* chore(ecstore): drop the bucket dead_code blanket
The last blanket of the backlog#1823 burn-down, and the largest: 71 items across lifecycle, replication, metadata, quota, object lock and bucket utils. Four are deleted.
Deleted, all trivial:
- check_valid_object_name and check_valid_object_name_prefix, a pair that only calls into each other with no external caller. Worth stating plainly so nobody reads this as a validation gap: object names are validated through check_object_name_for_length_and_slash, which is live; this pair is a second, unwired entry point.
- DEFAULT_HEALTH_CHECK_RELOAD_DURATION, a lone unused constant.
- The LifecycleReplicationConfig alias, which orphaned a re-export in replication/mod.rs that goes with it.
Everything else is kept, in four groups, because the blanket here was hiding structure rather than rot:
Windows platform gating. WINDOWS_RESERVED_NAMES, the two reason constants and object_name_has_windows_incompatible_segment are called from inside the #[cfg(target_os = "windows")] block in check_object_name_for_length_and_slash (utils.rs:228-255), so they only read as dead on non-Windows hosts. As with the Linux gating in the disk root, this cannot be adjudicated locally: cargo check for both x86_64-pc-windows-msvc and x86_64-unknown-linux-gnu fails in the aws-lc-sys build script for want of a cross C toolchain. CI covers both.
Declared boundary surface. The *_boundary.rs and *_bridge.rs files carry the replication split plan's contracts, which scripts/check_architecture_migration_rules.sh pins through the EcstoreReplicationBoundaryImports section of the split-plan doc. Their unused items are declarations, not leftovers.
test-util seams. ConfigWriteLockProbe with install/wait_until_attempted follows the same pattern as the barriers in the services and set_disk roots.
MinIO-parity tier/lifecycle entry points that this port never wired: apply_lifecycle_action, get_transitioned_object_reader, recover_tier_free_versions, delete_object_from_remote_tier, abort_tier_delete_journal_entry and the replication pool's worker-management surface. These are complete, substantial machinery with no caller — the same shape as data_usage's local_snapshot feature. Removing them is a product decision, so they are made explicit here rather than deleted.
Verification, four lanes warning-free: default, --tests, --features rio-v2 --tests, --features test-util --tests. cargo nextest run -p rustfs-ecstore 4096 passed; clippy --lib --tests -D warnings clean; make pre-commit exit 0. Note that clippy is what caught the orphaned re-export above: cargo check and pre-commit both treat unused_imports as a warning.
Ref rustfs/backlog#1823 (step 2, final root).
* chore(ecstore): correct inaccurate dead_code reasons in the bucket root
Six items were labelled 'asserted by this file's tests' or as MinIO-parity
entry points while having no caller at all - free get_bucket_acl_config and
created_at only reach their own live methods (production goes through
created_at_in), BucketVersioningSys::get_in, utils::serialize_content and
ServiceType have no reference anywhere, and with_transition_queue_env_async
is an unused test fixture, not a tier entry point. Name what each one is so
the next reader does not assume coverage that is not there.
Ref rustfs/backlog#1823.
* fix(tier): gate exact remote version consumption
Reject non-empty remote tier versions before transitioned GET and remote delete backend I/O when the tier backend does not support exact version operations.
Co-Authored-By: heihutu <heihutu@gmail.com>
* test(tier): split mock remote version validation fault
Separate one-shot mock remote version validation failures from persistent unsupported-backend behavior so cleanup durability tests can still verify exact-version recovery while #1358 fail-closed gate tests keep asserting no backend I/O.
Co-Authored-By: heihutu <heihutu@gmail.com>
---------
Co-authored-by: heihutu <heihutu@gmail.com>
* fix(tiering): make rejected upload cleanup durable
* fix(tiering): close transition upload cancellation gap
* test(tiering): cover failed upload without candidate
* test(tiering): synchronize cancelled cleanup recovery
* test(tiering): stabilize cancelled cleanup recovery
Prefer cancellation when the tier delete journal recovery worker is racing an immediate tick, and build the cancelled-cleanup regression store with an already-cancelled token so production recovery cannot consume the test journal.
Co-Authored-By: heihutu <heihutu@gmail.com>
---------
Co-authored-by: houseme <housemecn@gmail.com>
Co-authored-by: heihutu <heihutu@gmail.com>
* fix
* chore: upgrade cryptography libraries to RC versions
- Upgrade aes-gcm to 0.11.0-rc.2 with rand_core support
- Upgrade chacha20poly1305 to 0.11.0-rc.2
- Upgrade argon2 to 0.6.0-rc.2 with std features
- Upgrade hmac to 0.13.0-rc.3
- Upgrade pbkdf2 to 0.13.0-rc.2
- Upgrade rsa to 0.10.0-rc.10
- Upgrade sha1 and sha2 to 0.11.0-rc.3
- Upgrade md-5 to 0.11.0-rc.3
These upgrades provide enhanced security features and performance
improvements while maintaining backward compatibility with existing
encryption workflows.
* add
* improve code
* fix
This commit introduces a significant reorganization of the project structure to improve maintainability and clarity.
Key changes include:
- Adjusted the directory layout for a more logical module organization.
- Removed unused crate dependencies, reducing the overall project size and potentially speeding up build times.
- Updated import paths and configuration files to reflect the structural changes.