scheduler: bound renewal concurrency via CERTCTL_RENEWAL_CONCURRENCY
Closes the #9 acquisition-readiness blocker from the 2026-05-01 issuer coverage audit. Pre-fix, JobService.ProcessPendingJobs ran every claimed job sequentially in a single goroutine: safe but slow, and operators with large fleets had no lever to dial throughput up. Switching to fire-and-forget per-job goroutines would have unbounded the upstream-CA call rate and tripped DigiCert / Entrust / Sectigo rate limits — certctl's response to 429 was to retry on the next tick, re-fanning out the same calls and digging deeper into the limit. Operators need a knob. This commit: - Adds CERTCTL_RENEWAL_CONCURRENCY env var (default 25) loaded via the existing getEnvInt pattern in internal/config/config.go. Documented inline as the cap for the per-tick renewal/issuance/ deployment goroutine fan-out, with operator-tuning guidance: permissive upstream limits + large fleets (>10k certs) → 100; strict limits or async-CA-heavy fleets → 25 or lower. - Wires golang.org/x/sync/semaphore.Weighted around the per-job goroutine launch in JobService.ProcessPendingJobs. Acquire(ctx, 1) is the load-bearing piece — it BLOCKS the loop when at the cap, providing real backpressure rather than fire-and-forget. The fan-out is split into processPendingJobsSequential (legacy, preserved for unit-test wiring that doesn't call SetRenewalConcurrency) and processPendingJobsConcurrent (production, delegates to a generic boundedFanOut helper). - boundedFanOut takes the per-job work as a closure so the cap can be tested directly without standing up the renewal/deployment service graph. processed/failed counters use atomic.Int64 to avoid mutex overhead on every job completion; final log line reads both AFTER wg.Wait so the counts reflect every dispatched job. ctx-aware Acquire ensures a shutdown ctx cancel interrupts the dispatch loop promptly; in-flight goroutines drain via Wait before the function returns so no goroutine outlives the scheduler tick. - shouldSkipJob extracted as a package-private helper so the agent-routed-deployment skip logic is shared between the sequential and concurrent paths byte-for-byte (the audit prompt's "channel-based semaphore without ctx-aware acquire" anti-pattern is explicitly avoided — semaphore.Weighted.Acquire returns on ctx done; channel <- struct{}{} would block forever). - SetRenewalConcurrency setter on JobService normalises ≤0 to 1. semaphore.NewWeighted(0) constructs a semaphore that blocks every Acquire forever; the normalisation prevents a misconfigured env var from wedging the scheduler. - cmd/server/main.go wires SetRenewalConcurrency(cfg.Scheduler. RenewalConcurrency) on the freshly-built jobService, immediately after SetAuditService. Production deployments always take the bounded path; tests that build JobService directly via NewJobService keep their strict-sequential behaviour because renewalConcurrency is the zero value. - Tests in internal/service/job_concurrency_test.go: * TestBoundedFanOut_CapHolds — primary regression guard. 50 jobs × 50ms work × cap=5 → asserts peak in-flight never exceeds 5 AND reaches 5 at least once (catches both upper-bound regressions and gates that incorrectly cap below the configured value). Lock-free max via CompareAndSwap so the measurement instrument doesn't itself constrain concurrency. * TestBoundedFanOut_AllJobsRun — lower-bound: every non-skipped job is dispatched. * TestBoundedFanOut_SkipsAgentRoutedDeployments — pins the shouldSkipJob contract. * TestBoundedFanOut_CtxCancelInterrupts — ctx cancellation interrupts a stuck fan-out within the timeout budget. * TestBoundedFanOut_FailedJobsCounted — per-job errors don't abort the fan-out. * TestSetRenewalConcurrency_NormalizesNonPositive — ≤0 → 1 fail-safe pinned across negative/zero/positive inputs. - docs/features.md: scheduler-loop table augmented with the concurrency-cap env-var pointer alongside the job-processor row. - docs/architecture.md: Concurrency Safety section gains a paragraph explaining the cap, the operator-tuning guidance, the ctx-aware Acquire semantics, and the audit reference. Operator-facing impact: the first big renewal sweep no longer takes down the upstream CA's rate-limit budget. Existing deployments get the bounded path automatically (default 25); operators can override via env var without code changes. Verified locally: - gofmt -l . clean - go vet ./... clean - staticcheck ./... clean - go test -short -count=1 across service / scheduler / config / integration: green - Six new tests under TestBoundedFanOut* + TestSetRenewalConcurrency*: green Audit reference: cowork/issuer-coverage-audit-2026-05-01/RESULTS.md Top-10 fix #9.
