Files
sencho/docs/features
Anso cc78873e65 feat(scheduler): group schedule action picker by operator intent (#1446)
* feat(scheduler): group schedule action picker by operator intent

Reorganize the New Schedule action picker from a flat dropdown to a
category-grouped list (Lifecycle, Updates, Security, Maintenance, Backups).

- Extend Combobox component with optional group field on ComboboxOption,
  rendering grouped sections with non-interactive headers when groups are
  present. Flat rendering is unchanged for all other callers.
- Reorder SCHEDULED_ACTIONS by category group and update seven action
  labels per the operator-intent spec.
- Add DEFAULT_SCHEDULED_ACTION_ID constant so picker order and form
  defaults are independently controllable.
- Wire grouped actionOptions into ScheduledOperationsView.
- Update all label references in docs and tests.
- Add Combobox grouping tests, registry order test, and default-constant
  test.

* fix(scheduler): correct Combobox grouping for interleaved groups, docs labels

- Replace last-group-append with Map-based group partitioning so
  interleaved or mixed-group options land in the correct group.
- Add interleaved-groups test and restore non-interactivity test.
- Update stale "Start Stack" references to "Start / Bring Up Stack"
  in doc action-label contexts.
- Update action-picker alt text to describe the new grouped order.
2026-06-25 01:40:31 -04:00
..