docs(skills): single-commit release flow — preview and final tags share the validated commit Version files are bumped once, directly to the final target version; the -preview.N suffix now exists only in tag names. The binary self-reports build::TAG and build.yml derives artifact naming and prerelease classification from the tag, so the preview tag and the final tag can point at the exact same commit — eliminating the post-validation version-bump commit that previously separated the validated hash from the released tag. rustfs-release-version-bump gains a guard rejecting any -preview. target version.
12 KiB
name, description
| name | description |
|---|---|
| rustfs-release-publish | End-to-end RustFS release pipeline: bump version files on main directly to the final target version, cut a preview tag on that commit, verify the CI build and release artifacts, run the downloaded binary locally and exercise the console, validate the server with the latest rc client, then publish the final tag on the SAME validated commit — never a new bump commit, never latest main. Use whenever the user wants to release/publish a RustFS version (发版/发布). |
RustFS Release Publish (preview-validated pipeline)
This skill orchestrates a full release. It wraps rustfs-release-version-bump (which only edits version files and opens the PR) with a mandatory preview-tag validation loop before the final tag is published.
Core design: version files never carry a -preview.N suffix. The preview suffix exists only in tag names. This works because the binary self-reports the git tag it was built from (build::TAG via shadow_rs, see rustfs/src/config/cli.rs SHORT_VERSION), and build.yml derives artifact names and prerelease classification from the tag name — Cargo.toml's version is only a no-tag fallback. Therefore the preview tag and the final tag can (and MUST) point at the exact same commit: what you validated is byte-for-byte the source that ships.
Pipeline shape:
bump version files to <target> (final version, ONE commit) -> merge
-> tag <preview-tag> at that commit -> CI green
-> verify release artifacts -> run binary locally + console checks
-> validate with latest rc client
-> tag <target> at the SAME commit (zero delta) -> re-verify CI/release
On validation failure: fix lands on main via normal PR (version files are already at <target>, no new bump PR), then tag <preview-tag N+1> at the new main commit and restart from Phase 2.
Required inputs
- Final target version, for example
1.0.0-beta.10. - Preview iteration
N(default: next unused preview tag for that target; check withgit tag -l '<target>-preview.*'— and for stable targetsgit tag -l '<target>-rc.*'— aftergit fetch --tags).
If the target version is missing or ambiguous, stop and ask before doing anything (see the semver gate below).
Semver gate — confirm the target version before touching anything
Versions follow SemVer 2.0.0. Precedence reminder:
1.0.0-alpha < 1.0.0-alpha.1 < 1.0.0-beta.2 < 1.0.0-beta.11 < 1.0.0-rc.1 < 1.0.0 < 1.0.1 < 1.1.0 < 2.0.0
Numeric prerelease identifiers compare numerically (beta.9 < beta.10), not lexically — see semver.org spec item 11. Preview tags are internal validation tags layered on top of the target's prerelease channel — they are never themselves a deliverable version and never appear in version files.
Rules:
- A request like "发个版" / "release the next version" without an exact version string is ALWAYS ambiguous. Derive the current latest tag (
git tag --sort=-v:refname | head), then ask the user to choose via AskUserQuestion with concrete candidates, e.g. from1.0.0-beta.10: next prerelease1.0.0-beta.11, promote to1.0.0-rc.1, promote to stable1.0.0. Never guess between these — they have very different meanings (channel promotion vs. iteration) and different CI classification consequences. - After a stable
X.Y.Zexists, the next version must state which component bumps: patchX.Y.(Z+1)for fixes only, minorX.(Y+1).0for backward-compatible features, major(X+1).0.0for breaking changes. If the user names a bump type but not a number, compute it from the latest stable tag and echo the exact resulting version back for confirmation. - Echo the final confirmed version string verbatim in your first status report; every later phase must use exactly that string. If at any point the user's wording and the confirmed version diverge, stop and re-confirm.
Preview tag naming
- Prerelease target (contains
alpha/beta/rc): preview tag is<target>-preview.N, e.g.1.0.0-beta.10-preview.3. It containsbeta, sobuild.yml's substring-based classification marks it prerelease — safe. - Stable target (e.g.
1.1.0): NEVER tag1.1.0-preview.N—build.ymlmarks a tag prerelease only if its name containsalpha,beta, orrc, so1.1.0-preview.Nwould be treated as a stable release and overwritelatest.jsonas stable. Use1.1.0-rc.Nas the preview tag instead.
Hard rules
- Version files (Cargo.toml, Cargo.lock, README, flake.nix, Chart.yaml, rustfs.spec) are bumped ONCE, directly to
<target>. Never write a-preview.Nsuffix into any version file. Ifrustfs-release-version-bumpis ever asked for a-previewversion, that is a pipeline bug — stop. - Tags have no
vprefix. Always annotated:git tag -a <tag> -m "Release <tag>". - The final tag MUST point at exactly
PREVIEW_HASH— the commit the validated preview tag points at. Never tag currentmainHEAD (commits merged after validation are unvalidated), and never create an extra version-bump commit between preview and final. - Phases run in order; a failure in any phase blocks everything after it. After the fix lands on main, restart from Phase 2 with the next preview iteration against the new
origin/mainhash — do not resume mid-pipeline against a stale hash. - If the release is abandoned after Phase 1 merged, main's version files claim a version that was never tagged. Either revert the bump PR or leave it to be overwritten by the next release — but tell the user explicitly and record the decision.
- User-facing status updates in Chinese; commits, PR titles/bodies, and tag messages in English. No hard-wrapping in commit messages, PR bodies, or documentation prose — one logical line per sentence/paragraph, let soft wrap handle display.
Phase 0 — Preflight
git status --shortclean;git fetch origin main --tags.gh auth statusworks; confirm you can viewgh release list -L 3.- Confirm the exact final target version with the user if not explicit.
