; failure messages now report the
actual budget.

* fix: shared external switch to stop per-VPC localnet ARP collision

Per-VPC external switches each attached an untagged localnet port to the same
physical network (br-ext). OVN cannot keep multiple untagged localnets on one
physical network L2-separate, so with two or more concurrent public-IP VPCs ARP
for a public IP landed on the wrong VPC's switch and the owning gateway router's
ARP responder never fired, leaving the public IP unreachable.

Move to a single shared external switch (provider-network pattern): one switch
with one localnet on network_name=external. Each VPC's gateway LRP attaches via
its own router-type switch port; per-VPC NAT isolation is unchanged. AttachIGW
ensures the shared switch idempotently and is migration-safe; DetachIGW removes
only the per-VPC port + LRP and preserves the shared switch. DeleteVPC removes
the per-VPC gateway switch port from the shared switch so it does not dangle.
Reconcile detects attachment via the gateway LRP since the shared switch carries
no vpc_id.

* fix: owner-scope DeleteEIP by ENI port to survive identical pair recycling

A stale or GC-re-emitted vpc.delete-nat for a terminated instance tore down a
live instance's dnat_and_snat rule (and flushed the host ARP) when the public
IP and private IP both recycled, together, to that live instance in the same
VPC. The (external_ip, logical_ip) pair-key matches under identical recycling,
so the existing logical-IP guard fell through.

Stamp the owning ENI port (spinifex:logical_port) on the dnat_and_snat row at
AddEIP, thread the port through handleDeleteNAT -> DetachEIP -> DeleteEIP, and
skip the delete when the row's stamped port differs from the incoming one. The
IPAM release was already owner-scoped; this mirrors that guard at the NAT layer
so any stale delete for a recycled pair is a no-op. Empty port preserves the
prior pair-key behaviour.
2026-06-15 23:27:39 +10:00
Julian Sommer 50b5495d26 chore: more comment cleanup 2026-06-12 12:38:31 +10:00
joshsiv-mulga eef337fb80 test(e2e): make egress baseline reproduce the real IGW gap (fresh VPC)
The previous new-subnet egress baseline used the default VPC, whose main
route table is prebaked with 0.0.0.0/0 -> IGW at bootstrap and reconciled by
the vpcd drift loop, so a subnet created in it is reachable regardless of the
create-time gap — the test passed and never flagged the bug.

Replace it with runNewVPCEgressBaseline: a brand-new VPC where the IGW route
is added to the MAIN route table BEFORE the public subnet is created. The
subnet then implicitly joins a main RT that already carries the route, but
CreateSubnet does not recompute per-subnet egress, so the subnet's OVN egress
LRP is never installed and the instance has no datapath to the IGW. With an
open SG, routing is the only barrier, so the instance is unreachable — red
until CreateSubnet triggers a per-subnet egress recompute.

PoolMode-gated like runVPCSubnetE2E (fresh VPC needs OVN IPAM for a public
IP). runVPCSubnetE2E doesn't catch this: it associates a custom RT then adds
the route, so the route mutation enumerates the subnet and installs the LRP.
2026-06-04 20:14:32 +10:00
joshsiv-mulga c9a4e904a8 test(e2e): fresh-install reachability baselines + drop qemu hostfwd fallback
Add baseline tests that confirm two fresh-install regressions the existing
suite masks (it authorizes tcp/22 on the default SG before every SSH probe):

  - default SG default-deny gates external reach of instances in the
    default subnet (SG, not routing)
  - a newly-created public subnet never gets its OVN IGW egress LRP, so it
    has no route to the VPC IGW despite MapPublicIpOnLaunch

Plus a positive test: instances sharing the default SG can communicate via
ICMP (same-host single-node, cross-host multinode).

Single-node baselines run after TestClusterStatsCLI (0-VM gate); multinode
after TestMultinodePreflight (fixture init). Instances are self-cleaning so
they don't perturb the singleton-VM ordering.

Remove the qemu hostfwd SSH fallback from the harness (InstancePublicSSHHost,
GuestSSHEndpoint) - it bypasses the OVN datapath and masks these regressions.
Endpoints now t.Fatal when no public IP is assigned.