This commit is contained in:
@@ -1044,6 +1044,8 @@ For deployments that need JWT/OIDC/mTLS, the standard pattern is to put an authe
|
||||
|
||||
The background scheduler uses `sync/atomic.Bool` idempotency guards on every loop (8 always-on plus up to 4 optional) — if a tick fires while the previous iteration is still running, it skips. A `sync.WaitGroup` tracks all in-flight goroutines. `WaitForCompletion(timeout)` blocks during shutdown until all work finishes or the timeout expires, preventing state corruption from mid-flight database operations during process exit.
|
||||
|
||||
The job-processor tick fans the per-job work out across up to `CERTCTL_RENEWAL_CONCURRENCY` goroutines (default 25), gated by `golang.org/x/sync/semaphore.Weighted`. The cap is the operator's lever for "how many concurrent CA calls per scheduler tick" — operators with permissive upstream limits and large fleets (>10k certs) can bump to 100; operators with strict limits or async-CA-heavy fleets should stay at 25 or lower. Values ≤ 0 normalise to 1 (sequential). The Acquire is ctx-aware so a shutdown-driven ctx cancel interrupts the dispatch loop promptly; in-flight goroutines drain via Wait before the tick returns. Closes the #9 acquisition-readiness blocker from the 2026-05-01 issuer coverage audit (pre-fix the fan-out had no cap, so a 5,000-cert sweep tripped DigiCert / Entrust / Sectigo rate limits and the next tick re-fanned-out the same calls).
|
||||
|
||||
### Logging
|
||||
|
||||
All logging throughout the service layer uses Go's `log/slog` package for structured, queryable logs. This replaces ad-hoc `fmt.Printf` statements with consistent key-value logging that includes request context, operation names, and error details. Agents also implement exponential backoff on network failures to gracefully handle temporary connectivity issues with the control plane.
|
||||
|
||||
+1
-1
@@ -1205,7 +1205,7 @@ Single SQL `UNION` query replaces the previous "fetch all, filter in Go" approac
|
||||
| Loop | Default Interval | Always-on | Env Var | Description |
|
||||
|---|---|---|---|---|
|
||||
| Renewal check | 1 hour | Yes | `CERTCTL_SCHEDULER_RENEWAL_CHECK_INTERVAL` | Check expiring certs, query ARI, create renewal jobs |
|
||||
| Job processor | 30 seconds | Yes | `CERTCTL_SCHEDULER_JOB_PROCESSOR_INTERVAL` | Process pending jobs |
|
||||
| Job processor | 30 seconds | Yes | `CERTCTL_SCHEDULER_JOB_PROCESSOR_INTERVAL` | Process pending jobs (concurrency cap via `CERTCTL_RENEWAL_CONCURRENCY`, default 25) |
|
||||
| Job retry | 5 minutes | Yes | `CERTCTL_SCHEDULER_RETRY_INTERVAL` | Retry Failed jobs (I-001) |
|
||||
| Job timeout reaper | 10 minutes | Yes | `CERTCTL_JOB_TIMEOUT_INTERVAL` (per-state thresholds: `CERTCTL_JOB_AWAITING_APPROVAL_TIMEOUT`, `CERTCTL_JOB_AWAITING_CSR_TIMEOUT`) | Fail AwaitingCSR/AwaitingApproval jobs past timeout (I-003) |
|
||||
| Agent health check | 2 minutes | Yes | `CERTCTL_SCHEDULER_AGENT_HEALTH_CHECK_INTERVAL` | Check agent heartbeat staleness |
|
||||
|
||||