Commit Graph

2 Commits

Author SHA1 Message Date
shankar0123 7c134d0575 docs: retire compliance subtree + sweep framework name-drops from prose
Per operator decision the framework-mapping docs are gone. They
were aspirational (no audit, no certification, no validated
mapping); keeping them around was misleading.

Files deleted (1,883 lines):
- docs/compliance/index.md
- docs/compliance/soc2.md
- docs/compliance/pci-dss.md
- docs/compliance/nist-sp-800-57.md

Hyperlinks removed:
- README.md: 'Auditor / compliance' row in the doc table; the
  '(compliance mapping included)' parenthetical in the
  positioning paragraph
- docs/README.md: the '## Compliance' section table; the
  'Auditor / compliance team' reading-order-by-role row

Prose name-drops swept across 24 files:
- README.md: 'FedRAMP boundary CAs / financial-services policy
  CAs' → '4-level boundary CAs / 3-level policy CAs';
  'Compliance-grade for PCI-DSS Level 1, FedRAMP Moderate / High,
  SOC 2 Type II, HIPAA' → cut entirely
- getting-started/{quickstart,concepts,examples,why-certctl,
  advanced-demo}.md: 'compliance' → 'audit' / 'policy';
  'PCI-DSS / SOC 2 / NIST SP 800-57' framework lists cut;
  ''pci': 'true'' tag example → ''environment': 'production''
- migration/cert-manager-coexistence.md: 'compliance rules' →
  'policy rules'
- operator/approval-workflow.md: 'Compliance customers (PCI-DSS
  Level 1, FedRAMP Moderate / High, SOC 2 Type II, HIPAA)' →
  'Operators'; entire 'Compliance control mapping' table
  (PCI-DSS §6.4.5 / NIST SP 800-53 SA-15 / SOC 2 Type II CC6.1
  / HIPAA §164.308(a)(4)) deleted; 'compliance contract' →
  'two-person-integrity contract'; 'compliance auditors' →
  'reviewers'
- operator/legacy-clients-tls-1.2.md: 'PCI-DSS v4.0 Req 4 §2.2.5'
  audit-reference → CWE-326 (kept); 'PCI-DSS Req 4 §2.2.5
  attestation' section retitled to 'TLS posture summary' and
  rewritten without framework framing; 'PCI-DSS, NIST, and
  major browsers will eventually deprecate TLS 1.2' →
  'Major browsers and OS vendors will eventually deprecate
  TLS 1.2'
- operator/database-tls.md: PCI-DSS Req 4 §2.2.5 audit-ref →
  CWE-319 only; 'PCI-DSS scope' → 'sensitive data'; PCI-DSS
  Req 4 v4.0 prose footing → cut
- operator/runbooks/disaster-recovery.md: 'SOC 2 / PCI
  procurement-team deliverable' → 'on-call deliverable';
  'compliance auditors' → 'reviewers'
- reference/connectors/{acme,aws-acm,azure-kv,globalsign,
  local-ca,openssl,ssh,index}.md: 'compliance reporting
  (PCI-DSS §3.6, HIPAA §164.312)' → 'audit reporting';
  'Compliance environments (PCI-DSS Level 1, FedRAMP High,
  HIPAA)' → 'Regulated environments'; 'compliance audits' →
  'audit'; 'FedRAMP boundary CA' pattern names →
  '4-level boundary CA' (technically descriptive)
- reference/protocols/est.md: 'compliance-hook seam' →
  'device-state hook seam'; 'compliance gating' → 'device-state
  gating'; 'est_compliance_failed' → 'est_device_state_failed'
- reference/protocols/scep-intune.md: 'Optional compliance
  check' → 'Optional device-state check'; failure-counter
  'compliance_failed' → 'device_state_failed'; 'Conditional
  Access compliance gating' → 'Conditional Access
  device-state gating'
- reference/intermediate-ca-hierarchy.md: 'FedRAMP boundary-CA
  deployments where the regulator requires...' →
  'Boundary-CA deployments where you want separation of policy
  and issuing authorities'; pattern A retitled '4-level FedRAMP
  boundary CA' → '4-level boundary CA'
- reference/architecture.md: broken Related-docs link to
  compliance.md removed; the rest of that block had stale
  pre-Phase-2 paths (quickstart.md, demo-advanced.md,
  connectors.md, openapi.md, testing-guide.md, test-env.md) —
  retargeted to current locations
- reference/deployment-model.md: 'SOC 2 evidence-report
  generator' → 'Audit-evidence report generator'
- reference/vendor-matrix.md: 'SOC 2 / PCI auditors paste this
  into evidence packs' → 'reviewers paste this into
  vendor-evaluation packs'
- contributor/qa-test-suite.md: 'compliance exist' coverage
  description cut; 'Compliance (PCI / SOC2 / HIPAA-relevant)'
  risk-class label → 'Audit-relevant'

What was kept:
- CWE references (legitimate technical pointers)
- Microsoft API/feature names that happen to use 'compliance'
  literally ('Microsoft Graph compliance API',
  'device-compliance validators' — these are MS product names,
  not framework name-drops)
- 'NIST PQC' on the landing page (Post-Quantum Cryptography is
  the actual NIST standard family, not a compliance framework)

Verified: zero hyperlinks into docs/compliance/ remain. All 24
ci-guards/*.sh pass locally. qa-doc-seed-count.sh clean.
Net diff: 26 files / -1,883 deletions in compliance/ + -32 net
across the prose sweep.

Companion edits in cowork/ (CLAUDE.md doc-tree summary +
WORKSPACE-CHANGELOG.md retirement note) land separately.
2026-05-05 05:26:44 +00:00
shankar0123 8aa291d948 docs: Phase 4 follow-on batch 4 — 5 final target per-pages
Extracts the remaining target connectors:

- ssh.md (194 lines) — agentless SSH/SFTP deploy with full
  host-key-acceptance threat model (what's accepted, what's not,
  mitigations including known_hosts enforcement and SSH cert auth);
  V3-Pro forward path
- wincertstore.md (118 lines) — non-IIS Windows services via local
  PowerShell or WinRM proxy mode; store selection (My / Root /
  WebHosting); private-key permissions guidance
- jks.md (189 lines) — JKS / PKCS#12 via keytool with full atomic
  snapshot+rollback contract (Bundle 8 'snapshot → delete → import →
  reload'), keytool argv password exposure threat model + mitigations
- aws-acm.md (208 lines) — ACM target with full IAM policy, IRSA /
  instance-profile / SSO auth recipes, atomic-rollback contract,
  ALB attachment Terraform recipe, procurement-checklist crib
- azure-kv.md (195 lines) — Key Vault target with managed-identity /
  workload-identity / service-principal auth recipes, version-
  semantics rollback caveat (no in-place restore without soft-delete),
  App Gateway / Front Door attachment recipe

Index forward-list expanded to enumerate all 15 target connectors
(5 from Phase 4 structural + 5 from batch 3 + 5 from this batch) in
alphabetical order.

This is part 4 of 4 for the Phase 4 follow-on (per-connector page
extraction) tracked in cowork/docs-overhaul-phase-2-restructure-2026-05-04/log.md.

Net add: 5 files, 904 lines. No content removed from index.md.

End-state of Phase 4 follow-on:
- 13 issuer per-pages (5 batch 1 + 8 batch 2)
- 15 target per-pages (5 Phase 4 structural + 5 batch 3 + 5 batch 4)
- index.md keeps its inline reference content; per-pages add
  operator depth on top, matching the pattern set by
  apache/f5/iis/k8s/nginx in Phase 4 structural
2026-05-05 04:07:21 +00:00