L.B closes C-005; L.A defers C-003 (refactor required); L.C operator-required (testcontainers); L.CI raises CI thresholds for ACME / StepCA / MCP.
L.B — StepCA (~580 LoC stepca/jwe_failure_test.go):
Strategy: hermetic test-side RFC 3394 AES Key Wrap implementation
constructs a valid step-ca PBES2-HS256+A128KW + A128GCM provisioner-
key JWE in-test, exercises the full decrypt pipeline end-to-end.
Coverage: 52.1% -> 90.4% (+38.3pp; +5.4 above 85% target)
decryptProvisionerKey: 0% -> 89.7%
aesKeyUnwrap: 0% -> 100.0%
jwkToECDSA: 0% -> 100.0%
loadProvisionerKey: 0% -> 76.9%
Tests (24 functions):
JWE round-trip pinning all 4 0%-covered helpers
decryptProvisionerKey: 10 negative-path cases (malformed JSON,
bad protected b64, malformed header JSON, unsupported alg,
unsupported enc, bad p2s/encrypted_key/IV/ciphertext/tag b64)
Wrong-password path: AES key unwrap integrity check fail
aesKeyUnwrap: too-short, not-mult-of-8, bad-KEK-size, bad-IV
jwkToECDSA: unsupported curve + bad x/y/d b64 + all-curves
loadProvisionerKey: round-trip + file-not-found
IssueCertificate failure modes (network/5xx/401/403)
RevokeCertificate failure modes (network/5xx/403)
L.A — cmd/server (DEFERRED):
cmd/server's 16.1% baseline is dominated by main()'s 1041-LoC
startup body which is 0%-covered. The other named functions
(preflight* + buildFinalHandler + tls.go) are at 85-100% already.
Lifting overall to >=75% requires a production-code refactor
(extract main() into testable Run(*Config)) that exceeds Bundle
L.A's test-only scope. Tracked as 'Bundle L.A-extended'.
L.C — Repository (OPERATOR-REQUIRED):
testcontainers + Docker not available in sandbox. Operator runs
go test -tags integration ./internal/repository/postgres/...
on a workstation with Docker.
L.CI — CI threshold raise #1 (.github/workflows/ci.yml):
ACME issuer: >=50% (Bundle J floor; bumps to 85 with Pebble-mock)
StepCA issuer: >=80% (Bundle L.B floor with 10pp margin from 90.4)
MCP: >=85% (Bundle K floor with 8pp margin from 93.1)
cmd/server raise deferred until Bundle L.A-extended lands.
YAML validated; each gate fails CI with 'add tests, do not lower
the gate' message matching L-010's pattern.
Verification:
go vet ./internal/connector/issuer/stepca/... clean
gofmt -l clean
staticcheck -checks all clean
go test -short ./internal/connector/issuer/stepca/ PASS, 90.4%
go test -race -count=1 PASS, 0 races
python3 -c 'yaml.safe_load(...)' YAML OK
Audit deliverables:
findings.yaml: C-005 status open -> closed; C-003 open -> deferred
gap-backlog.md: closure log + C-005 strikethrough + C-003/C-004 notes
coverage-matrix.md: stepca row at 90.4%
closure-plan.md: Bundle L [~] with per-sub-bundle status
CHANGELOG.md: [unreleased] Bundle L entry