Commit Graph

2 Commits

Author SHA1 Message Date
shankar0123 5dc698307b chore: rename Go module path to github.com/certctl-io/certctl
Mechanical sed across the main go.mod's module declaration, the f5-mock-icontrol
sub-module's go.mod, every Go file's import path (361 files), and a rebuild of
the checked-in f5-mock-icontrol binary so its embedded build-info reflects the
new module path. No behavior change.

Choice B from cowork/transfer-certctl-to-org.md, executed 2026-05-04. Choice A
(keep module path declared as github.com/shankar0123/certctl regardless of
repo URL) shipped on the day of the org transfer (2026-05-03) since we had no
external Go consumers; this commit closes that deferral.

Backward-compat: GitHub HTTP redirects continue to forward
github.com/shankar0123/certctl → github.com/certctl-io/certctl at the URL
level, but Go's module proxy uses the path declared in go.mod as the
canonical name. Pre-fix, anyone trying `go get github.com/certctl-io/certctl/...`
hit a "module path mismatch" error because go.mod said
github.com/shankar0123/certctl and the URL they fetched it from said
certctl-io/certctl. Post-fix, the canonical name and the URL agree, so
go get / go install / external Go consumers / Go-tooling integrations
work cleanly via either the new path (preferred) or the old path (which
redirects and Go follows the redirect for source fetch).

Anyone still importing the old path inside their own code keeps working
provided they update their go.mod's `require` line to match — the module
path declared in their consumer's go.sum / go.mod is the authoritative
import name, so a mass sed across their import statements is the migration
on the consumer side. No external consumers exist today.

Diff shape:
  361 *.go files  — import path replacement only
    2 go.mod     — module declaration replacement only
    1 binary     — deploy/test/f5-mock-icontrol/f5-mock-icontrol rebuilt
                   so embedded build-info reflects the new path (8618965 vs
                   8618933 bytes; 32-byte diff is the build-info change)

  Total: 364 files, 730 insertions / 730 deletions, net-zero size, pure
  mechanical substitution.

Verification:
  gofmt: 17 files needed re-alignment after sed (the new path is one char
    shorter than the old, so column-aligned import groups drifted). Applied
    `gofmt -w` to fix.
  go mod tidy: clean exit on both modules.
  go vet ./...: clean exit.
  go build ./...: clean exit.
  go test -short -count=1 on representative packages: all green
    (internal/domain, internal/validation, internal/crypto, internal/crypto/signer,
    cmd/agent). Test output now reads `ok github.com/certctl-io/certctl/...`
    confirming the module path resolves correctly.
  binary: f5-mock-icontrol rebuilt; `strings | grep shankar0123` returns
    nothing; `strings | grep certctl-io/certctl` shows the new module path
    embedded in build-info.

Files intentionally NOT touched in this commit:
  README.md / CHANGELOG.md / docs/ / etc. — already swept to certctl-io
    URLs in commit bc6039a (the post-transfer URL refresh). This commit is
    purely the Go-tooling layer.
  Scarf pixels (`shankar0123.docker.scarf.sh/...`) — Scarf-account
    namespace, not a Go import or GitHub repo URL. Stays.

This is a non-blocking, non-customer-impacting change. Operators pulling
container images, running `make verify`, hitting the API, or installing the
agent see no functional difference. Only Go-tooling consumers (none today)
are affected, and they're enabled — not broken — by this commit.
2026-05-04 00:30:29 +00:00
Shankar cdacac6bbe crl/ocsp: admin observability endpoint + Phase 6 e2e scaffold
Phase 5 (admin endpoint slice) + Phase 6 (e2e test stub) of the
CRL/OCSP responder bundle. Closes the deferred items from the
backend-slice merge (4e234fa).

What landed:

  Phase 5 — admin observability:
  * GET /api/v1/admin/crl/cache (handler.AdminCRLCacheHandler):
    - Per-issuer cache state + most recent N generation events
    - Admin-gated via middleware.IsAdmin (M-003 pattern); non-admin
      callers get 403 + the service is never invoked
    - Reveals issuer set + CRL cadence, hence the gate
    - Returns CachePresent=false rows for never-generated issuers so
      the GUI can show 'not yet generated' instead of 404
    - Per-issuer Get failures decorate the row's RecentEvents rather
      than failing the whole response
  * AdminCRLCacheServiceImpl: thin handler-side composition over
    repository.CRLCacheRepository + an issuer-IDs callback (avoids
    importing internal/service from internal/api/handler)
  * M-008 admin-gate pin updated: admin_crl_cache.go added to
    AdminGatedHandlers; full triplet of tests
    (NonAdmin_Returns403, AdminExplicitFalse_Returns403,
    AdminPermitted_ForwardsActor) + RejectsNonGetMethod +
    PropagatesServiceError
  * Router registration + HandlerRegistry field + main.go wiring
    (callback closure over issuerRegistry.List)
  * OpenAPI entry under CRL & OCSP tag

  Phase 6 — e2e scaffold:
  * deploy/test/crl_ocsp_e2e_test.go with TestCRLOCSPLifecycle +
    TestCRLOCSPPostEndpoint
  * Lifecycle test exercises issue → fetch OCSP (Good) → revoke →
    wait → fetch CRL (entry present) → fetch OCSP (Revoked) →
    verify dedicated responder cert + id-pkix-ocsp-nocheck
  * Helpers (issueLocalCert, revokeCertViaAPI, fetchCRL, fetchOCSP,
    fetchCACert) currently call t.Skip with TODO markers — sandbox
    has no Docker so the harness can't be wired end-to-end here;
    when CI / a fresh dev workstation runs, the implementer wires
    each helper to the existing integration_test.go primitives
  * Build-tagged //go:build integration so the standard go test
    sweep skips it; runs via the deploy/test integration workflow

Coverage: handler 80.6% (above 75 floor; was 79.8% pre-Phase-5).
All other packages unchanged.

Backward compat: admin endpoint inert until an admin Bearer key is
configured. The e2e test stub is no-op (skips) until wired.

Deferred:
  * GUI cert-detail-page revocation panel — pure frontend work, no
    backend impact, separate session
  * E2E test helper wiring — depends on extracting the existing
    integration-test harness primitives into shared helpers; doable
    in a follow-up that has Docker available
  * V3-Pro polish (delta CRLs, OCSP rate-limiting, OCSP stapling)
2026-04-29 01:55:39 +00:00