Phase 1 — Version bump to the final target (once)
- If main's version files already read
<target>(e.g. this is a restart after a failed preview), verify withrg -n "<target>" Cargo.toml rustfs.spec helm/rustfs/Chart.yamland skip to Phase 2. - Otherwise invoke the
rustfs-release-version-bumpskill with the final<target>(NOT a preview version), full GitHub flow (commit/push/PR). - Get the PR merged into main. Record the resulting main commit:
git fetch origin main
PREVIEW_HASH=$(git rev-parse origin/main) # must contain the bump PR
PREVIEW_HASH is the single source of truth for the rest of the pipeline — report it to the user and reuse it verbatim in Phases 2 and 6. Both the preview tag and the final tag will point at it.
Phase 2 — Publish the preview tag
git tag -a "<preview-tag>" -m "Release <preview-tag>" "$PREVIEW_HASH"
git push origin "<preview-tag>"
Pushing the tag triggers .github/workflows/build.yml ("Build and Release"); docker.yml chains off it via workflow_run.
On a restart (N+1), refresh PREVIEW_HASH=$(git rev-parse origin/main) first — it must contain the fix — and re-report it.
Phase 3 — CI and artifact verification
- Watch the tag build:
gh run list --workflow build.yml --limit 5thengh run watch <run-id>. Every matrix target must succeed (linux x86_64/aarch64 × musl/gnu, macos-aarch64, windows-x86_64) plus the release and latest.json jobs. - Verify the GitHub release:
gh release view "<preview-tag>" --json isPrerelease,assetsisPrereleasemust betrue.- Assets must include all 6 platform zips in both versioned (
rustfs-<platform>-v<tag>.zip) and-latestforms, plusSHA256SUMS,SHA512SUMS,rustfs-<tag>.sbom.cdx.json,rustfs-<tag>.provenance.json.
- Verify the chained Docker run succeeded:
gh run list --workflow docker.yml --limit 3. - Checksum spot-check for the platform you will run locally: download the zip and
SHA256SUMS, verify withshasum -a 256 -c(grep to one line).
Phase 4 — Run the artifact locally, verify the console
Work inside the session scratchpad directory; never leave stray data dirs.
gh release download "<preview-tag>" -p "rustfs-macos-aarch64-v<preview-tag>.zip" -D "$SCRATCH"
cd "$SCRATCH" && unzip -o rustfs-*.zip
./rustfs --version # must report the PREVIEW TAG (build::TAG), not the Cargo.toml version, plus expected short SHA
mkdir -p data
RUSTFS_ACCESS_KEY=rustfsadmin RUSTFS_SECRET_KEY=rustfsadmin ./rustfs ./data
Defaults: S3 endpoint :9000, embedded console :9001.
Checks (all must pass):
./rustfs --versionreports the preview tag name and the short SHA ofPREVIEW_HASH. Reporting<target>without the-preview.Nsuffix means the build did not embed the tag — treat as FAIL and investigate before proceeding.curl -fsS http://localhost:9000/health/readyreturns ready.- Startup log shows the embedded console being served (this was the regression that
fix(release): require embedded console assetsguards). - Open
http://localhost:9001in the browser: login withrustfsadmin/rustfsadmin; dashboard renders without JS console errors; create a bucket, upload a file, download it back (byte-identical), delete the object and bucket. Keep the server running for Phase 5.
Phase 5 — Validate with the latest rc client
rc is the RustFS CLI client from https://github.com/rustfs/cli.
- Ensure the latest release is installed: compare
rc --versionagainstgh api repos/rustfs/cli/releases/latest --jq .tag_name; update viabrew upgrade rustfs/tap/rc(or download the release binary). - Point it at the preview server and run the command matrix, recording PASS/FAIL per command:
rc alias set preview http://localhost:9000 rustfsadmin rustfsadmin
rc ls preview/
rc mb preview/rel-check
rc cp <local-file> preview/rel-check/
rc stat preview/rel-check/<file>
rc cat preview/rel-check/<file> # matches source
rc cp preview/rel-check/<file> ./out && cmp <local-file> ./out
rc cp -r <local-dir>/ preview/rel-check/dir/
rc find preview/rel-check --name "*"
rc share download preview/rel-check/<file> --expire 1h # presigned URL fetchable via curl
rc rm preview/rel-check/<file> && rc rm -r --force preview/rel-check/dir
rc rb preview/rel-check
rc admin user list preview/
rc admin user add preview/ relcheckuser relchecksecret12
rc admin user remove preview/ relcheckuser
rc alias remove preview
- Any FAIL blocks the release. Afterwards stop the server and delete the scratch data directory.
Phase 6 — Publish the final tag on the validated commit
No second version bump, no release branch. The final tag goes on the exact commit the preview validated:
git fetch origin --tags
git rev-parse "<preview-tag>^{commit}" # must equal PREVIEW_HASH — abort if not
git tag -a "<target>" -m "Release <target>" "$PREVIEW_HASH"
git push origin "<target>"
- CI rebuilds from the same source; the only changed input is the tag name, so the binary now self-reports
<target>. - Re-run the Phase 3 verification against the final tag: all matrix jobs green;
gh release view "<target>"shows the full asset set; for a prerelease targetisPrereleaseistrue, for a stable target it must befalseandlatest.jsonmust be updated. - Optionally spot-check
./rustfs --versionfrom a final-tag artifact — it must report<target>.
Output contract
Always report:
- Target version, preview tag(s) used,
PREVIEW_HASH(which both tags point at). - Per-phase result (PASS/FAIL/BLOCKED) with key evidence: CI run URLs, release URLs, console check results, the rc command matrix.
- Any deviation from this pipeline and why the user approved it.