Mechanical reformat. The new 'gofmt drift' CI step (added in
ci-pipeline-cleanup Phase 4, commit 0f205a8) surfaced 111 files
with accumulated gofmt drift across cmd/, internal/, and deploy/test/.
Each file's diff is gofmt-standard: whitespace adjustments, intra-
group import sorting (alphabetical by import path within blank-line-
separated groups), and struct-tag column alignment. No semantic
changes — verified via 'git diff --ignore-all-space' which shows only
the line-position deltas from import reordering.
The gate stays in place after this commit. Going forward it catches
gofmt drift at PR time.
Closes M-001 partially; M-002, M-003, and CI threshold raise #2 deferred.
Stubs coverage shipped across 8 issuer connectors via per-connector
<conn>_stubs_test.go (~50 LoC each) pinning the not-supported
issuer.Connector interface methods (GenerateCRL, SignOCSPResponse,
GetCACertPEM, GetRenewalInfo). Most CAs delegate CRL/OCSP/CA-cert
distribution to managed services, so these are documented stubs that
return errors. Pinning them ensures the stubs aren't silently replaced
with no-ops in a future refactor.
Coverage delta:
digicert: 79.3% -> 81.0% (+1.7pp)
ejbca: 75.8% -> 76.5% (+0.7pp)
entrust: 70.8% -> 70.8% (stubs already covered)
sectigo: 78.0% -> 79.4% (+1.4pp)
vault: 81.0% -> 84.1% (+3.1pp)
openssl: 76.9% -> 78.0% (+1.1pp)
googlecas: 81.0% -> 83.4% (+2.4pp)
globalsign: 75.9% -> 78.2% (+2.3pp)
(awsacmpca not included; its 0%-coverage hotspots are stubClient methods
structurally different from the others' interface stubs. Already at 83.5%.)
Why the gates aren't yet met: the stub functions are tiny (1-2 lines
each, mostly 'return nil, fmt.Errorf("not supported")'). Lifting each
connector to >=85% requires per-connector failure-mode test files
mirroring Bundle J's ACME pattern (httptest.Server + canned 401/403/
429+Retry-After/5xx/malformed responses against the actual API methods).
That's ~200-300 LoC x 9 connectors = ~2000-2700 LoC of bespoke per-CA
mock work; exceeds this session's budget. Tracked as follow-on
Bundle N.A-extended / N.B-extended.
Deferred sub-batches:
N.C (M-002 + M-003): internal/service (70.5%) + internal/api/handler
(79.4%) round-out NOT YET STARTED. Tracked as Bundle N.C-extended.
N.CI (CI threshold raise #2): prescribed raises require underlying
coverage at proposed floors first. Premature raise would fail CI
immediately. Tracked as Bundle N.CI-extended.
Verification:
go vet ./internal/connector/issuer/{8-pkgs}/... clean
gofmt -l clean
go test -short -count=1 PASS for all 8
Audit deliverables:
gap-backlog.md: M-001 partial-strikethrough with per-connector table
+ Bundle N closure-log entry covering all 4 sub-batch statuses
closure-plan.md: Bundle N [~] with per-sub-batch status breakdown
CHANGELOG.md: [unreleased] Bundle N entry
Enforce certificate profile crypto constraints across all 5 issuance paths
(renewal, agent CSR, EST, SCEP). ValidateCSRAgainstProfile() rejects CSRs
with key algorithm/size that don't match profile rules. MaxTTL enforcement
caps certificate validity per issuer connector (Local CA, Vault, step-ca
enforce directly; ACME/DigiCert/Sectigo pass through). Key algorithm and
size are now persisted in certificate_versions for audit compliance.
16 new tests (12 service-layer + 4 Local CA connector). Removes hardcoded
version number from GUI sidebar. Documentation updated across architecture,
features, connectors, and README.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
Convert `switch { case r.URL.Path == ... }` to `switch r.URL.Path { ... }`
in Vault and DigiCert connector tests to pass golangci-lint CI.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>