shankar0123 f6fa898b9a ci-pipeline-cleanup Phase 0: baseline + frozen decisions + Bundle II revisions
Bundle: ci-pipeline-cleanup, Phase 0.

Captures all 12 baseline measurements at HEAD c48a82c4 (tag v2.0.66):
- ci.yml shape (1488 lines, 53 named steps, 22 regression-guard steps)
- 4 Dockerfiles in repo
- 24/24 migration up/down balance
- 136 OpenAPI operationIds vs 149 router Register calls (13-route gap
  for Phase 9 root-cause)
- 11 vendor sidecars + 1 always-on nginx in deploy/docker-compose.test.yml
- 19 status checks per push (target after cleanup: 7)

Locks the 14 Phase-0 frozen decisions in cowork/ci-pipeline-cleanup/
frozen-decisions.md. Two of them deliberately revise Bundle II
decisions:
- Decision 0.4 revises Bundle II 0.9 (vendor matrix collapse)
- Decision 0.5 revises Bundle II 0.4 (Windows IIS matrix deletion)

Both revisions are documented with rationale + preservation note in
cowork/ci-pipeline-cleanup/decisions-revised.md. Verified failure-log
evidence cited for the Windows matrix (CI run 25183374742) +
verified source-grep evidence for the t.Log-only vendor-edge tests
(115 of 116).

Two operator-on-workstation deliverables explicitly deferred to
their respective Phases:
- Live SA1019 site count (Phase 3 pre-flight)
- RAM headroom on prototype branch with collapsed vendor-e2e (Phase 5
  pre-merge gate)

No code changes in this commit — Phase 0 is documentation + measurement
+ frozen-decision lock-in only.
2026-04-30 20:24:12 +00:00

5.1 KiB
Raw Blame History

CI Pipeline Cleanup — Deliberate Revisions of Bundle II Decisions

This bundle deliberately revises two Bundle II frozen decisions. Both revisions are recorded here for audit trail and acknowledged in the per-Phase commits that implement them.

Bundle II decision 0.4 → revised by ci-pipeline-cleanup decision 0.5

Bundle II 0.4 (original): "IIS e2e strategy — mcr.microsoft.com/windows/servercore:ltsc2022 Windows containers via Docker Desktop on Windows hosts. Linux CI runners CAN'T run Windows containers, so the IIS e2e suite runs on a separate Windows-runner CI matrix job (or operator's local Windows host for development). Documented limitation."

ci-pipeline-cleanup 0.5 (revision): Delete the Windows-runner CI matrix entirely.

Rationale for revision:

  1. The matrix can't physically work on windows-latest GitHub-hosted runners today. Verified via the failure logs from CI run 25183374742 (commit 1de61e9):

    • wincertstore job: error during connect: ... open //./pipe/docker_engine: The system cannot find the file specified — Docker daemon not started in Windows-containers mode.
    • iis job: image pulled successfully (so the new digest is correct), then died at failed to create network deploy_certctl-test: could not find plugin bridge in v1 plugin registry: plugin not foundbridge network driver doesn't exist on Windows Docker (uses nat).
  2. Even if both Docker-daemon and network-driver issues were fixed, the matrix would validate nothing of substance. Verified by source-grep: all 16 functions matching TestVendorEdge_(IIS|WinCertStore)_* in deploy/test/vendor_e2e_phase3_to_13_test.go are t.Log placeholders that exercise no IIS-specific behavior. The real IIS connector validation lives in internal/connector/target/iis/ unit tests (run on Linux in go-build-and-test — already green per push).

  3. Bundle II decision 0.14 explicitly required operator manual smoke against a real instance for "verified" status in the vendor matrix. Moving IIS + WinCertStore validation to a documented operator playbook in docs/connector-iis.md satisfies that criterion better than a fake CI matrix that passes by skipping.

Preservation: the windows-iis-test sidecar stays in deploy/docker-compose.test.yml under profiles: [deploy-e2e-windows] — operators on a Windows host can opt in via docker compose --profile deploy-e2e-windows up -d windows-iis-test. Linux CI never activates this profile.

Bundle II decision 0.9 → revised by ci-pipeline-cleanup decision 0.4

Bundle II 0.9 (original): "CI parallelism — Each vendor e2e gets its own GitHub Actions matrix job. Vendor failures surface independently in the CI status check (operator sees 'K8s 1.31 vendor-edge fail' as a discrete check, not a generic 'integration tests failed')."

ci-pipeline-cleanup 0.4 (revision): Single deploy-vendor-e2e job replaces the 12-job matrix; per-vendor visibility partially restored via skip-detection guard messages.

Rationale for revision:

  1. The per-vendor granularity Bundle II decision 0.9 was designed to provide is fake signal. Verified by source-analysis at HEAD:

    $ grep -cE 't\.Log\(' deploy/test/{vendor_e2e_phase3_to_13,nginx_vendor_e2e}_test.go
    deploy/test/nginx_vendor_e2e_test.go:9
    deploy/test/vendor_e2e_phase3_to_13_test.go:106
    
    $ awk '/^func TestVendorEdge_/{in_test=1; name=$2; has_assert=0; next}
           in_test && /^}$/ {if (has_assert) print name; in_test=0}
           in_test && /t\.(Fatal|Error|Errorf|Fatalf|Fail|Failf)/ {has_assert=1}' \
           deploy/test/vendor_e2e_phase3_to_13_test.go deploy/test/nginx_vendor_e2e_test.go
    TestVendorEdge_NGINX_HighConcurrencyDeployUnderLoad_E2E
    

    115 of 116 vendor-edge test functions are t.Log-only — they spin up a sidecar, log a one-line description of the vendor quirk, and return. Only 1 has a real assertion.

  2. Per-vendor status-check granularity costs ~9 sec setup overhead × 12 jobs = ~108 sec of pure runner waste per push (verified from CI run 25183374742 job timings).

  3. The single-job version partially restores per-vendor visibility via the skip-detection guard (decision 0.6): if a sidecar fails to start, the affected tests' SKIP names print in the CI output and the build fails. Operators see "TestVendorEdge_K8s_KubeletSyncWaitContract_DefaultTimeout60s_E2E SKIPPED: vendor sidecar 'k8s-kind' not reachable" — same per-vendor signal, just no longer rendered as a separate status-check row.

Preservation: the per-test discoverability via go test -run 'VendorEdge_<vendor>' (Bundle II frozen decision 0.6) is unchanged. Only the matrix-jobs-per-vendor part of decision 0.9 is revised; the per-test naming convention stays.

Forward-looking note

Both revisions are limited in scope to CI execution shape — they do NOT delete the test files, the sidecar definitions, or the documentation that Bundle II shipped. Future work could re-introduce per-vendor matrix jobs if test bodies are filled in with real assertions (transforming the t.Log placeholders into actual contract pins). At that point, decision 0.4 + 0.9 should be re-evaluated.