ci(upgrade): run rc.5 multipart layout checks (#7421)

Wire the existing rc.5 multipart upgrade and diagnostic baseline tests into the upgrade matrix.
This commit is contained in:
Zhengchao An
2026-09-07 23:58:02 +08:00
committed by GitHub
parent 1a5e2b6256
commit 27d167f7b6
+8
View File
@@ -82,6 +82,14 @@ jobs:
cache_key: e2e-odm-config-rollback
test: rc5_rollback_requires_restoring_odm_configuration
artifact: odm-config-rollback
- name: Multipart layouts survive the rc.5 upgrade
cache_key: e2e-multipart-layout-upgrade
test: direct_upgrade_from_rc5_preserves_multipart_layouts
artifact: multipart-layout-upgrade
- name: rc.5 multipart replication baseline
cache_key: e2e-multipart-layout-baseline
test: rc5_baseline_replicates_multipart_layouts
artifact: multipart-layout-baseline
runs-on: ubuntu-latest
timeout-minutes: 60
env: