The README's Quick Start, the qa-prerequisites contributor doc, and the
landing page (separate repo, separate commit) all shipped a copy-paste
command that produces:
service "certctl-server" has neither an image nor a build context
specified: invalid compose project
The bug landed silently with commit a3d8b9c (the U-3 master). Pre-U-3,
docker-compose.demo.yml was self-contained and could be invoked with a
single -f flag. U-3 deliberately reduced it to a 27-line overlay — its
only payload today is `CERTCTL_DEMO_SEED=true` on the certctl-server
service — because the demo seed now applies at boot via
postgres.RunDemoSeed, not via /docker-entrypoint-initdb.d/. The overlay
no longer carries an image: or build: of its own, so it MUST be passed
alongside the base file.
The README/qa-doc/landing-page never picked up the rename of the contract.
Every operator who copy-pasted the Quick Start since U-3 has hit the
"invalid compose project" error and bounced. The operator caught it
running the demo locally today.
This commit fixes the three certctl-repo sites:
README.md (Quick Start)
docker compose -f deploy/docker-compose.demo.yml up -d --build
→
docker compose -f deploy/docker-compose.yml -f deploy/docker-compose.demo.yml up -d --build
Plus the "drop the -f flag for clean install" prose now spells out
the correct fallback (`-f deploy/docker-compose.yml` alone).
docs/contributor/qa-prerequisites.md (Step 1)
Same single-file → two-file fix, plus an inline note explaining
why the override-only file requires the base (so the next person
who reads it understands the contract instead of re-discovering it).
deploy/ENVIRONMENTS.md (Demo Overlay → What it adds)
Replaced the stale "One line: mounts seed_demo.sql into PostgreSQL's
init directory" claim — that hasn't been true since U-3 — with the
accurate "One env var: CERTCTL_DEMO_SEED=true; server applies
seed_demo.sql at boot via postgres.RunDemoSeed" description, plus
the historical context for why the overlay can't stand alone.
The certctl.io landing page hits the same bug (line 759); fix shipping
in a separate commit in that repo.
Acceptance gate (manual):
- copy/paste the new README Quick Start command end-to-end against
a fresh clone — succeeds, dashboard at https://localhost:8443
shows the seeded demo data within ~30s.
- clean-install fallback (`docker compose -f deploy/docker-compose.yml
up -d --build`) starts a working stack with no demo data.
Per Phase 1 audit at cowork/docs-overhaul-phase-1-audit-2026-05-04/
and the section-by-section plan in testing-guide-tumor.md.
testing-guide.md was 30% of all docs/ content (8268 lines) but was
integration test code written in markdown, not operator documentation.
The audit's tumor analysis disposed of every Part:
- ~65% DELETE (test cases that already exist in code)
- ~22% MOVE to inline test code
- ~8% KEEP-COMPRESSED into focused operator-runbook docs
- Title + contents + release sign-off ~5% KEEP
This commit ships the KEEP-COMPRESSED dispersal:
docs/contributor/qa-prerequisites.md (NEW, ~120 lines):
From testing-guide.md "Prerequisites" section. Stack boot procedure,
demo data baseline, reference IDs operators reuse across QA docs.
docs/contributor/gui-qa-checklist.md (NEW, ~105 lines):
From testing-guide.md "Part 35: GUI Testing". Manual GUI verification
pass for release sign-off. 25-row table covering every dashboard page.
docs/contributor/release-sign-off.md (NEW, ~130 lines):
From testing-guide.md "Release Sign-Off" section (originally 1009
lines of per-test detail tables). Compressed to a release-day
checklist organized by gate category: code state, automated gates,
manual QA passes, release artefact verification, branch protection,
post-release.
docs/operator/performance-baselines.md (NEW, ~100 lines):
From testing-guide.md "Part 39: Performance Spot Checks". Four
operator-runnable benchmarks (API request handling, inventory list
pagination, scheduler tick, bulk revoke) with baseline numbers and
when-to-re-baseline guidance.
docs/operator/helm-deployment.md (NEW, ~120 lines):
From testing-guide.md "Part 52: Helm Chart Deployment". Operator
runbook for the bundled deploy/helm/certctl/ chart: prereqs,
install, four cert-source patterns, verify, upgrade, troubleshooting.
docs/reference/cli.md (NEW, ~120 lines):
From testing-guide.md "Part 28: CLI Tool". certctl-cli command
reference with command-group breakdown, common workflows
(list/filter, renew, revoke, bulk import, EST enrollment, status),
output formats, CI/CD integration patterns.
docs/README.md navigation index updated to include the 6 new docs:
Reference section gains: cli.md, release-verification.md (was added
in Phase 13)
Operator section gains: helm-deployment.md, performance-baselines.md
Contributor section gains: qa-prerequisites.md, gui-qa-checklist.md,
release-sign-off.md
docs/testing-guide.md deleted. Git history preserves the 8268 lines —
if any specific test case is found missing from inline test code or
the destination docs during future work, lift from `git show
HEAD~1:docs/testing-guide.md`.
Net: docs/ total line count drops by ~7700 lines (28%), from 26,369
to 18,742. testing-guide.md was the single largest doc; pruning it is
the single biggest content-edit win of the entire restructure.
Phase 5 is the last major content phase. Remaining: Phase 4 follow-on
(per-connector page extractions from reference/connectors/index.md),
Phase 15 (WHAT/HOW/WHY remediation), Phase 16 (final acceptance gate).