shankar0123 f6fa898b9a ci-pipeline-cleanup Phase 0: baseline + frozen decisions + Bundle II revisions
Bundle: ci-pipeline-cleanup, Phase 0.

Captures all 12 baseline measurements at HEAD c48a82c4 (tag v2.0.66):
- ci.yml shape (1488 lines, 53 named steps, 22 regression-guard steps)
- 4 Dockerfiles in repo
- 24/24 migration up/down balance
- 136 OpenAPI operationIds vs 149 router Register calls (13-route gap
  for Phase 9 root-cause)
- 11 vendor sidecars + 1 always-on nginx in deploy/docker-compose.test.yml
- 19 status checks per push (target after cleanup: 7)

Locks the 14 Phase-0 frozen decisions in cowork/ci-pipeline-cleanup/
frozen-decisions.md. Two of them deliberately revise Bundle II
decisions:
- Decision 0.4 revises Bundle II 0.9 (vendor matrix collapse)
- Decision 0.5 revises Bundle II 0.4 (Windows IIS matrix deletion)

Both revisions are documented with rationale + preservation note in
cowork/ci-pipeline-cleanup/decisions-revised.md. Verified failure-log
evidence cited for the Windows matrix (CI run 25183374742) +
verified source-grep evidence for the t.Log-only vendor-edge tests
(115 of 116).

Two operator-on-workstation deliverables explicitly deferred to
their respective Phases:
- Live SA1019 site count (Phase 3 pre-flight)
- RAM headroom on prototype branch with collapsed vendor-e2e (Phase 5
  pre-merge gate)

No code changes in this commit — Phase 0 is documentation + measurement
+ frozen-decision lock-in only.