Since 4 October 2026 releases are mechanical: the release train cuts the next minor from main 14 days after the last stable (or earlier on request), soaks the release candidate on Preview for 24 hours, and promotes it unchanged unless an open release-blocker issue stops it. The shipped release docs, the promotion policy, the checklist, the source of truth, several governance pages and two workflow comments still described the retired model: release lines, steward judgment, 72-hour soaks, a nightly rehearsal and patch releases scheduled by severity. State the train's rules once, in the Release Train section of the promotion policy, checked against the train itself, and point the rest at it. Remove the unused internal copy of the promotion resolver, which still enforced the old 72-hour soak.
4.5 KiB
Releases and update channels
Use Stable for production and Preview when you want to help test upcoming changes. Preview releases state what is ready to test, what remains uncertain, and how to return to the previous stable version.
Pulse's earlier releases did not consistently give testers enough time between candidates. From October 2026, releases run on a fixed train: a release candidate is cut on a regular schedule, tested as published, and promoted to stable unchanged. These are the commitments for releases going forward, not a claim that earlier releases met them.
Choose your update channel
| Channel | Who it is for | What to expect |
|---|---|---|
| Stable | Normal use, including production | A release qualified for general use after release-candidate testing. This is the default and recommended channel. |
| Preview | People willing to test and report problems | Opt-in prereleases. Read the version's maturity, known issues, test instructions, and rollback guidance before installing. |
Preview contains different maturity stages, rather than a separate update channel for each stage:
- Alpha is incomplete or experimental and intended for tightly controlled testing.
- Beta is the normal public testing stage. Its scope should be useful to test, but known gaps and further product changes are expected.
- Release candidate (RC) means the build is believed capable of becoming stable without further product changes. It is still a prerelease.
A beta does not become stable directly. It must be followed by a qualified RC. Choosing Preview does not make a beta production-qualified. Pulse's unattended systemd updater remains Stable-only. See Automatic updates for deployment-specific update behaviour.
How releases are prepared
Releases follow a fixed schedule rather than individual judgment.
- Cut a candidate from
main. Fourteen days after the last stable release, the next release candidate is cut frommain, providedmainhas changed since that release. An important fix that should not wait for the schedule can bring that cut forward, or replace a candidate that is still soaking with a fresh one that starts its own soak. A candidate carries everything merged tomainat the cut. Nothing is selected for it or added to it afterwards. - Qualify and publish it. Required checks include targeted tests, installation smoke checks, release-pipeline validation, and recorded rollback instructions. RCs also run the integration checks required for stable releases. Release notes explain the changes, known issues, what testers should exercise, and the rollback target. A tag or successful build alone is not a published release.
- Soak it on Preview. The published candidate soaks for 24 hours on the Preview channel.
- Promote it unchanged. After a clean soak, the same candidate is promoted to stable. Release metadata may change, but product content cannot.
Cadence and stable promotion
- Each release is the next minor version: after
6.5.0comes6.6.0. Patch releases are not scheduled. - Only an open issue labelled
release-blockerstops a promotion. That label marks something that worked in the current stable release but is broken in the candidate. Each such issue is closed once its fix is onmain. When every one is closed, a fresh candidate is cut frommainand starts its own 24-hour soak. - Successive candidates for the same version are published at least 24 hours apart. Time spent on a beta does not count towards an RC's soak.
- A defect that the current stable release already has is fixed on
mainand ships in the next release.
An urgent hotfix exception requires active customer harm and a justification recorded in the release notes. Narrow testing may instead use an immutable reporter test image. Such an image is a temporary diagnostic build and cannot be promoted directly to stable.
Taking part in Preview testing
Start with the published release notes. Back up your data, keep the documented rollback version available, and exercise the checks relevant to your installation. You do not need to install every preview.
When reporting a problem, include the exact version, deployment method, expected and observed behaviour, and reproduction steps. Remove credentials and other private information from logs and screenshots. Confirmation that a named test worked is useful too.