Files
rustfs/.github
hector 589b499e3b ci(ft,heal,chain): FT gate 54, heal budget, and a temporary performance lane disable (#9057)
* ci(ft): update the lane gate to the 54-case manifest with scenario F

auto-testing #118/#119 added FT scenario F and case B5, so the lane now
runs 54 cases over scenarios A,B,C,C2,D,E,F and passes 54/54 — but the
workflow gate still pinned the 44-case A-E manifest and failed the
report step. Align the gate and the contract-test fixture with the
54-case manifest.

* ci(heal): give heal a 90-minute run budget inside a 120-minute job

The heal task was still progressing (scanned 494 -> 571+, failed=0)
when the 45-minute step cap killed it, so the verification steps never
ran and the lane produced invalid evidence (chain 40796474356). The
step budget is now 90 minutes, and the job-level budget rises from 60
to 120 minutes so the enclosing job cannot cancel the raised step
budget. The timeout contract now records heal as the exception to the
shared 60/45 baseline.

* ci(chain): force the performance probe offline while pf-testing is broken

The pf-testing environment is temporarily broken, so every nightly
chain would end red in the performance lane. performance is
required=false in scheduled-validations.json, so forcing the probe's
performance_ready output to offline takes the chain through its
designed skip path: the lane job is skipped, aggregate receives
--allow-skipped performance, and the report records the optional-lane
skip with its reason. Marked TEMPORARY; restore the probe once the
environment is healthy again.

* test(table): drop a stale workflow-comment pin left by #9059

#9059 rewrote the table suite step comments but kept the assertion for
the old '# Red only for harness/environment breakdowns' line, so
test_security_workflow.py fails against current main. The semantics
stay pinned by the continue-on-error and HARNESS_OK assertions.
2026-10-30 14:03:22 +08:00
..
2026-07-20 10:44:06 +08:00